  1. Company document · Union Carbide documents · December 1989

    Union Carbide Texas City Plant Asbestos Demolition/Renovation Notices and Texas Air Control Board Forms (1989)

    Union Carbide Texas City Plant internal Notice of Intention to Demolish or Renovate a Structure or Facility Containing Asbestos Material (Attachment 3, Plant Procedure), handwritten, No. 1 Powerhouse Texas Air Control Board Asbestos Demolition/Renovation Notification…

  2. Company document · Union Carbide documents · September 23, 1985

    Union Carbide Texas City Plant Notice of Intention to Demolish Temporary Metal Building #89 Containing Asbestos, Plant Procedure I-B-6 Attachment #1 (1985)

    A form titled as a notice of intention to demolish or renovate a structure or facility containing asbestos material, filled out by hand for Building #89 at the Texas City Plant. The entries describe a temporary metal building next to the fire…

  3. Company document · Union Carbide documents · February 2, 1996

    Union Carbide Texas City Plant Notice of Intention to Demolish or Renovate a Structure Containing Asbestos Material, Building #21 (1996)

    A partly handwritten Union Carbide Texas City Plant form giving notice of planned asbestos removal in Building #21. It lists about 1500 linear feet of material, Thorpe Insulation Services as contractor, abatement dates, and the removal…

  4. Company document · Union Carbide documents · June 12, 1990

    Texas City Plant Notice of Intention to Remove Asbestos Transite Roofing, Prepared by Todd Lowery (1990)

    Page 3 of 3 of Plant Procedure SH-5.6, Attachment #1: a Texas City Plant form giving notice of intention to demolish or renovate a structure containing asbestos material. The handwritten entries describe removal of transite roofing above burner…

  5. Company document · Union Carbide documents · April 9, 1990

    Frank Campbell, Texas City Plant Notices of Intention to Renovate Structures Containing Asbestos Material (1990)

    Two completed copies of Plant Procedure SH-5.6, Attachment #1, a notice of intention to demolish or renovate a structure containing asbestos material. One covers the No. 2 Stripper Still (Bldg. 54, about 1,000 sq. ft., 12 years old), where…

  6. Company document · Union Carbide documents · August 14, 1989

    D. R. Schoen, Notice of Intention to Renovate Asbestos-Containing Structure, #2 SRC Reflux Drum at Building 94, Texas City Plant (1989)

    A completed Texas City Plant form (Plant Procedure SH-5.6, Attachment #1) giving notice of an emergency removal of a vessel, the #2 SRC reflux drum at Building 94, which contained friable asbestos material. The handwritten entries give an estimated…

  7. Company document · Union Carbide documents · July 22, 1980

    A. P. Yalcinkaya to L. A. Smith and D. B. Whittington Posting OSHA Notice of Trial, Docket 80-1943, Texas City Ethanol Unit (1980)

    …July 22, 1980, asking that the Notice of Trial be posted at the Ethanol Unit OSHRC Notice of Trial, Secretary of Labor v. Union Carbide Corporation, Docket 80-1943, signed by Judge Erwin L. Stuller, dated…

  8. Company document · Union Carbide documents · April 4, 1989

    Texas City Plant Notice of Intention to Renovate Asbestos-Containing Facility, Prepared by Frank Campbell (1989)

    A Texas City Plant form (Plant Procedure SH-5.6, Attachment #1, last revised 11/09/87) giving notice of intent to renovate a structure containing asbestos material. The handwritten entries describe removal of insulation from the #1 Stripper at the…

  9. Company document · Union Carbide documents

    Draft Script and Film Shot Notes for a Texas City Plant Presentation on Asbestos Hazards and Stripping Procedures (undated)

    Mostly handwritten script and film-shot notes for a slide or film presentation to Texas City plant personnel on asbestos health hazards and on protective equipment, barricading, wet stripping, bagging and disposal of asbestos insulation. Typed pages…

  10. Company document · Union Carbide documents · May 19, 1989

    Notice of Intention to Demolish or Renovate Asbestos-Containing Steam Header at Building 19 Drum Room, Texas City Plant (1989)

    A completed Texas City Plant form (Plant Procedure I-B-8, Attachment #1) giving notice of a planned renovation of a 2-inch utility steam header to the Building 19 drum room barrel wash basin. The handwritten entries list about 12 sq ft and 9 linear…

