No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

31 results for “Union Carbide Corporation”, page 1 of 2

  1. Company document · Union Carbide documents · September 12, 1986

    C. P. Maxwell to Browning, Collins, Graham, Keller, Mills, Noble and Rucker Transmitting M. A. Patel's OSHA Amended Asbestos Standard Training Slides (1986)

    A handwritten cover note dated September 12, 1986 from C. P. Maxwell forwards copies of overhead slides that Manhar Patel prepared and used in a training session for Services and Construction Department supervisors on the OSHA amended asbestos…

  2. Company document · Union Carbide documents · August 1980

    Industrial Hygiene Monitoring for Asbestos: D. C. Shamblin Stripping Insulation, Bldg. 777, Reports to R. F. Painter (August 1980)

    Two Industrial Hygiene Monitoring for Asbestos forms covering personal air sampling of D. C. Shamblin while stripping insulation in Bldg. 777, Room 111, on 8/18/80 and 8/19/80. The forms list fiber concentrations, time-weighted averages compared…

  3. Company document · Union Carbide documents · April 4, 1983

    T. L. Collins to C. W. Carman et al. Transmitting T. A. Lincoln's Memo on Reporting Occupational Illnesses on the OSHA 200 Log (1983)

    A 4 April 1983 cover memo from T. L. Collins forwarded a 16 March 1983 internal memo from Dr. T. A. Lincoln, Corporate Medical Director, on reporting occupational illnesses. The Lincoln memo listed examples in seven OSHA 200 log categories,…

  4. Company document · Union Carbide documents · March 8, 1979

    Handwritten Memo to C. W. Carman on March 2 Meeting about Asbestos Exposure Compliance (1979)

    A one-page handwritten memo dated March 8, 1979, to C. W. Carman. The writer reports that he and a Mr. Shipley met with "George" on Friday, March 2, to discuss concerns about asbestos exposure. The memo says they asked for work and discussion on…

  5. Company document · Union Carbide documents · May 3, 1985

    M. F. Stowers and Manhar A. Patel to W. T. Shelton: Industrial Hygiene Monitoring for Asbestos, Bldg. 707 Heliflo Insulation Stripping (1985)

    Industrial hygiene monitoring report dated May 3, 1985 on personal air samples taken April 26, 1985 from two workers stripping old insulation from a heliflo system in Bldg. 707. Results were 0.38 and 0.27 fibers/cc over 35 minutes, compared against…

  6. Company document · Union Carbide documents · March 8, 1979

    Handwritten Memo from Randy [surname illegible] to C. W. Carman on Meeting About Asbestos Exposure Concerns (1979)

    A handwritten memo on a company memo form, dated March 8, 1979. The writer tells C. W. Carman that he and a Mr. Shipley met with "George" on Friday, March 2 to discuss their concerns about asbestos exposure. They asked George to come and discuss…

  7. Company document · Union Carbide documents · October 24, 1975

    C. W. Carman to R. W. Cope and Others Circulating the Asbestos Safety Procedure for Review (1975)

    A one-page cover memo from C. W. Carman to nine recipients sending an attached Asbestos Safety Procedure for approval and comments by November 5, 1975. The attachment is not included in the exhibit; the second page is blank.

  8. Company document · Union Carbide documents · October 5, 1978

    C. W. Carman to E. R. Levy on Review Meeting of Personnel Safety and Health Training Packages (1978)

    Memo dated October 5, 1978 from C. W. Carman to E. R. Levy, with copies to ten others, giving his comments on the personnel safety and health training elements discussed at a September 25, 1978 meeting. It lists suggestions from George Hurley, J. M.…

  9. Company document · Union Carbide documents · November 22, 1985

    G. W. Phares to B. H. Avashia, M.D., and Others on Asbestos Monitoring at South Charleston Plant (1985)

    Internal Union Carbide memo reporting asbestos exposure monitoring done on November 18, 1985 while construction employees stripped and bagged insulation from a tank at the South Charleston polyols unit. It states that all samples were below…

  10. Company document · Union Carbide documents · November 16, 1979

    Technical Center IH/EP (Ruth Clise) to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse (1979)

    Internal industrial hygiene report on air sampling done October 26, 1979 while Construction workers stripped and bagged asbestos-containing insulation from an exhaust duct in the Building 704 Powerhouse in South Charleston. It reports that dust on…

