No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

47 results for “Union Carbide Corporation”, page 1 of 3

  1. Company document · Union Carbide documents · 1987

    Union Carbide Asbestos Removal and Phase-Out Papers, Including T. E. Hanning Memo on Contractor Project Development Group (1987)

    …Chemicals and Plastics Business Group, use of asbestos-containing materials in the work place Grafoil seminar outline and cover sheet (Union Carbide Specialty Products Group, Cleveland) Grafoil flexible graphite newsletter on special gasketing techniques Distribution list…

  2. Company document · Union Carbide documents · May 1987

    Union Carbide Memos and Draft C&P Program on Phasing Out Asbestos-Containing Materials in Company Workplaces (1986-1987)

    Six pages of Union Carbide papers from 1986-1987 on asbestos in the company's own facilities. They include a 9/29/86 draft Chemicals and Plastics (C&P) program to phase out asbestos-containing materials…

  3. Company document · Union Carbide documents · March 25, 1987

    J. K. Corrie to Maintenance Staff Transmitting Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)

    A March 25, 1987 cover memo from J. K. Corrie circulating a final review draft of Maintenance Safety Procedure XVIII, Asbestos Handling, for the South Charleston plant, with comments requested by April 3, 1987. The attached 20-page draft (dated…

  4. Company document · Union Carbide documents · June 11, 1987

    M. J. Shoger to J. K. Corrie and Others on Asbestos Enclosures and HWP Requirements Meeting (1987)

    Internal Union Carbide memo announcing a June 19 meeting, sponsored by Chuck Rotthoff, with Institute, South Charleston and Sistersville personnel on plant practices for enclosures used in asbestos removal. It states there were two close calls…

  5. Company document · Union Carbide documents · January 26, 1987

    Kirk E. Martin to A. L. Welch on Asbestos Exposure Monitoring at Texas City, with Attached OSHA Appendix A and Related Correspondence (1987)

    …1987 memo in which Kirk E. Martin responded to a contractor's complaint that Union Carbide's Texas City laboratory air-sample results for asbestos were inaccurate, stating the results stood and citing the OSHA counting…

  6. Company document · Union Carbide documents · September 25, 1986

    W. J. Vincent to J. K. Corrie and Others on the New Asbestos Construction Standard (1986)

    A September 1986 memo from W. J. Vincent transmitting a summary of the new OSHA Asbestos Construction Industry Standard. The attached summary covers the 0.2 f/cc permissible exposure limit, the 0.1 f/cc action level, monitoring, respirators,…

  7. Company document · Union Carbide documents · February 11, 1987

    W. J. Vincent to J. K. Corrie Transmitting Responses to Asbestos Abatement and Removal Questions, South Charleston Plant (1987)

    Internal Union Carbide memo from W. J. Vincent to J. K. Corrie forwarding answers to questions raised at a recent meeting on asbestos abatement and removal. The attached "Asbestos Management" Q&A covers negative pressure enclosures…

  8. Company document · Union Carbide documents · January 31, 1986

    A. P. Yalcinkaya to Texas Air Control Board on Notification of Asbestos Insulation Removal at Texas City Plant (1986)

    Exhibit consisting of a handwritten fax cover sheet, a January 31, 1986 letter notifying the Texas Air Control Board of planned removal of asbestos insulation from four amine solution heat exchangers at the Texas City plant, and a blank…

  9. Company document · Union Carbide documents · June 24, 1987

    Kirk E. Martin to M. Hightower and K. Klyng on Pre-Demolition Walk-Through of Bldg 187 and #32 Boiler Turbine, Texas City (1987)

    Letter from Kirk E. Martin reporting industrial hygiene concerns from a questionnaire and walk-through inspection before demolition of Bldg 187 and the #32 Boiler Turbine at Texas City. It reported no concerns for Bldg 187, a significant amount of…

  10. Company document · Union Carbide documents · November 19, 1984

    Kirk E. Martin to J. F. Erdmann on Industrial Hygiene Test of Powerhouse Pipe Insulation for Asbestos, Texas City Plant (1984)

    Internal Union Carbide industrial hygiene preliminary report dated November 19, 1984, on a pipe insulation sample removed from the #2 Powerhouse at Texas City on November 12, 1984. The sample was analyzed for percent water by…

