42 results for “Union Carbide Corporation”, page 1 of 3
-
Company document · Union Carbide documents · January 9, 1987
J. B. Leverton to Eli Bell, Texas Air Control Board, on Asbestos Insulation Removal at Texas City Marine Terminal (1987)
Letter notifying the Texas Air Control Board, under 40 CFR 61.146, of planned renovation to remove insulation from steam service headers at the Texas City marine terminal. It gives the amount (about 584 feet), the scheduled dates (January 22 to…
-
Company document · Union Carbide documents · January 26, 1987
Kirk E. Martin to A. L. Welch on Asbestos Exposure Monitoring at Texas City, with Attached OSHA Appendix A and Related Correspondence (1987)
…1987 memo in which Kirk E. Martin responded to a contractor's complaint that Union Carbide's Texas City laboratory air-sample results for asbestos were inaccurate, stating the results stood and citing the OSHA counting…
-
Company document · Union Carbide documents · September 7, 1988
A. Perihan Yalcinkaya to Eli Bell, Texas Air Control Board, Renovation Notification for Asbestos Insulation Removal at Texas City (1988)
…the Texas Air Control Board, under 40 CFR 61.146, that Union Carbide planned to remove about 1500 linear feet of insulation from lines in Building 133 at Texas City, Texas. It states the work was…
-
Company document · Union Carbide documents · January 12, 1987
J. B. Leverton to Eli Bell, Texas Air Control Board, Renovation Notification for Asbestos Insulation Removal at Texas City (1987)
…Board, under 40 CFR 61.146, that Union Carbide planned to remove asbestos insulation from the 1st and 2nd effect columns at building 94 of its Texas City plant. It gave about 238 square feet, a…
-
Company document · Union Carbide documents · January 31, 1986
A. P. Yalcinkaya to Texas Air Control Board on Notification of Asbestos Insulation Removal at Texas City Plant (1986)
Exhibit consisting of a handwritten fax cover sheet, a January 31, 1986 letter notifying the Texas Air Control Board of planned removal of asbestos insulation from four amine solution heat exchangers at the Texas City plant, and a blank…
-
Company document · Union Carbide documents · February 26, 1987
J. B. Leverton to Eli Bell, Texas Air Control Board, Notifying of Asbestos Steam Line Insulation Removal at Texas City Plant (1987)
…under 40 CFR 61.146, that Union Carbide planned to remove asbestos insulation from 520 linear feet of 3-inch steam line north of building 56 at the Texas City plant, from March 23 to June…
-
Company document · Union Carbide documents · June 24, 1987
Kirk E. Martin to M. Hightower and K. Klyng on Pre-Demolition Walk-Through of Bldg 187 and #32 Boiler Turbine, Texas City (1987)
Letter from Kirk E. Martin reporting industrial hygiene concerns from a questionnaire and walk-through inspection before demolition of Bldg 187 and the #32 Boiler Turbine at Texas City. It reported no concerns for Bldg 187, a significant amount of…
-
Company document · Union Carbide documents · November 19, 1984
Kirk E. Martin to J. F. Erdmann on Industrial Hygiene Test of Powerhouse Pipe Insulation for Asbestos, Texas City Plant (1984)
Internal Union Carbide industrial hygiene preliminary report dated November 19, 1984, on a pipe insulation sample removed from the #2 Powerhouse at Texas City on November 12, 1984. The sample was analyzed for percent water by…
-
Company document · Union Carbide documents · June 24, 1987
Kirk E. Martin to R. M. Arnold and M. Hightower on Pre-Demolition Walk-thru of the Phenolic Resins Unit, Texas City (1987)
Memo reporting industrial hygiene concerns identified from a questionnaire and walk-through inspection before demolition of the Phenolic Resins Unit at Texas City. It notes asbestos insulation on lines and vessels, states the company policy on…
-
Company document · Union Carbide documents · March 11, 1988
T. E. Hanning to Distribution on Need for Personal Protection When Cutting or Removing Asbestos-Containing Gaskets or Packing, with Attachments (1988)
A March 1988 "Business Confidential" memo from T. E. Hanning for the Asbestos Phaseout Task Group asked plant locations about monitoring data, written procedures, wetting and glove-bag use, and the need for personal protection when cutting or…
