No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

61 results for “Union Carbide Corporation”, page 1 of 4

  1. Company document · Union Carbide documents · June 22, 1982

    Union Carbide Technical Center Memo on Non-Asbestos Compressed Gasketing Materials, with L. B. Hewitt Cover Note to W. B. Troutman (1982)

    …Center memorandum on non-asbestos compressed non-metallic gasketing materials. The memo said the non-asbestos gaskets had not been proven in Union Carbide's services, that limited testing showed poorer chemical resistance and lower maximum…

  2. Company document · Union Carbide documents · 1987

    Union Carbide Asbestos Removal and Phase-Out Papers, Including T. E. Hanning Memo on Contractor Project Development Group (1987)

    …Chemicals and Plastics Business Group, use of asbestos-containing materials in the work place Grafoil seminar outline and cover sheet (Union Carbide Specialty Products Group, Cleveland) Grafoil flexible graphite newsletter on special gasketing techniques Distribution list…

  3. Company document · Union Carbide documents · May 1987

    Union Carbide Memos and Draft C&P Program on Phasing Out Asbestos-Containing Materials in Company Workplaces (1986-1987)

    Six pages of Union Carbide papers from 1986-1987 on asbestos in the company's own facilities. They include a 9/29/86 draft Chemicals and Plastics (C&P) program to phase out asbestos-containing materials…

  4. Company document · Union Carbide documents · June 30, 1987

    Union Carbide Industrial Hygiene Asbestos Monitoring Reports for Silanes, Polymers and Monomers Areas, Prepared by C. R. McMillan and T. L. Grittie (1987)

    Twelve pages of industrial hygiene monitoring and results reports dated June and July 1987, covering airborne asbestos sampling taken February to April 1987 around insulation removal, glove bag use and asbestos insulation in Silanes, Polymers and…

  5. Company document · Union Carbide documents · August 8, 1986

    L. E. Calvert Transmitting Draft Recommended Policy on Use of Asbestos in the Workplace, with C. C. Neely Memo and C&P Draft Policy (1986)

    Cover letter from Larry E. Calvert (Houston) sending a draft asbestos policy to a distribution list, noting that the permissible exposure level fell from 2.0 to 0.2 fibers/cc (8-hour TWA) on July 21, 1986. Attached are a distribution list, an August…

  6. Company document · Union Carbide documents · August 18, 1986

    Larry E. Calvert to C. C. Neely on Asbestos vs. Non-Asbestos Gasketing and Packing Costs (1986)

    A 1986 memo titled "Asbestos vs Non-Asbestos" comparing the cost of asbestos gasketing and packing with non-asbestos materials (including Grafoil). It calculates breakeven labor times that account for wetting, bagging and landfill disposal of…

  7. Company document · Union Carbide documents · April 7, 1987

    T. L. Grittie, Industrial Hygiene Results on Asbestos Monitoring During Deinsulation of R-2 Reactor, Silanes (1987)

    Industrial hygiene results dated April 7, 1987 for breathing-zone asbestos samples taken February 10, 1987 on insulators removing insulation from reactor R-2 in the Reactor Area of Silanes inside a negative pressure enclosure. The two samples…

  8. Company document · Union Carbide documents · March 2, 1987

    C. C. Neely to L. E. Calvert and Task Group Members on Phaseout of Asbestos-Containing Materials in Chemicals and Plastics Group Work Places, with Attachments (1987)

    A March 2, 1987 Union Carbide Central Engineering memo from C. C. Neely announced that the Chemicals and Plastics Group's program to phase out asbestos-containing materials in its work places had been endorsed. It…

  9. Company document · Union Carbide documents · March 23, 1987

    T. E. Hanning to C. C. Neely Forwarding Asbestos Implementation Task Group Minutes and Standard Practice SH-256 (1987)

    …C. Neely, March 23, 1987, forwarding Asbestos Implementation Task Group March 17 meeting items Union Carbide Standard Practice SH-256 (December 1986), Removal and Handling of Asbestos-Containing Insulation Material: exposure limits, work practices, respirators, monitoring…

  10. Company document · Union Carbide documents · May 5, 1987

    R. S. Newberger and J. K. Kyle Memos on Asbestos Disposal and Ceiling Contamination at the Sistersville, WV Plant (1987)

    Two Union Carbide memoranda from the Sistersville, West Virginia plant. The first (May 5, 1987) reports that asbestos insulation was being stripped in the Silanes Department and that the burial location was full. The second (April…

