17 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents · August 24, 1989

    Handwritten Floor-by-Floor Pipe Joint Notes and Fiber Count Data Sheets, Union Carbide South Charleston Plant (1989)

    …on pipes and joints, including a note about vertical pipe that 'looks like loose Asbestos.' Pages 2-3 are Union Carbide South Charleston Plant fiber-count data sheets dated 08/24/89, with handwritten tallies for…

  2. Company document · Union Carbide documents · April 29, 1986

    D. R. Stokely to Dr. D. L. Liebeskind Transmitting Action Plan for the South Charleston Chemical Mixing Dept. Safety/Health Survey (1986)

    Internal Union Carbide memo from the South Charleston Plant transmitting an action plan that responds to concerns raised in the July 15-19, 1985 operational safety/health survey of the Chemical Mixing Department (514). It lists…

  3. Company document · Union Carbide documents

    South Charleston Plant Draft Provisions for Asbestos Material Removal and Disposal (undated, after June 1986)

    A draft plant procedure for removing and disposing of asbestos insulation and other asbestos-containing material at the South Charleston Plant. It sets out definitions, responsibilities, job sequence, protective clothing, respirators, disposal bags,…

  4. Company document · Union Carbide documents · April 16, 1987

    South Charleston Plant Asbestos Insulation Abatement: 4/16/87 Status and Removal Project Plan (1987)

    Packet on an asbestos insulation abatement program at Union Carbide's South Charleston, West Virginia plant. It has a 4/16/87 status sheet, a project justification and plan, project criteria, a job description for an…

  5. Company document · Union Carbide documents · May 21, 1987

    South Charleston Plant Accident/Incident Report and Review Board Analysis on Vapor Release Under Plastic Enclosure at Tanks 643-644 During Asbestos Insulation Removal (1987)

    Accident/incident report and informal Review Board analysis of a May 21, 1987 near-miss in the Polyols department at South Charleston. Reactor contents transferred to tank 643 vented into a plastic enclosure installed for asbestos insulation…

  6. Company document · Union Carbide documents

    Asbestos Insulation Removal Project Description, South Charleston Plant (undated, after 1987)

    A project description for removing asbestos insulation from equipment, lines and facilities at the South Charleston Plant. It states the objective, justification (occupational health, OSHA two fibers/cc limit), safety guidelines for removal, a…

  7. Company document · Union Carbide documents · April 16, 1980

    Industrial Hygiene Monitoring for Asbestos: Results for Three Workers Stripping and Bagging Unibestos Insulation, South Charleston Plant, to J. R. Hall (1980)

    Three "Industrial Hygiene Monitoring for Asbestos" forms (computer ref. W-1042), all dated 4/16/80, report air sampling of three workers at the South Charleston Plant pipe rack northeast of Building 36. Two workers stripped and bagged about 200 feet…

  8. Company document · Union Carbide documents · February 1987

    Maintenance Safety Manual XVIII, Asbestos Handling Procedure, South Charleston Plant (1987)

    Section XVIII of the South Charleston Plant Maintenance Safety Manual, dated 2/87, setting out the mandatory procedure for handling and removing asbestos insulation at the plant. It covers definitions, responsibilities, respirators, protective…

  9. Company document · Union Carbide documents · March 7, 1986

    W. J. Vincent to C. Priestley, Industrial Hygiene Survey Report on Asbestos Sampling at the South Charleston Plant (1986)

    A one-page Industrial Hygiene Survey Report form for the South Charleston Plant, with a survey date of February 13, 1986 and asbestos as the contaminant. It lists two area samples, near the N.W. exit and near the N.E. exit, each taken over 405…

  10. Company document · Union Carbide documents · October 24, 1985

    W. C. Young to C. R. Gillispie, Industrial Hygiene Survey Report on Asbestos Sampling at the South Charleston Plant (1985)

    A one-page industrial hygiene survey report on asbestos sampling at the South Charleston Plant on 10-22-85 and 10-23-85, in Department/Location 327, Construction. It lists handwritten air-sample results for Maintenance Dept. and Construction Dept.…

  11. Company document · Union Carbide documents · February 12, 1987

    South Charleston Plant Respiratory Protection Program & Equipment Manual, Appendix 4 on Selection of Respirators (1987)

    Cover and excerpted pages of the South Charleston Plant respiratory protection manual, consisting of Appendix 4 (Selection of Respirators), revised 2/12/87. It contains a selection flow chart, a table of approved respirators and their applications,…

  12. Company document · Union Carbide documents · March 1982

    Health and Safety Considerations for Craftspersons Handling Asbestos-Containing Insulation at the South Charleston Plant (1982)

    Seven-page plant safety procedure (Section XVIII) on health and safety for craftspersons who handle asbestos-containing insulation at the South Charleston plant. It describes asbestosis, removal of pre-1972 insulation, OSHA limits, a mandatory…

  13. Company document · Union Carbide documents · May 14, 1985

    South Charleston Plant Asbestos Insulation Upgrading Program (1985)

    A proposal to upgrade asbestos insulation at the South Charleston Plant to comply with OSHA standards, estimated at $4.2MM over three years. It describes three work phases completing in 1985, 1986 and 1987, with cost estimates and allocation of…

  14. Company document · Union Carbide documents · May 30, 1986

    W. J. Vincent to Calvin Thompson, Industrial Hygiene Survey Report on Asbestos at Logan Pump Station, South Charleston Plant (1986)

    One-page industrial hygiene survey report form for the South Charleston Plant, dated May 30, 1986. It records an area/source asbestos survey at the Logan Pump Station on April 11, 1986, with a 135-minute sample and a result of .005 F/cc, marked IC…

  15. Company document · Union Carbide documents · March 4, 1987

    R. G. Link to B. N. Gliatta on the Asbestos Removal Program at the South Charleston Plant (1987)

    Internal Union Carbide correspondence in which R. G. Link told B. N. Gliatta he wanted to move ahead with the asbestos removal program at the South Charleston Plant. He listed five steps: assigning a manager, pushing…

  16. Company document · Union Carbide documents · February 11, 1986

    Insulation Staffing Strategy, South Charleston Plant (Rough Draft) (1986)

    A one-page rough draft staffing plan for insulation work at the South Charleston Plant, covering February to December 1986. It lists short-term and long-term steps for identifying, repairing and removing asbestos insulation, with approximate crew…

  17. Company document · Union Carbide documents · April 25, 1986

    J. R. Dement Draft Short Term Asbestos Insulation Plan and Insulation Strategy for the South Charleston Plant (1986)

    A set of draft plans for repairing or replacing deteriorated asbestos insulation at the South Charleston plant. It contains a 4/25/86 draft short-term plan with a recommendation, strategy and issues, followed by drafts dated 3/24/86 and 3/27/86 of…