No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

17 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents · September 15, 1989

    Union Carbide Texas City Plant Notice of Intention to Demolish or Renovate Asbestos-Containing 1st Effect Reflux Drum, Prepared by J. B. Richard (1989)

    Completed Texas City Plant form (Plant Procedure SH-5.6, Attachment #1, page 3 of 3) giving notice of intent to strip asbestos material from the 1st Effect Reflux Drum in Building 94. It gives an estimated 376 sq. ft. of friable asbestos about 20…

  2. Company document · Union Carbide documents · October 30, 1985

    Union Carbide Texas City Plant Notice of Intention to Demolish or Renovate a Structure Containing Asbestos Material, Condensate Tank (1985)

    A Union Carbide Texas City Plant form (Plant Procedure I-8-5, Attachment #1) giving notice of intention to demolish or renovate a facility containing asbestos material. The handwritten entries describe a condensate tank on the…

  3. Company document · Union Carbide documents · March 3, 1989

    Union Carbide Texas City Plant Notice of Intention to Renovate Asbestos-Containing Steam Trace Tubing, Building B-219 (1989)

    A Texas City Plant form (Plant Procedure, Attachment #1) giving notice of intent to demolish or renovate a facility containing asbestos material. The handwritten entries describe stripping 8 inches of 3/8-inch steam trace tubing in building B-219 to…

  4. Company document · Union Carbide documents · September 23, 1985

    Union Carbide Texas City Plant Notice of Intention to Demolish Temporary Metal Building #89 Containing Asbestos, Plant Procedure I-B-6 Attachment #1 (1985)

    A form titled as a notice of intention to demolish or renovate a structure or facility containing asbestos material, filled out by hand for Building #89 at the Texas City Plant. The entries describe a temporary metal building next to the fire…

  5. Company document · Union Carbide documents · August 14, 1989

    D. R. Schoen, Notice of Intention to Renovate Asbestos-Containing Structure, #2 SRC Reflux Drum at Building 94, Texas City Plant (1989)

    A completed Texas City Plant form (Plant Procedure SH-5.6, Attachment #1) giving notice of an emergency removal of a vessel, the #2 SRC reflux drum at Building 94, which contained friable asbestos material. The handwritten entries give an estimated…

  6. Company document · Union Carbide documents · April 4, 1989

    Texas City Plant Notice of Intention to Renovate Asbestos-Containing Facility, Prepared by Frank Campbell (1989)

    A Texas City Plant form (Plant Procedure SH-5.6, Attachment #1, last revised 11/09/87) giving notice of intent to renovate a structure containing asbestos material. The handwritten entries describe removal of insulation from the #1 Stripper at the…

  7. Company document · Union Carbide documents · May 19, 1989

    Notice of Intention to Demolish or Renovate Asbestos-Containing Steam Header at Building 19 Drum Room, Texas City Plant (1989)

    A completed Texas City Plant form (Plant Procedure I-B-8, Attachment #1) giving notice of a planned renovation of a 2-inch utility steam header to the Building 19 drum room barrel wash basin. The handwritten entries list about 12 sq ft and 9 linear…

  8. Company document · Union Carbide documents · October 16, 1989

    Notice of Intention to Demolish or Renovate a Structure Containing Asbestos Material, Steam Heat Tracing Line, Building 219, Texas City Plant, prepared by Jon Roush (1989)

    Handwritten-entry plant form (Plant Procedure attachment) giving notice of a planned renovation involving friable asbestos material at the Texas City Plant. It describes a 70# steam heat tracing line for surfactants tanks and lines, about 15 linear…

  9. Company document · Union Carbide documents · February 23, 1989

    Texas City Plant Notice of Intention to Renovate a Facility Containing Asbestos Material, Building 219 Steam Tracing Repair (1989)

    A one-page Texas City Plant form (Plant Procedure 1-8-6, Attachment #1) giving notice of intention to renovate a facility containing asbestos material. The handwritten entries describe a repair of about 5 linear feet of friable asbestos on 3/8-inch…

  10. Company document · Union Carbide documents · April 13, 1989

    S. M. Van Riper, Notice of Intention to Renovate Asbestos Insulation in Ethanol Unit, Texas City Plant (1989)

    Completed Texas City Plant form (Plant Procedure SH-5.6, Attachment #1, page 3 of 3) giving notice of intent to renovate a facility containing asbestos material. The handwritten entries describe removal and disposal of 45 linear feet of asbestos…

  11. Company document · Union Carbide documents · November 27, 1985

    Texas City Plant Notice of Intention to Renovate Asbestos Piping Insulation in the Main Piperacks, Completed by Wilkins and S. F. Bell (1985)

    A Union Carbide Texas City Plant form (Plant Procedure I-8-8, Attachment #1), filled in by hand, giving notice of intent to renovate a facility containing asbestos material. The entries describe piping insulation in the…

  12. Company document · Union Carbide documents · August 14, 1989

    D. R. Schoen, Notice of Intention to Renovate Asbestos-Containing Reflux Drum at Texas City Plant, Building 94 (1989)

    A handwritten-in form (Plant Procedure SH-5.6, Attachment #1) giving notice of an emergency removal of friable asbestos material from the #2 SRC reflux drum at Building 94 at the Texas City Plant. The form records an estimated area, an estimated age…

  13. Company document · Union Carbide documents · September 6, 1989

    Texas City Plant Notice of Intention to Demolish or Renovate a Structure Containing Asbestos Material, Building B-17 Pipe Removal (1989)

    Page 3 of 3 of Texas City Plant Procedure SH-5.6 (Attachment #1), a form notice of intention to demolish or renovate a facility containing asbestos material, filled out by hand. It describes removal of about 24 feet of 3-inch pipe on the north side…

  14. Company document · Union Carbide documents · September 15, 1989

    Texas City Plant Notice of Intention to Demolish or Renovate Asbestos-Containing 2nd Effect Reflux Drum, Prepared by J. B. Richard (1989)

    Completed Texas City Plant form (Plant Procedure SH-5.6, Attachment #1, last revised 11/09/87) giving notice of intent to renovate a facility containing asbestos. It describes a 2nd effect reflux drum in Bldg. 94 with an estimated 236 sq. ft. of…

  15. Company document · Union Carbide documents · November 13, 1989

    Texas City Plant Notice of Intention to Renovate Steam Drums Containing Asbestos Material (1989)

    A Union Carbide Texas City Plant form giving notice of intent to demolish or renovate a facility containing asbestos material. The handwritten entries describe #1, #2, #3 and #7 steam drums in the furnace area at…

  16. Company document · Union Carbide documents · March 22, 1989

    J. B. Richard's Notice of Intention to Renovate Asbestos-Containing Lights Column, Building 94, Texas City Plant (1989)

    Handwritten-in form (Attachment #1 to Plant Procedure SH-5.6, last revised 11/09/87) giving notice of intent to remove and dispose of friable asbestos material from a lights column and piping in Building 94 at the Texas City Plant. It lists the…

  17. Company document · Union Carbide documents · May 15, 1989

    Notice of Intention to Demolish or Renovate a Structure Containing Asbestos Material, Texas City Plant, Tubing Removal (1989)

    A completed Texas City Plant form (Plant Procedure SH-5.6, Attachment #1, last revised 11/09/87) giving notice of intent to remove about 15 linear feet of old tubing covered with asbestos tape. The handwritten entries give a start and completion…