7 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · July 15, 1985
Industrial Hygiene Sampling Results for Asbestos in the Gasket Storage Bin Area, Building 330, Institute Plant, to R. G. Hull (1985)
A two-page industrial hygiene report on area air sampling for asbestos near the gasket storage bins in Building 330 at the Institute Plant on June 20 and 21, 1985. The cover form states that measurements were well below the permissible exposure…
-
Company document · Union Carbide documents · March 15, 1979
H. H. Frazier to Peter Barna on Use of AMATEX Asbestos Tape in Plant 512 (1979)
Memo from H. H. Frazier to Peter Barna on three brands of insulating tape used at the Institute Plant. It reports that AMATEX tape contained raw asbestos fibers including dust, cites measurements of 0.03 to 1.9 fibers per cc at the Technical Center,…
-
Company document · Union Carbide documents · January 12, 1987
Industrial Hygiene Sampling Results for Asbestos Exposure During HAVEG Vessel Repair, Institute Plant Boilermaker Shop (1987)
Industrial hygiene report on air sampling for asbestos fibers taken November 13, 1986, while two boilermakers chipped HAVEG material to repair a vessel at the Institute Plant. It reports the eight-hour averages were below the permissible exposure…
-
Company document · Union Carbide documents · January 14, 1986
Industrial Hygiene Sampling Results for Asbestos Pipe Insulation Removal at Institute Plant, to P. J. Morris, with Laboratory Report (1986)
Industrial hygiene report on air sampling for asbestos on December 19, 1985, while a Maintenance Complex 7 insulator/painter and two other workers stripped pipe insulation at the MIC-II Unit at the Institute Plant. The report states that all results…
-
Company document · Union Carbide documents · March 15, 1983
H. H. Frazier to R. G. Hull, Jr. on Personal Asbestos Exposure During Acetone Unit Demolition, Complex VI (1983)
Internal Union Carbide memo from Industrial Hygiene at the Institute Plant reporting three airborne asbestos samples taken during insulation demolition at the Acetone Unit. It gives results of 0.2, 0.5 and 0.8 fibers…
-
Company document · Union Carbide documents · March 15, 1983
H. H. Frazier to P. J. Morris on Personal Asbestos Exposure Monitoring of Two Insulator/Painters at Maintenance Complex VIII, Institute Plant (1983)
Internal Union Carbide memo reporting personal air monitoring of two insulator/painters removing protective covering from asbestos-insulated pipe valve at Maintenance Complex VIII on 2/3/83. It reports 15-minute results of 0.8…
-
Company document · Union Carbide documents · July 2, 1985
Industrial Hygiene Sampling Results for Asbestos in Gasket Cutting, Institute Plant, Building 325, with Attached Results Table (1985)
Industrial hygiene sampling report dated July 2, 1985 on asbestos monitoring during gasket cutting from Garlock and Durabla materials at Building 325, Institute Plant, sampled June 14, 1985. The comments state one personal and one area sample were…