9 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · September 12, 1980
G. F. Hurley to B. E. Bess and Others on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)
Letter reporting asbestos air monitoring in the SEVIN operations area on September 3, 1980, which showed 0.1 fiber per cc. Six breathing-zone samples were taken on three men, but an analytical error left only one valid sample, for Mr. Smith. The…
-
Company document · Union Carbide documents · September 12, 1980
G. F. Hurley to B. E. Bess, P. W. Young and Others on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)
Letter reporting that asbestos monitoring in the SEVIN operations area on September 3, 1980 showed 0.1 fiber per cc, which it described as below the present OSHA standard. Six breathing-zone samples were taken on three men, but because of an…
-
Company document · Union Carbide documents · October 26, 1981
E. L. Adkins to C. F. Morris on Asbestos Monitoring Data for Gasket Fabrication, Building 325, Institute Plant (1981)
Internal memo from E. L. Adkins (Industrial Hygiene) reporting asbestos air monitoring on October 6, 1981 in the gasket fabrication area of Building 325, Institute Plant, where an employee cut Garlok sheets into gaskets. One personal and one area…
-
Company document · Union Carbide documents · July 16, 1982
Manhar A. Patel to J. C. Smith on Dust and MEK Monitoring in the Sandblast Shed, 511 Construction Institute Plant (1982)
Internal Union Carbide letter reporting dust sampling for 'Black Beauty' in the Sandblast Shed and methyl ethyl ketone (MEK) sampling in the Paint Preparation Shed at the 511 Construction Institute Plant, May-June 1982. It says…
-
Company document · Union Carbide documents · October 20, 1981
M. A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Gasket Shop, Institute Plant (1981)
Internal memo reporting area and personal asbestos exposure monitoring in the Gasket Shop (laundry, Building 3 of the Construction Department) at the Institute Plant, done by the plant's industrial hygiene group on October 2 and 9, 1981. It states…
-
Company document · Union Carbide documents · October 23, 1981
M. A. Patel to W. L. Browning, J. W. Perry Jr. and Others on Asbestos Monitoring in the Gasket Shop, 512 Construction, Institute Plant, with Replacement Letter and Data Sheet (1981)
Internal Union Carbide correspondence from Manhar A. Patel. A cover note says an October 20, 1981 letter on asbestos monitoring in the Institute Plant gasket shop contained an error and should be replaced. The replacement letter…
-
Company document · Union Carbide documents · October 14, 1981
H. H. Frazier to R. E. Peele on Monitoring for Asbestos Exposure Potential in the 511 Construction Gasket Shop (1981)
One-page internal Union Carbide memo from Industrial Hygiene at the Institute Plant, West Virginia. It reports that two personal and two area air samples were collected in the 511 Construction Gasket Shop to measure airborne…
-
Company document · Union Carbide documents · March 15, 1983
H. H. Frazier to R. G. Hull, Jr. on Personal Asbestos Exposure During Acetone Unit Demolition, Complex VI (1983)
Internal Union Carbide memo from Industrial Hygiene at the Institute Plant reporting three airborne asbestos samples taken during insulation demolition at the Acetone Unit. It gives results of 0.2, 0.5 and 0.8 fibers…
-
Company document · Union Carbide documents · March 15, 1983
H. H. Frazier to P. J. Morris on Personal Asbestos Exposure Monitoring of Two Insulator/Painters at Maintenance Complex VIII, Institute Plant (1983)
Internal Union Carbide memo reporting personal air monitoring of two insulator/painters removing protective covering from asbestos-insulated pipe valve at Maintenance Complex VIII on 2/3/83. It reports 15-minute results of 0.8…