No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

1,155 results for “Union Carbide Corporation”, page 41 of 58

  1. Company document · Union Carbide documents · September 12, 1980

    G. F. Hurley to B. E. Bess, P. W. Young and Others on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)

    Letter reporting that asbestos monitoring in the SEVIN operations area on September 3, 1980 showed 0.1 fiber per cc, which it described as below the present OSHA standard. Six breathing-zone samples were taken on three men, but because of an…

  2. Company document · Union Carbide documents

    Workplace Environment Monitoring Field Data Sheet and Industrial Hygiene Workplace Sampling Forms for Asbestos Dust Sampling

    Six pages of workplace air-sampling records, apparently handwritten on pre-printed forms. Page 1 is a Workplace Environment Monitoring Field Data Sheet listing air samples, pump settings and run times, with handwritten notes on fiber counts for the…

  3. Company document · Union Carbide documents · September 12, 1980

    G. F. Hurley to B. E. Bess and Others on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)

    Letter-style memo dated September 12, 1980, reporting asbestos air monitoring in the SEVIN operations area on September 3, 1980, which showed 0.1 fiber per cc. It states that six breathing-zone samples were taken on three men, but only one valid…

  4. Company document · Union Carbide documents · May 5, 1978

    J. E. Walsh Customer Call Reports on Intercoastal Paint, Houston (1978), with International Paint Call Report (1975)

    …E. Walsh): prospect's general manager objected to the sample; toxicology issue discussed Call report, International Paint Company, Union, NJ, 8/6/75 (G.L. Dickson): RG-244 going into coal tar-epoxy coatings; dust count…

  5. Company document · Union Carbide documents

    Handwritten Asbestos Abatement Project Meeting Notes and J. R. Dement Note to J. C. Wandell on Maintenance Procedure

    Page 1 is an unsigned handwritten set of notes headed 'Asb Abatement Project Mtg', listing agenda items and five steps for an asbestos insulation project, including pre-approval of funds and allocation factors. Page 2 is a handwritten note from J.…

  6. Company document · Union Carbide documents · October 29, 1975

    J. L. M. Draft Outline of RG-244 Action Plan, with RG-600 and RG-244 Sales Notes, Sent to W. C. Thurber (1975)

    Handwritten notes dated 10/29/75. Page 1 gives RG-600 sales in pounds for 1974 and 1975 and counts of inquiries. Pages 2-3 are a draft outline of an RG-244 action plan covering sales efforts, promotion, new applications and product improvement. The…

  7. Company document · Union Carbide documents · March 19, 1982

    Industrial Hygiene Monitoring for Asbestos, Building 701-100 Insulation Cleanup, Reported to J. E. Midkiff (1982)

    Four pages of Union Carbide industrial hygiene monitoring reports (computer refs. W-1401, W-1402, W-1405) dated March 19, 1982, giving airborne asbestos fiber results for workers Warren Abbot, Paul Crowder and Dave Shamblin during…

  8. Company document · Union Carbide documents · March 31, 1969

    R. E. Joyner to C. U. Dernehl Transmitting Consumer Products Division Memo on Asbestos Fibre Safety Precautions (1969)

    …N. H. Ketcham, 31 March 1969, forwarding attached letters Union Carbide Consumer Products Division (Quality & Specifications, Cleveland) memo of March 18, 1969 to plant managers quoting Johns-Manville letter on asbestos fibre safety precautions, signed P…

  9. Company document · Union Carbide documents · October 24, 1975

    C. W. Carman to R. W. Cope and Others Circulating the Asbestos Safety Procedure for Review (1975)

    A one-page cover memo from C. W. Carman to nine recipients sending an attached Asbestos Safety Procedure for approval and comments by November 5, 1975. The attachment is not included in the exhibit; the second page is blank.

  10. Company document · Union Carbide documents · January 5, 1972

    W. N. Johnson to R. G. Woolery on Following Up by Phone (1972)

    A one-page note from W. N. Johnson to R. G. Woolery dated January 5, 1972. It says that, following a telephone conversation, Johnson would be in touch with the recipient on Friday or Monday. The note lists an enclosure, but none is included in the exhibit.

