4 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · 1986
West Virginia Air Pollution Control Commission Asbestos Notice Letter to R. H. Smith, with Union Carbide Technical Center Asbestos Sampling and Monitoring Memos (1986)
…Commission) to R. H. Smith, Union Carbide, on notice requirements for asbestos demolition and renovation under 40 CFR Part 61 Subpart M Blank WVAPCC Asbestos Removal Notification form (APCC-ARN-3/86) Memo, June 23, 1986…
-
Company document · Union Carbide documents · June 19, 1986
V. E. Stover and M. A. Patel to F. R. Sunderland on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1986)
Internal memo transmitting results of personal air monitoring for asbestos on insulators at the Institute Plant, Building 20, on June 4, 1986, during removal of 60 linear feet of asbestos from a 6 inch line and replacement with Kaylo. Two of four…
-
Company document · Union Carbide documents · April 29, 1987
V. E. Stover and H. J. Kimble to H. E. Rucker on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1987)
Internal memo reporting personal air sampling results for two insulators who loaded bagged asbestos for disposal and patched a line at Building 2009 at the Institute Plant. The memo states both samples were below the 0.1 f/cc OSHA action level,…
-
Company document · Union Carbide documents · June 19, 1986
V. E. Stover and M. A. Patel to F. R. Sunderland on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1986)
Internal Union Carbide memo transmitting results of asbestos exposure monitoring of insulators at the Institute Plant, Building 20, on June 4, 1986, while they removed 60 linear feet of asbestos from a 6 inch line and…