  11. Company document · Union Carbide documents · June 24, 1987

    Kirk E. Martin to R. M. Arnold and M. Hightower on Pre-Demolition Walk-thru of the Phenolic Resins Unit, Texas City (1987)

    Memo reporting industrial hygiene concerns identified from a questionnaire and walk-through inspection before demolition of the Phenolic Resins Unit at Texas City. It notes asbestos insulation on lines and vessels, states the company policy on…

  12. Company document · Union Carbide documents · March 11, 1988

    T. E. Hanning to Distribution on Need for Personal Protection When Cutting or Removing Asbestos-Containing Gaskets or Packing, with Attachments (1988)

    A March 1988 "Business Confidential" memo from T. E. Hanning for the Asbestos Phaseout Task Group asked plant locations about monitoring data, written procedures, wetting and glove-bag use, and the need for personal protection when cutting or…

  13. Company document · Union Carbide documents · November 12, 1987

    W. J. Vincent to W. R. White Jr. on Asbestos Air Sampling of Building 82 Floors (1987)

    Two industrial hygiene summary forms dated 11/12/87 report asbestos air sampling on 10/02/87 at five floors of building 327000 Bldg 82. Each of the five 250-minute area samples is listed as in compliance, with concentrations from 0.0005 to 0.004…

  14. Company document · Union Carbide documents · August 5, 1987

    J. L. Pedraza to G. L. Rivera on Demolition Walk-Through Summary for Buildings B-21 and B-24, Texas City (1987)

    Internal Union Carbide memo from the Texas City plant summarizing eight concerns raised during a walk-through of the B-21 area and B-24 columns before demolition, each followed by a response. Items covered PCBs…

  15. Company document · Union Carbide documents · February 24, 1987

    W. J. Vincent to All Department Heads on Labelling of Asbestos Materials, with Standard Practice SH-256 on Removal and Handling of Asbestos-Containing Insulation (1987)

    A February 1987 internal memo from the South Charleston Plant Safety and Health Department told department heads that asbestos warning labels were now required on installed asbestos products whenever feasible and gave the supplier and cost. Attached…

  16. Company document · Union Carbide documents · July 8, 1987

    W. J. Vincent Industrial Hygiene Summary of Asbestos Air Sampling in Pipe Chases, Building 82, for W. K. White (1987)

    Five-page set of industrial hygiene records for an asbestos air-sampling survey on 06/22/87 in the pipe chases of Building 82 (plant location 327000). It has a handwritten field data sheet, two summary forms dated 07/08/87 from W. J. Vincent, and…

  17. Company document · Union Carbide documents · August 16, 1978

    A. P. Yalcinkaya to L. P. Berti on Demolition of Buildings #20 and #21 at Texas City, with Attached Asbestos Standard, Monitoring Report and NIOSH Nickel Criteria Document (1978)

    Internal Union Carbide memo from A. P. Yalcinkaya to Dr. L. P. Berti recommending that demolition contractors at Texas City Buildings #20 and #21 be warned of hazards and told of the OSHA asbestos standard requirements…

  18. Company document · Union Carbide documents · February 11, 1987

    W. J. Vincent to J. K. Corrie Transmitting Responses to Asbestos Abatement Questions, South Charleston Plant (1987)

    Internal Union Carbide memo from W. J. Vincent to J. K. Corrie, stamped received by the Maintenance Department on Feb. 17, 1987, forwarding answers to questions on asbestos raised at a recent meeting on asbestos abatement…

  19. Company document · Union Carbide documents · March 7, 1986

    W. J. Vincent to C. Priestley, Industrial Hygiene Survey Report on Asbestos Sampling at the South Charleston Plant (1986)

    A one-page Industrial Hygiene Survey Report form for the South Charleston Plant, with a survey date of February 13, 1986 and asbestos as the contaminant. It lists two area samples, near the N.W. exit and near the N.E. exit, each taken over 405…

  20. Company document · Union Carbide documents · July 11, 1984

    Kirk E. Martin to J. B. Leverton on Asbestos Demolition Inspection by Galveston County Health District and OSHA at Texas City (1984)

    …present, of the Kimmins Corp. asbestos demolition job at Building 75 of the Texas City plant. It lists the inspector's three observations and says notices of violation would be sent to Union Carbide and Kimmins.