  11. Company document · Union Carbide documents · December 5, 1978

    G. F. Hurley and M. E. Perry to Distribution on Clarification of Monitoring for Removal and Disposal of Asbestos-Containing Insulation (1978)

    A December 5, 1978 memorandum from G. F. Hurley and M. E. Perry to a distribution list clarifying items 1 and 2 of a November 6, 1978 Merz/Perry letter on removal and disposal of asbestos-containing insulation. It states that the Industrial Hygiene…

  12. Company document · Union Carbide documents · December 12, 1984

    M. F. Stowers to G. W. Phares on Asbestos Monitoring During Insulation Stripping at the Institute Plant (1984)

    Internal memo reporting personal asbestos exposure monitoring on November 13, 1984 during stripping of about 100 ft of asbestos-containing steam line insulation at the Institute plant. It states that all four samples were well below the 2.0 fibers…

  13. Company document · Union Carbide documents · July 17, 1981

    Industrial Hygiene Monitoring for Asbestos: R. F. Painter Report on Insulation Stripping and Bagging, Bldg. 774 (1981)

    Four 'Industrial Hygiene Monitoring for Asbestos' forms (Computer Ref. W-1198), dated July 17, 1981 and stamped Business Confidential. They report AM and PM personal air samples for four workers on 07/10/81 during stripping and bagging of insulation…

  14. Company document · Union Carbide documents · July 16, 1982

    Manhar A. Patel to J. C. Smith on Dust and MEK Monitoring in the Sandblast Shed, 511 Construction Institute Plant (1982)

    Internal Union Carbide letter reporting dust sampling for 'Black Beauty' in the Sandblast Shed and methyl ethyl ketone (MEK) sampling in the Paint Preparation Shed at the 511 Construction Institute Plant, May-June 1982. It says…

  15. Company document · Union Carbide documents · August 14, 1978

    E. R. Levy Memo on Orientation for Personnel Safety and Health Training Package Preparers, with L. S. Slaughter Memo and Engineering Department Training Team Report (1978)

    The exhibit holds two Union Carbide Engineering memoranda from August 1978 and attachments from a report of the Engineering Department's personnel safety and health training task team. E. R. Levy's memo of August 14…

  16. Company document · Union Carbide documents · January 8, 1986

    T. L. Collins to B. R. McMakin and R. W. Scoular on EPA Enforcement of Asbestos Removal Regulations (1986)

    Internal Union Carbide Technical Center memo transmitting an item from the January 3, 1986 issue of Inside EPA on enforcement of asbestos removal regulations. The memo said EPA was apparently giving high priority to monitoring asbestos…

  17. Company document · Union Carbide documents · May 16, 1985

    M. F. Stowers to R. S. Howell on Asbestos Monitoring During Insulation Stripping at the Institute Plant (1985)

    Internal memo reporting asbestos air monitoring done on May 7, 1985 while construction employees stripped about 200 ft. of insulation from 3 inch process lines near the Pesticide B Unit at the Institute plant. It states all samples were below the…

  18. Company document · Union Carbide documents · October 20, 1981

    M. A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Gasket Shop, Institute Plant (1981)

    Internal memo reporting area and personal asbestos exposure monitoring in the Gasket Shop (laundry, Building 3 of the Construction Department) at the Institute Plant, done by the plant's industrial hygiene group on October 2 and 9, 1981. It states…

  19. Company document · Union Carbide documents · October 7, 1986

    A. F. Terry to T. L. Collins and Others on Asbestos Exposure Monitoring of Steam Line Stripping, Building 726 (1986)

    Internal Union Carbide memo transmitting asbestos air-monitoring results for two employees, R. P. Hess and F. R. Creech, who stripped asbestos insulation from steam lines outside and inside the Building 726 compressor room on September…

  20. Company document · Union Carbide documents · August 1980

    Ruth Clise to R. F. Painter: Industrial Hygiene Monitoring Reports for Asbestos During Insulation Stripping in Bldg. 777 (1980)

    Five 'Industrial Hygiene Monitoring for Asbestos' report forms addressed to R. F. Painter with copies to several others. They give personal air-sampling results for workers wetting, bagging and stripping insulation at Bldg. 777 on 8/18/80, 8/19/80…