No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

43 results for “Union Carbide Corporation”, page 1 of 3

  1. Company document · Union Carbide documents · August 1980

    Industrial Hygiene Monitoring for Asbestos: D. C. Shamblin Stripping Insulation, Bldg. 777, Reports to R. F. Painter (August 1980)

    Two Industrial Hygiene Monitoring for Asbestos forms covering personal air sampling of D. C. Shamblin while stripping insulation in Bldg. 777, Room 111, on 8/18/80 and 8/19/80. The forms list fiber concentrations, time-weighted averages compared…

  2. Company document · Union Carbide documents · November 22, 1985

    G. W. Phares to B. H. Avashia, M.D., and Others on Asbestos Monitoring at South Charleston Plant (1985)

    Internal Union Carbide memo reporting asbestos exposure monitoring done on November 18, 1985 while construction employees stripped and bagged insulation from a tank at the South Charleston polyols unit. It states that all samples were below…

  3. Company document · Union Carbide documents · November 16, 1979

    Technical Center IH/EP (Ruth Clise) to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse (1979)

    Internal industrial hygiene report on air sampling done October 26, 1979 while Construction workers stripped and bagged asbestos-containing insulation from an exhaust duct in the Building 704 Powerhouse in South Charleston. It reports that dust on…

  4. Company document · Union Carbide documents · March 21, 1977

    G. W. Bott to W. T. Shelton on Water Sprayers for Removing Asbestos Pipe Covering at the Tech Center (1977)

    Internal Union Carbide correspondence from G. W. Bott to W. T. Shelton recommending the purchase of two one-gallon garden-type sprayers, similar to the Hudson Model 6215, for the Tech Center. The sprayers were to…

  5. Company document · Union Carbide documents · June 20, 1984

    M. A. Patel to J. W. Karn on Asbestos Monitoring at the Sistersville Plant (1984)

    Memo from M. A. Patel to J. W. Karn transmitting results of asbestos air monitoring at the Sistersville Plant (Steam Plant third level and Polymer 2, Building 48) during insulation stripping on April 2 and 25, 1984. It reports high fiber levels in…

  6. Company document · Union Carbide documents · December 12, 1984

    M. F. Stowers to G. W. Phares on Asbestos Monitoring During Insulation Stripping at the Institute Plant (1984)

    Internal memo reporting personal asbestos exposure monitoring on November 13, 1984 during stripping of about 100 ft of asbestos-containing steam line insulation at the Institute plant. It states that all four samples were well below the 2.0 fibers…

  7. Company document · Union Carbide documents · January 6, 1984

    L. R. Noble to J. W. Barna and Others on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)

    Memorandum documenting a January 5, 1984 meeting on how Construction Department employees would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It sets out eight action steps: EPA…

  8. Company document · Union Carbide documents · July 17, 1981

    Industrial Hygiene Monitoring for Asbestos: R. F. Painter Report on Insulation Stripping and Bagging, Bldg. 774 (1981)

    Four 'Industrial Hygiene Monitoring for Asbestos' forms (Computer Ref. W-1198), dated July 17, 1981 and stamped Business Confidential. They report AM and PM personal air samples for four workers on 07/10/81 during stripping and bagging of insulation…

  9. Company document · Union Carbide documents · July 16, 1982

    Manhar A. Patel to J. C. Smith on Dust and MEK Monitoring in the Sandblast Shed, 511 Construction Institute Plant (1982)

    Internal Union Carbide letter reporting dust sampling for 'Black Beauty' in the Sandblast Shed and methyl ethyl ketone (MEK) sampling in the Paint Preparation Shed at the 511 Construction Institute Plant, May-June 1982. It says…

  10. Company document · Union Carbide documents · May 25, 1979

    G. W. Bott to W. T. Shelton on Asbestos Exposure Survey of Insulators Stripping Old Insulation in Building 707 (1979)

    Internal memo reporting an industrial hygiene survey, conducted May 9, 1979, of asbestos exposure of insulators stripping about ten feet of 1-inch steam condensate line insulation in Building 707 at South Charleston. It reports that the insulation…

