No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

40 results for “Union Carbide Corporation”, page 1 of 2

  1. Company document · Union Carbide documents · June 22, 1989

    Union Carbide Texas City Plant Asbestos Renovation Notices for Roof Removal on Building 47 (1989)

    Texas Air Control Board Asbestos Demolition/Renovation Notification Form for Union Carbide, Texas City, signed by Andrew F. Jackson, June 22, 1989 (UCTC 18162) Handwritten Union Carbide Texas City Plant 'Notice of Intention to Demolish or…

  2. Company document · Union Carbide documents · 1989

    Handwritten Note to 'Drew' on Asbestos Notification Filing, with Texas Air Control Board Asbestos Renovation Notification Forms for Union Carbide's Texas City Plant (1989)

    …file can serve as the central asbestos notification file. It is followed by two Texas Air Control Board asbestos demolition/renovation notification forms for Union Carbide's Texas City plant, signed by Industrial Hygienist Andrew F…

  3. Company document · Union Carbide documents · December 26, 1996

    Texas Department of Health Demolition/Renovation Notification Forms for Union Carbide Texas City Plant Buildings 122 and 94, with Internal Notices (1996-1997)

    …Demolition/Renovation Notification Form for Building 122 (transite panel removal), signed 12/26/96 Union Carbide Texas City Plant internal Notice of Intention to Demolish or Renovate, largely handwritten (Building 122) Page with no OCR text…

  4. Company document · Union Carbide documents · 1997

    Texas Department of Health Asbestos Demolition/Renovation Notifications and Plant Procedure Form for Union Carbide Texas City Plant (1997-1998)

    …F. Jackson 8/13/97; 350 linear ft (UCTC 18328-18329) Union Carbide Texas City Plant Safety and Health Procedure SH-55 'Notice of Intention to Demolish or Renovate' form, mostly handwritten, for the same Bldg…

  5. Company document · Union Carbide documents · August 14, 1989

    Union Carbide Texas City Plant Notification to Texas Air Control Board of Emergency Asbestos Removal from #2 SRC Reflux Drum (1989)

    …signed by Andrew F. Jackson, Aug. 14, 1989 Union Carbide Texas City Plant notice of intention to demolish or renovate a structure containing asbestos (Plant Procedure SH-5.6, Attachment #1), prepared by D. R. Schoen…

  6. Company document · Union Carbide documents · December 1989

    Union Carbide Texas City Plant Asbestos Demolition/Renovation Notices and Texas Air Control Board Forms (1989)

    Union Carbide Texas City Plant internal Notice of Intention to Demolish or Renovate a Structure or Facility Containing Asbestos Material (Attachment 3, Plant Procedure), handwritten, No. 1 Powerhouse Texas Air Control Board Asbestos Demolition/Renovation Notification…

  7. Company document · Union Carbide documents · January 26, 1987

    Kirk E. Martin to A. L. Welch on Asbestos Exposure Monitoring at Texas City, with Attached OSHA Appendix A and Related Correspondence (1987)

    …1987 memo in which Kirk E. Martin responded to a contractor's complaint that Union Carbide's Texas City laboratory air-sample results for asbestos were inaccurate, stating the results stood and citing the OSHA counting…

  8. Company document · Union Carbide documents · January 31, 1986

    A. P. Yalcinkaya to Texas Air Control Board on Notification of Asbestos Insulation Removal at Texas City Plant (1986)

    Exhibit consisting of a handwritten fax cover sheet, a January 31, 1986 letter notifying the Texas Air Control Board of planned removal of asbestos insulation from four amine solution heat exchangers at the Texas City plant, and a blank…

  9. Company document · Union Carbide documents · June 24, 1987

    Kirk E. Martin to M. Hightower and K. Klyng on Pre-Demolition Walk-Through of Bldg 187 and #32 Boiler Turbine, Texas City (1987)

    Letter from Kirk E. Martin reporting industrial hygiene concerns from a questionnaire and walk-through inspection before demolition of Bldg 187 and the #32 Boiler Turbine at Texas City. It reported no concerns for Bldg 187, a significant amount of…

  10. Company document · Union Carbide documents · November 19, 1984

    Kirk E. Martin to J. F. Erdmann on Industrial Hygiene Test of Powerhouse Pipe Insulation for Asbestos, Texas City Plant (1984)

    Internal Union Carbide industrial hygiene preliminary report dated November 19, 1984, on a pipe insulation sample removed from the #2 Powerhouse at Texas City on November 12, 1984. The sample was analyzed for percent water by…

