8 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · April 28, 1980
Industrial Hygiene Monitoring for Asbestos at #1 Powerhouse, Institute: Insulation Stripping and Bagging Results for Jividen, Cobb and Grant (1980)
Three industrial hygiene monitoring forms dated 4/28/80 report airborne asbestos fiber sampling at the #1 Powerhouse at Institute while insulation was stripped from steam lines on the #1 boiler and bagged for disposal. Sample results are given for…
-
Company document · Union Carbide documents · August 5, 1980
Industrial Hygiene Monitoring for Asbestos: Air Samples for J. W. Greenlee and R. E. Raines, Building 707 (1980)
Two Industrial Hygiene Monitoring for Asbestos forms dated 8/5/80, each reporting one air sample taken in Bldg. 707, Fourth Level, Cell 11, during stripping and bagging of suspected asbestos-containing insulation from about 50 feet of steam line.…
-
Company document · Union Carbide documents · August 19, 1980
Industrial Hygiene Monitoring for Asbestos Reports to W. T. Shelton on Insulation Stripping in Bldg. 706 (1980)
Two industrial hygiene monitoring forms for asbestos dated 8/19/80, each reporting one air sample taken in Bldg. 706 (West End, second and third level) while a worker stripped and bagged insulation on the G-101 autoclave and adjacent lines. The…
-
Company document · Union Carbide documents · April 11, 1980
Industrial Hygiene Monitoring for Asbestos Reports to D. L. Johnson on Insulation Stripping and Bagging at #1 Powerhouse, Institute (1980)
Four Industrial Hygiene Monitoring for Asbestos forms, all dated 4/11/80 and addressed to D. L. Johnson with the same cc list. Each reports airborne fiber sampling of a worker at the #1 Powerhouse, Institute, during stripping or bagging of…
-
Company document · Union Carbide documents · April 28, 1980
Industrial Hygiene Monitoring Reports for Asbestos at the Institute #1 Powerhouse, Sent to D. L. Johnson (1980)
Three Industrial Hygiene Monitoring for Asbestos forms, all dated 4/28/80, report fiber concentrations measured on workers T. L. Jividen, F. E. Cobb and T. G. Grant while they stripped and bagged insulation from steam lines on the #1 boiler at the…
-
Company document · Union Carbide documents · April 16, 1980
Industrial Hygiene Monitoring for Asbestos: Stripping and Bagging Unibestos Pipe Insulation at South Charleston Plant, T. J. Kennedy, M. Smith and M. L. Finney (1980)
Three industrial hygiene monitoring forms dated 4/16/80 report airborne asbestos fiber results for workers stripping and bagging about 200 feet of Unibestos pipe insulation on a pipe rack at the South Charleston Plant. Each form lists sample…
-
Company document · Union Carbide documents · August 19, 1980
Industrial Hygiene Monitoring for Asbestos, Reports to W. T. Shelton on Insulation Stripping at Bldg. 706 (1980)
Two industrial hygiene monitoring forms dated 8/19/80, each reporting one personal air sample for asbestos taken at Bldg. 706, West End, second and third level, during stripping and bagging of insulation on the G-101 autoclave and adjacent lines.…
-
Company document · Union Carbide documents · April 1980
Industrial Hygiene Monitoring for Asbestos Reports to D. L. Johnson on Insulation Stripping and Bagging at #1 Powerhouse, Institute (1980)
Seven one-page industrial hygiene monitoring forms for asbestos, each reporting fiber concentrations (fibers >5 µm/cm3) for a named worker stripping or bagging insulation at the #1 Powerhouse, Institute, on 4/28/80 and 4/11/80. Each lists sample…