  11. Company document · Union Carbide documents · June 20, 1984

    M. A. Patel to J. W. Karn on Asbestos Monitoring at the Sistersville Plant (1984)

    Memorandum from M. A. Patel to J. W. Karn transmitting results of asbestos air monitoring at the Sistersville Plant (Steam Plant and Polymer 2, Building 48) during insulation stripping by Construction Department employees on April 2 and 25, 1984.…

  12. Company document · Union Carbide documents · May 16, 1985

    M. F. Stowers to R. S. Howell on Asbestos Monitoring During Insulation Stripping at the Institute Plant (1985)

    Internal memo reporting asbestos air monitoring done on May 7, 1985 while construction employees stripped about 200 ft. of insulation from 3 inch process lines near the Pesticide B Unit at the Institute plant. It states all samples were below the…

  13. Company document · Union Carbide documents · January 6, 1984

    L. R. Noble to J. W. Barna and Others on the Asbestos Insulation Removal Project at the Sistersville Plant Steam Plant and Monomers Unit (1984)

    Memorandum documenting a January 5, 1984 meeting on how the Construction Department would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action steps with…

  14. Company document · Union Carbide documents · November 9, 1979

    G. W. Bott to M. E. Perry on Asbestos Exposure from Sawing Transite Board on the DoAll Saw, Bldg. 704 Machine Shop (1979)

    Internal industrial hygiene report on an October 30, 1979 survey of asbestos exposure while a machinist sawed transite (asbestos-containing) board on a DoAll saw in the Building 704 machine shop at South Charleston, West Virginia. It reports sample…

  15. Company document · Union Carbide documents · February 13, 1979

    G. W. Bott to W. T. Shelton on Asbestos Exposure Survey of Reactor Lids Covered with Asbestos Paper (1979)

    Internal Union Carbide memo reporting an industrial hygiene survey, dated February 7, 1979, of asbestos exposure while an insulator covered two small reactor lids with Johns-Manville 32-pound asbestos paper. One sample for J. R…

  16. Company document · Union Carbide documents · July 6, 1979

    G. W. Bott to P. W. Young on Asbestos Exposure Survey of Insulators Stripping Old Insulation at Institute Plant (1979)

    Internal Union Carbide memo reporting an industrial hygiene survey on July 2, 1979 of construction insulators stripping asbestos insulation from the #3 turbine and about thirty feet of four-inch pipe in Building 17 at the…

  17. Company document · Union Carbide documents · March 27, 1979

    D. R. Paugh to H. H. Frazier on Use of AMATEX Asbestos Tape in Plant 512 (1979)

    …AMATEX asbestos tape in Plant 512. It stated that the construction group was phasing out the asbestos tape and arranging to stock and use a fiberglas tape made by Amatex Corporation. It referenced a 3/15…

  18. Company document · Union Carbide documents · June 20, 1984

    M. A. Patel to J. W. Karn on Asbestos Monitoring at Sistersville Plant (1984)

    Memorandum from M. A. Patel to J. W. Karn transmitting results of asbestos exposure monitoring at the Sistersville Plant (Steam Plant and Polymer 2, Building 48) during insulation stripping on April 2 and 25, 1984. The memo states that Building 48…

  19. Company document · Union Carbide documents · October 20, 1981

    M. A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Gasket Shop, Institute Plant (1981)

    Internal memo reporting area and personal asbestos exposure monitoring in the Gasket Shop (laundry, Building 3 of the Construction Department) at the Institute Plant, done by the plant's industrial hygiene group on October 2 and 9, 1981. It states…

  20. Company document · Union Carbide documents · November 5, 1979

    G. W. Bott to W. T. Shelton on Asbestos Exposure Survey of Insulators Stripping Old Insulation, Building 773 (1979)

    Internal Union Carbide report on a November 2, 1979 survey of asbestos exposure of insulators stripping insulation from a reactor column at Building 773, South Charleston, West Virginia. It reports fiber concentrations of 0.4 and…