  11. Company document · Union Carbide documents · June 24, 1987

    Kirk E. Martin to R. M. Arnold and M. Hightower on Pre-Demolition Walk-thru of the Phenolic Resins Unit, Texas City (1987)

    Memo reporting industrial hygiene concerns identified from a questionnaire and walk-through inspection before demolition of the Phenolic Resins Unit at Texas City. It notes asbestos insulation on lines and vessels, states the company policy on…

  12. Company document · Union Carbide documents · March 11, 1988

    T. E. Hanning to Distribution on Need for Personal Protection When Cutting or Removing Asbestos-Containing Gaskets or Packing, with Attachments (1988)

    A March 1988 "Business Confidential" memo from T. E. Hanning for the Asbestos Phaseout Task Group asked plant locations about monitoring data, written procedures, wetting and glove-bag use, and the need for personal protection when cutting or…

  13. Company document · Union Carbide documents · August 5, 1987

    J. L. Pedraza to G. L. Rivera on Demolition Walk-Through Summary for Buildings B-21 and B-24, Texas City (1987)

    Internal Union Carbide memo from the Texas City plant summarizing eight concerns raised during a walk-through of the B-21 area and B-24 columns before demolition, each followed by a response. Items covered PCBs…

  14. Company document · Union Carbide documents · August 16, 1978

    A. P. Yalcinkaya to L. P. Berti on Demolition of Buildings #20 and #21 at Texas City, with Attached Asbestos Standard, Monitoring Report and NIOSH Nickel Criteria Document (1978)

    Internal Union Carbide memo from A. P. Yalcinkaya to Dr. L. P. Berti recommending that demolition contractors at Texas City Buildings #20 and #21 be warned of hazards and told of the OSHA asbestos standard requirements…

  15. Company document · Union Carbide documents · July 11, 1984

    Kirk E. Martin to J. B. Leverton on Asbestos Demolition Inspection by Galveston County Health District and OSHA at Texas City (1984)

    …present, of the Kimmins Corp. asbestos demolition job at Building 75 of the Texas City plant. It lists the inspector's three observations and says notices of violation would be sent to Union Carbide and Kimmins.

  16. Company document · Union Carbide documents · July 10, 1984

    Kirk E. Martin to H. K. Decker on Asbestos Exposure Finding at the No. 3 Powerhouse Safety/Health Survey (1984)

    Memo from Kirk E. Martin to H. K. Decker about an Operational Safety/Health Survey at the #3 Powerhouse, which reported employee exposure to asbestos in item HL.2. Martin said the finding, the survey team's recommendations and the unit's response…

  17. Company document · Union Carbide documents · February 15, 1985

    Kirk E. Martin to S. J. Footer, J. B. Leverton, L. D. Pell and A. P. Yalcinkaya on the NESHAPS Asbestos Site Visit at the Texas City Plant (1985)

    Internal memo reporting a February 13, 1985 visit by Jackie Ickes of the Galveston County Health Department to inspect compliance with the NESHAPS Asbestos Standard at Kimmins Corp. demolition work sites at the Texas City Plant. It describes minor…

  18. Company document · Union Carbide documents · August 17, 1987

    A. P. Yalcinkaya to Eli Bell, Texas Air Control Board, on Asbestos Insulation Removal Notification at Texas City (1987)

    Letter of August 17, 1987 from A. P. Yalcinkaya to the Texas Air Control Board giving notice under 40 CFR 61.146 of planned removal of insulation from 1200 linear feet of pipe near Bldg. 16 at the Texas City plant. Removal was scheduled for…

  19. Company document · Union Carbide documents · May 19, 1982

    J. H. Holstein to J. E. Neff on Product List of Produced Products with TLVs and NIOSH/UCC Sampling Methods, Texas City Plant (1982)

    …to J. E. Neff transmitting alphabetical and by-division lists of products sold by Union Carbide's Texas City plant, with Threshold Limit Values and UCC and NIOSH sampling and analytical method numbers and classifications. The…

  20. Company document · Union Carbide documents · July 12, 1984

    Kirk E. Martin to J. B. Leverton on OSHA Inspection of Kimmins Asbestos Removal at Texas City (1984)

    Memo reporting an OSHA inspector's July 11 visit to the Texas City plant to inspect Kimmins Corporation employees removing asbestos insulation at Bldg 75. It states that no personnel exposure monitoring was done that day…