-
Company document · Union Carbide documents · August 5, 1987
J. L. Pedraza to G. L. Rivera on Demolition Walk-Through Summary for Buildings B-21 and B-24, Texas City (1987)
Internal Union Carbide memo from the Texas City plant summarizing eight concerns raised during a walk-through of the B-21 area and B-24 columns before demolition, each followed by a response. Items covered PCBs…
-
Company document · Union Carbide documents · May 28, 1987
G. L. Rivera to Eli Bell, Texas Air Control Board, Notifying of Asbestos Insulation Removal at Texas City Building 17 (1987)
Letter from G. L. Rivera of Union Carbide's Texas City facility to the Texas Air Control Board giving notice, under 40 CFR 61.146, of planned removal of asbestos insulation from 450 square feet of…
-
Company document · Union Carbide documents · August 17, 1987
A. Perihan Yalcinkaya to Eli Bell, Texas Air Control Board, on Asbestos Pipe Insulation Removal at Texas City (1987)
…notifying the Texas Air Control Board, under 40 CFR 61.146, that Union Carbide planned to remove insulation from 1200 linear feet of pipe near Bldg. 16 at Texas City. It gave a September 8 to…
-
Company document · Union Carbide documents · March 31, 1987
G. L. Rivera to Eli Bell, Texas Air Control Board, on Asbestos Insulation Removal Notification at Texas City No. 3 Olefins Unit (1987)
…Board, under 40 CFR 61.146, that Union Carbide planned to remove asbestos insulation from 105 linear feet of pipe and 660 square feet of equipment in the No. 3 Olefins Unit at Texas City. Removal…
-
Company document · Union Carbide documents · August 16, 1978
A. P. Yalcinkaya to L. P. Berti on Demolition of Buildings #20 and #21 at Texas City, with Attached Asbestos Standard, Monitoring Report and NIOSH Nickel Criteria Document (1978)
Internal Union Carbide memo from A. P. Yalcinkaya to Dr. L. P. Berti recommending that demolition contractors at Texas City Buildings #20 and #21 be warned of hazards and told of the OSHA asbestos standard requirements…
-
Company document · Union Carbide documents · July 11, 1984
Kirk E. Martin to J. B. Leverton on Asbestos Demolition Inspection by Galveston County Health District and OSHA at Texas City (1984)
…present, of the Kimmins Corp. asbestos demolition job at Building 75 of the Texas City plant. It lists the inspector's three observations and says notices of violation would be sent to Union Carbide and Kimmins.
-
Company document · Union Carbide documents · February 24, 1987
J. B. Leverton to Eli Bell, Texas Air Control Board, Giving Notice of Asbestos Insulation Removal at Texas City Olefins Unit (1987)
Letter to the Texas Air Control Board giving notice, under 40 CFR 61.146, that Union Carbide planned to remove asbestos insulation from 400 linear feet of equipment at building #238, No. 3 Olefins, Texas City…
-
Company document · Union Carbide documents · July 10, 1984
Kirk E. Martin to H. K. Decker on Asbestos Exposure Finding at the No. 3 Powerhouse Safety/Health Survey (1984)
Memo from Kirk E. Martin to H. K. Decker about an Operational Safety/Health Survey at the #3 Powerhouse, which reported employee exposure to asbestos in item HL.2. Martin said the finding, the survey team's recommendations and the unit's response…
-
Company document · Union Carbide documents · February 15, 1985
Kirk E. Martin to S. J. Footer, J. B. Leverton, L. D. Pell and A. P. Yalcinkaya on the NESHAPS Asbestos Site Visit at the Texas City Plant (1985)
Internal memo reporting a February 13, 1985 visit by Jackie Ickes of the Galveston County Health Department to inspect compliance with the NESHAPS Asbestos Standard at Kimmins Corp. demolition work sites at the Texas City Plant. It describes minor…
-
Company document · Union Carbide documents · August 17, 1987
A. P. Yalcinkaya to Eli Bell, Texas Air Control Board, on Asbestos Insulation Removal Notification at Texas City (1987)
Letter of August 17, 1987 from A. P. Yalcinkaya to the Texas Air Control Board giving notice under 40 CFR 61.146 of planned removal of insulation from 1200 linear feet of pipe near Bldg. 16 at the Texas City plant. Removal was scheduled for…