8 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · September 30, 1983
D. W. Moody, Jr. to C. D. Twait on Asbestos in Valve Packing and Gaskets at Carbide Plants, with Twait's Request and Central Engineering Asbestos Fibers Write-up (1983)
…W. Moody, Jr. to C. D. Twait, Sept. 30, 1983, on asbestos in valve packing and gaskets in Carbide plants Handwritten memo from G. D. Twait to E. C. Powell, Jr., Sept. 23, 1983, requesting comments…
-
Company document · Union Carbide documents · March 21, 1984
G. D. Twait to Wayne Williams on November 1983 Revisions to SH-256, Removal and Handling of Asbestos-Containing Insulation Material (1984)
A handwritten 1984 note from G. D. Twait to Wayne Williams confirming that the asbestos permissible exposure limit in the November 1983 revision of SH-256 would stay at 0.5 fibers/cc, with attached material. The attachments are the OSHA emergency…
-
Company document · Union Carbide documents · November 21, 1986
D. C. Kirby to D. G. Beddow Transmitting the Sistersville Polymers I Operational Safety/Health Survey (1986)
A November 1986 memorandum transmitting the final report of an Operational Safety/Health Survey of the Sistersville Polymers I unit, conducted October 20-24, 1986. The attached report cover and one findings page (page 13) follow, including a…
-
Company document · Union Carbide documents · November 21, 1986
D. C. Kirby to S. E. Illikainen Transmitting the Operations Safety/Health Survey of the Institute No. 2 Power House, with Excerpt on Asbestos Insulation (1986)
Memorandum transmitting the final report of an Operations Safety/Health Survey of the Institute No. 2 Power House, conducted October 6-10, 1986. The exhibit also includes report page 20, which lists findings on arsenic and lead exposure, polycyclic…
-
Company document · Union Carbide documents · July 23, 1987
D. C. Kirby to R. R. Burns Transmitting the Operational Safety/Health Survey of the Institute Plant Distribution Facilities (1987)
A July 23, 1987 memorandum from D. C. Kirby to R. R. Burns, with a long copy list, transmitting the final report of a June 8-12, 1987 operational safety/health survey of the Distribution Facilities at the Institute Plant. The attached report (title…
-
Company document · Union Carbide documents · September 18, 1987
D. C. Kirby to S. E. Illikainen Transmitting the Operational Safety/Health Survey of the No. 1 Power House, Institute Plant (1987)
A cover memo from D. C. Kirby transmitting the final report of a July 27-31, 1987 operational safety/health survey of the No. 1 Power House at the Institute, West Virginia plant, followed by the report's title page and one page (page 11) of 'Less…
-
Company document · Union Carbide documents · July 1987
Operational Safety/Health Survey of No. 1 Power House, Institute Plant, by R. S. Holmes, D. C. Kirby, R. W. Light and L. J. Sydenstricker (1987)
Excerpt (cover page and page 11) of a safety/health survey of the No. 1 Power House at the Institute Plant, conducted July 27-31, 1987. Page 11 lists 'less serious health concerns': exposed and deteriorated asbestos insulation that was not labeled,…
-
Company document · Union Carbide documents · February 1984
Final Report: Operational Safety/Health Survey of No. 3 Power House, Texas City Plant (1984)
Final report of an operational safety/health survey of the No. 3 Power House at the Texas City plant, conducted February 13-17, 1984. It found no imminent hazards, listed two major equipment concerns and several less serious concerns, and included…