  11. Company document · Union Carbide documents · January 14, 1974

    W. C. Thurber to F. H. Larrison and Others Confirming RG-244 Packaging Changes (1974)

    Memo from W. C. Thurber confirming discussions of January 11, 1974 on packaging of RG-244. It says cardboard shrouds will be dropped once inventory is used up and that 3-ply bags will give way to slightly larger two-ply bags. It also covers gluing…

  12. Company document · Union Carbide documents

    Handwritten Asbestos Operating Results, Net Income Variance Worksheets and RB-244 Sales Graph, JDT to WCT (undated)

    Handwritten financial worksheets on pre-printed Union Carbide forms for the Asbestos business. They tabulate net sales, gross margin, income before tax, income tax, net income and return on assets in columns headed 76 through 80…

  13. Company document · Union Carbide documents · April 8, 1983

    K. E. Williams Industrial Hygiene Results on Airborne Asbestos Near #3 Boiler, with IHI-Kemron Fiber Count Analyses (1983)

    Union Carbide Industrial Hygiene Results, April 8, 1983: asbestos fiber concentrations at #3 boiler, signed K. E. Williams, with handwritten annotations IHI-Kemron report KM-25-0017-83, March 28, 1983, to K. E. Williams: asbestos…

  14. Company document · Union Carbide documents · August 20, 1980

    Handwritten Asbestos Fiber Count Calculations for Building 706 (R. E. Raines and J. W. Greenlee) (1980)

    One handwritten page headed 'Asbestos Calculations Bldg. 706' and dated 8-20-80. It lists two samples, labeled R.E. Raines - AM and JW Greenlee - AM, with fiber counts per 100 fields and the arithmetic converting them to fibers per cm3 (about .08…

  15. Company document · Union Carbide documents

    Handwritten Asbestos SPU Table of Tons and $M for Concede, Maintain and Improve Cases, 1979 Forecast to 1984

    A single handwritten table headed "Asbestos SPU" with Tons and $M columns for the years 1979 (forecast) through 1984. Rows are grouped under Short Fiber, Visc. Port. and Total, each with Concede, Maintain and Improve cases. Handwritten footnotes…

  16. Company document · Union Carbide documents · March 3, 1972

    Paul W. McDaniel to J. L. Myers on Asbestos Fiber Survey at American Biltrite Plant, Trenton, N.J. (1972)

    Internal Union Carbide letter reporting a March 1, 1972 airborne asbestos fiber survey at the American Biltrite plant in Trenton, N.J., where asbestos was used in plastic tile manufacture. It lists fiber counts at seven…

  17. Company document · Union Carbide documents · February 22, 1971

    R. E. Byrne Call Report on Chevron Asphalt, Emeryville, California, Regarding Calidria Asbestos in Asphalt Products (1971)

    A one-page Union Carbide call report dated 2/22/71 on an interview with W. J. Kari, Technical Coordinator West at Chevron Asphalt, Emeryville, California. The stated objective was to determine the potential for Calidria…

  18. Company document · Union Carbide documents

    Photographs of a Calidria Asbestos Resin Grade Bag

    Two photographs, rotated sideways on the page, of a bag marked Calidria ASBESTOS with a 'Resin Grade' designation. The bag appears to sit on a pallet or among other bags. A handwritten number appears on each page.

  19. Company document · Union Carbide documents · August 10, 1972

    Calidria Asbestos Mill Flowsheets, with Handwritten Annotations on Refining, Filtration and Drying Capacity (1972)

    Six pages of hand-drawn process flowsheets for the asbestos mill: ore supply and rock fiber circuit, refining and filtration, final product handling, and the RG-244 circuit. The flowsheets are marked 'ROM 2-12-70, Revised 8/10/72'. Pages 1 and 2 are…

  20. Company document · Union Carbide documents · January 25, 1979

    Dean F. Braun Report of Call on Dresser Industries Meeting re Silane-Asbestos Pricing and Toxicity Study (1979)

    Report of a call or meeting on 25 January 1979 with Dresser Industries personnel in Houston, written by Dean F. Braun and typed 13 February 1979. It reports Dresser's intent to proceed with silane-asbestos, a quoted price range of $1.25 to $1.50 per…