Company document · Union Carbide documents · March 23, 1972
R. W. Cope Project Report on Industrial Hygiene Survey and Asbestos Air Analyses at the Bound Brook Plant (1972)
Project report (Project 910E10) on a February 14-15, 1972 visit to the Bound Brook Plant to sample air for asbestos fibers near Unit B, Building 3, and for nuisance dust at Unit 5, and to survey other production units for environmental health…
-
Company document · Union Carbide documents · October 5, 1972
S. B. Nelson to P. B. Potter on General Electric's Plan to Discontinue Asbestos-Filled Phenolic Molding Material (1972)
Memo from the Boston sales office reporting that General Electric planned to discontinue its asbestos-filled heat-resistant phenolic molding material because of OSHA requirements, and that GE customers were reacting with concern. It recommended that…
-
Company document · Union Carbide documents · January 3, 1974
R. T. Marold to W. F. Ark and Others Transmitting Bulk Handling Asbestos Program Review, Carey Floats vs. Calidria Pelleted Asbestos, Bound Brook (1974)
…in bulk for the phenolic molding compound department at Bound Brook: Union Carbide's pelleted SG-200 asbestos (Calidria) or Carey floats asbestos. The memo asks whether Union Carbide will keep supplying asbestos-filled molding materials…
-
Company document · Union Carbide documents
D. E. Gould to J. H. Barrett and Others on Asbestos Warning for Heat Resistant Phenolics
…E. Gould stating that the asbestos fibers in Union Carbide's heat resistant phenolic compounds were considered modified by a bonding agent and therefore exempt from the caution-label requirement in the June 7, 1972 Federal…
-
Company document · Union Carbide documents · September 26, 1973
R. T. Marold, C. F. Martino and P. B. Potter on the Asbestos Replacement Program and Calidria Grinding Tests (1973)
Memo reporting a special meeting of the Asbestos Replacement Committee on September 19, 1973, held after production grinding tests on BMM-6935 did not give an acceptable dispersion of Calidria asbestos. It records an estimated 6 to 9 month delay,…
-
Company document · Union Carbide documents · February 24, 1972
R. W. Cope Project Report on Industrial Hygiene Survey of Air Analyses at the Bound Brook Plant (1972)
Project report on R. W. Cope's January 27-28, 1972 visit to the Bound Brook Plant to meet New Jersey inspectors and compare dust sampling methods, with air samples taken in several departments. Asbestos fiber samples at Building 3, Unit C ranged…
-
Company document · Union Carbide documents · March 29, 1972
R. E. Graebert to R. E. Nicolson on the Labor Department Asbestos Standard and Reducing Asbestos Use in Molding Compound (1972)
A one-page memo dated March 29, 1972, headed "Asbestos." It states that the Labor Department standard was 5 fibers per cubic centimeter of air and that measurements in various operating areas met it. It says many people expected the standard to fall…
-
Company document · Union Carbide documents
D. E. Gould on Asbestos Warning Labels for Heat Resistant Phenolics (Group I Distribution Operations memo)
…E. Gould stating that the asbestos fibers in Union Carbide's heat resistant phenolic compounds were considered modified by a bonding agent and so exempt from the caution-label requirement in the June 7, 1972 Federal…
-
Company document · Union Carbide documents · January 4, 1973
J. M. Swalm to R. A. DeCoudres on Bound Brook In-Plant Environmental Activities for December 1972, Including Airborne Asbestos (1973)
Internal Union Carbide memo summarizing environmental items at the Bound Brook plant for December 1972, copied to about a dozen others. Topics include an OSHA citation, sewer monitoring, waste disposal, dust, noise, odors, carbon monoxide and…