  11. Company document · Union Carbide documents · September 10, 1990

    Notice of Intention to Demolish or Renovate Asbestos-Containing Powerhouse Boilers, Texas City Plant, Prepared by Raymond C. Bennett (1990)

    A handwritten-completed Union Carbide Texas City Plant form (Plant Procedure SH-5.6, Attachment #1, page 3 of 3) giving notice of intent to demolish or renovate a facility containing asbestos material. It describes the…

  12. Company document · Union Carbide documents · August 31, 1990

    Texas City Plant Notice of Intention to Renovate Glycol Distillation Facility Containing Asbestos, Prepared by J. D. Roush (1990)

    A completed Union Carbide Texas City Plant form (Plant Procedure SH-5.6, Attachment #1, page 3 of 3, last revised 11/09/87) giving notice of intent to renovate a structure containing asbestos material. The…

  13. Company document · Union Carbide documents

    Texas City Plant Asbestos Standard Compliance Audit against OSHA 29 CFR 1910.1001

    A four-page table auditing the Texas City plant against the OSHA asbestos standard, 29 CFR 1910.1001. For each paragraph of the standard it lists the standard's text, deficiencies observed, and recommendations. Deficiencies noted cover wet methods,…

  14. Company document · Union Carbide documents · March 24, 1980

    L. A. Smith to J. S. Knight on Implementing Medical Restrictions and Recommendations at the Texas City Plant (1980)

    Internal Union Carbide memo transmitting the minutes of the first meeting of a Texas City plant committee set up to evaluate how medical restrictions and recommendations are implemented. The attached agenda, objective, areas of concern and…

  15. Company document · Union Carbide documents · March 6, 1989

    Texas City Plant Notice of Intention to Renovate Asbestos-Containing Steam Trap and Pipe, Prepared by D. R. Schoen (1989)

    A completed Texas City Plant form (Plant Procedure SH-S.5, Attachment #1) giving notice of intention to renovate a facility containing asbestos material. It describes a vaporizer steam trap and associated pipe in Bldg. 16, about 10 linear feet of…

  16. Company document · Union Carbide documents · May 15, 1990

    Texas City Plant Notice of Intention to Renovate Asbestos-Insulated 70 Flash Tank, Prepared by Gary Dickson (1990)

    A completed Texas City Plant form (Plant Procedure SH-5.6, Attachment #1) giving notice of intention to renovate a structure containing asbestos material. It describes a 70 flash tank in the Building 16 fin-fan structure with 141 sq. ft. of friable…

  17. Company document · Union Carbide documents · October 16, 1989

    Notice of Intention to Demolish or Renovate a Structure Containing Asbestos Material, Steam Heat Tracing Line, Building 219, Texas City Plant, prepared by Jon Roush (1989)

    Handwritten-entry plant form (Plant Procedure attachment) giving notice of a planned renovation involving friable asbestos material at the Texas City Plant. It describes a 70# steam heat tracing line for surfactants tanks and lines, about 15 linear…

  18. Company document · Union Carbide documents

    D. R. Hutchinson's Notes of the Informal OSHA Hearing on Citation P4765 at UCC Texas City

    Notes of an informal hearing between Union Carbide's Texas City plant and OSHA officials about OSHA Citation P4765, issued after a failure of a Seal-Fast coupling in a contractor's system. The notes record…

  19. Company document · Union Carbide documents · December 1989

    W. L. Lehmann, Texas City Plant Notices of Intention to Renovate Asbestos-Containing Facilities: No. 3 Deaerator and Powerhouse Steam Lines (1989)

    Two completed copies of the Texas City Plant form 'Notice of Intention to Demolish or Renovate a Structure or Facility Containing Asbestos Material' (Plant Procedure attachment), prepared by W. L. Lehmann. One covers the #3 deaerator and storage…

  20. Company document · Union Carbide documents · February 23, 1989

    Texas City Plant Notice of Intention to Renovate a Facility Containing Asbestos Material, Building 219 Steam Tracing Repair (1989)

    A one-page Texas City Plant form (Plant Procedure 1-8-6, Attachment #1) giving notice of intention to renovate a facility containing asbestos material. The handwritten entries describe a repair of about 5 linear feet of friable asbestos on 3/8-inch…