- Person: G. F. Hurley
- Organization: Union Carbide Corporation (industrial hygiene monitoring)
- Clear filters
5 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · July 3, 1980
Industrial Hygiene Monitoring for Asbestos: Cooling Tower Insulation Stripping, Building 789, to R. F. Painter (1980)
Three industrial hygiene monitoring forms for asbestos, each dated 7/3/80, reporting air samples taken in the basement of Bldg. 789 (cooling tower) while insulation was stripped and bagged. A.M. sample results were .3 (C. Miller), .7 (D. C.…
-
Company document · Union Carbide documents · July 3, 1980
Industrial Hygiene Monitoring for Asbestos: Cooling Tower Insulation Stripping, Building 789, to R. F. Painter (1980)
Three industrial hygiene monitoring forms dated 7/3/80 report airborne fiber results for workers stripping and bagging insulation in the basement of Building 789 (cooling tower). The A.M. samples were .7, .3 and .3 fibers >5 µm/cm3; the P.M. samples…
-
Company document · Union Carbide documents · April 1, 1980
Industrial Hygiene Monitoring for Asbestos: Air Samples for R. E. Raines and J. W. Greenlee Stripping Insulation, Bldg. 773, Report to W. T. Shelton (1980)
Two Industrial Hygiene Monitoring for Asbestos forms dated 4/1/80, each recording personal air samples taken in Bldg. 773 while a worker stripped and bagged insulation from a 3-inch condensate line. Page 1 covers R. E. Raines and page 2 covers J. W.…
-
Company document · Union Carbide documents · August 19, 1980
Industrial Hygiene Monitoring for Asbestos, Reports to W. T. Shelton on Insulation Stripping at Bldg. 706 (1980)
Two industrial hygiene monitoring forms dated 8/19/80, each reporting one personal air sample for asbestos taken at Bldg. 706, West End, second and third level, during stripping and bagging of insulation on the G-101 autoclave and adjacent lines.…
-
Company document · Union Carbide documents · October 20, 1980
Industrial Hygiene Monitoring for Asbestos: Results for J. E. Hackney and R. P. Hess Stripping Dowtherm System Insulation, sent to W. T. Shelton (1980)
Two industrial hygiene monitoring forms for asbestos dated 10/20/80, addressed to W. T. Shelton of the 704 Shop. Each reports a one-sample fiber result for a worker (J. E. Hackney, 3.04 fibers over 57 minutes; R. P. Hess, 1.3 fibers over 60 minutes)…