  11. Company document · Union Carbide documents · March 1987

    Piping Technology Minutes (R. W. Engle) and S. S. Murphree to C. C. Neely on Replacing Asbestos Gaskets and Packing with Grafoil (1987)

    Two pages tied to the Asbestos Task Force meeting. Page 1 is Piping Technology minutes dated March 24, 1987 describing R. W. Engle's plan to revise valve and piping specifications to use Grafoil products in place of asbestos, with a July 1988 target…

  12. Company document · Union Carbide documents · November 29, 1984

    C. A. Gorrell to Maintenance First Line Supervisors on Mandatory Asbestos Hazard Training, with Sistersville Plant Asbestos Script, Slides and MSA Respirator Statement (1984)

    A November 29, 1984 memo from C. A. Gorrell told maintenance first-line supervisors that an asbestos hazards program was mandatory and had to be presented to their work groups before January 1, 1985. The exhibit also holds typed and handwritten…

  13. Company document · Union Carbide documents · October 16, 1986

    J. E. Sanders to L. E. Calvert, S. W. Clark, G. B. Elder and R. W. Engle Transmitting the Recommended C&P Program to Phase Out Asbestos-Containing Materials in the Workplace, with C. C. Neely's Cover Memo and Draft Policy (1986)

    Sanders' October 16, 1986 internal cover letter forwards to his team the recommendation on asbestos usage that he sent to Bob Perry. Attached are C. C. Neely's September 30, 1986 memo on the final draft of the Chemicals and Plastics Group program,…

  14. Company document · Union Carbide documents · June 22, 1987

    J. E. Sanders to C. C. Neely on Placing the Asbestos Phaseout Program in the TMS Technology Manuals (1987)

    Memo from J. E. Sanders to C. C. Neely replying to Neely's April 6, 1987 transmittal of Task Group meeting minutes. Sanders agreed that the asbestos phaseout program should reside in the CEO-sponsored TMS system, recommended summary statements in…

  15. Company document · Union Carbide documents · September 30, 1986

    C. C. Neely to J. E. Sanders Transmitting Final Draft of C&P Program to Phase Out Asbestos-Containing Materials in the Work Place, with Attachments (1986)

    Memo from C. C. Neely transmitting, for the Special Working Group, a final draft Chemicals and Plastics Group policy to phase out asbestos-containing materials in plant work places, with a January 1, 1989 purchase cut-off. It reports concerns raised…

  16. Company document · Union Carbide documents · March 23, 1987

    T. E. Hanning to C. C. Neely Forwarding Asbestos Implementation Task Group March 17 Meeting Items and Standard Practice SH-256 (1987)

    …Neely, March 23, 1987, on Asbestos Implementation Task Group March 17 meeting items Attached Union Carbide Standard Practice SH-256 (December 1986), Removal and Handling Asbestos-Containing Insulation Material: OSHA/EPA standards, work practices, protective equipment…

  17. Company document · Union Carbide documents · July 24, 1986

    E. L. Doerflein to L. E. Calvert Transmitting Sistersville Plant Asbestos Handling Procedure and Insulation Philosophy (1986)

    Cover memo from E. L. Doerflein to L. E. Calvert forwarding the Sistersville Plant's asbestos handling procedure and insulation philosophy for a group developing a recommended C&P asbestos policy. It states that asbestos insulation purchases stopped…

  18. Company document · Union Carbide documents · February 5, 1986

    G. W. Wulfert to Department Heads and Maintenance Staff on Asbestos Insulation Philosophy at the Sistersville Plant (1986)

    A February 5, 1986 memo from the Sistersville Plant maintenance manager transmitting the plant's philosophies and guidelines for handling asbestos insulation. The attached two-page guideline says the plant would identify and seal asbestos insulation…

  19. Company document · Union Carbide documents · May 7, 1987

    G. W. Wulfert to F. E. Dailey and Others on Future Asbestos Disposal Sites at Sistersville (1987)

    Memorandum dated May 7, 1987 stating that the Sistersville plant's asbestos disposal landfill was nearing the end of its life and that a new plan was needed. It called a meeting on May 26, 1987 at 1 PM in Building 33 to develop that plan.…

  20. Company document · Union Carbide documents · February 5, 1986

    G. W. Wulfert to Department Heads and Maintenance on Asbestos Insulation Philosophy at the Sistersville Plant (1986)

    A cover memo from the Sistersville Plant maintenance manager transmitting the plant's philosophies and guidelines for asbestos insulation, copied to D. G. Beddow, K. F. Carroll, L. W. Phair and W. V. Summers. The attachment says the plant would seal…