29 results for “Union Carbide Corporation”, page 1 of 2
-
Company document · Union Carbide documents
Union Carbide Institute Plant Asbestos Monitoring Memos: Tank 4621 Demolition (H. H. Frazier, 1978) and Powerhouse Insulation Removal (W. F. Blythe, Jr., 1977)
Two Union Carbide internal memos with a data table, reporting asbestos air monitoring at the Institute, West Virginia plant. The July 21, 1978 memo gives fiber counts from the removal of asbestos-containing Kaylo insulation from…
-
Company document · Union Carbide documents · July 21, 1978
Union Carbide Institute Plant Asbestos Air Monitoring Memos: H. H. Frazier to D. D. Miller (1978) and W. F. Blythe, Jr. to A. S. Howard and Others (1977), with Sample Data Sheet
Two Union Carbide internal memos from the Institute, West Virginia plant report airborne asbestos fiber counts taken during insulation removal work, followed by a one-page table of the August 1977 sample results. The July 1978…
-
Company document · Union Carbide documents · September 12, 1980
G. F. Hurley to B. E. Bess and Others on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)
Letter reporting asbestos air monitoring in the SEVIN operations area on September 3, 1980, which showed 0.1 fiber per cc. Six breathing-zone samples were taken on three men, but an analytical error left only one valid sample, for Mr. Smith. The…
-
Company document · Union Carbide documents · September 12, 1980
G. F. Hurley to B. E. Bess, P. W. Young and Others on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)
Letter reporting that asbestos monitoring in the SEVIN operations area on September 3, 1980 showed 0.1 fiber per cc, which it described as below the present OSHA standard. Six breathing-zone samples were taken on three men, but because of an…
-
Company document · Union Carbide documents · March 19, 1982
Industrial Hygiene Monitoring for Asbestos, Building 701-100 Insulation Cleanup, Reported to J. E. Midkiff (1982)
Four pages of Union Carbide industrial hygiene monitoring reports (computer refs. W-1401, W-1402, W-1405) dated March 19, 1982, giving airborne asbestos fiber results for workers Warren Abbot, Paul Crowder and Dave Shamblin during…
-
Company document · Union Carbide documents · November 16, 1979
Technical Center IH/EP (Ruth Clise) to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse (1979)
Internal industrial hygiene report on air sampling done October 26, 1979 while Construction workers stripped and bagged asbestos-containing insulation from an exhaust duct in the Building 704 Powerhouse in South Charleston. It reports that dust on…
-
Company document · Union Carbide documents · July 17, 1981
Industrial Hygiene Monitoring for Asbestos: R. F. Painter Report on Insulation Stripping and Bagging, Bldg. 774 (1981)
Four 'Industrial Hygiene Monitoring for Asbestos' forms (Computer Ref. W-1198), dated July 17, 1981 and stamped Business Confidential. They report AM and PM personal air samples for four workers on 07/10/81 during stripping and bagging of insulation…
-
Company document · Union Carbide documents · July 16, 1982
Manhar A. Patel to J. C. Smith on Dust and MEK Monitoring in the Sandblast Shed, 511 Construction Institute Plant (1982)
Internal Union Carbide letter reporting dust sampling for 'Black Beauty' in the Sandblast Shed and methyl ethyl ketone (MEK) sampling in the Paint Preparation Shed at the 511 Construction Institute Plant, May-June 1982. It says…
-
Company document · Union Carbide documents · July 25, 1980
H. H. Frazier to G. F. Hurley on Asbestos Exposure Potential at the No. 1 Steam Plant Precipitators, Institute Plant (1980)
Internal memo reporting air sampling for asbestos on July 21, 1980 around asbestos-containing insulation on the No. 1 Steam Plant precipitators during the boiler retubing project at the Institute plant. It lists personal and area sample results,…
-
Company document · Union Carbide documents · July 9, 1976
H. H. Frazier to P. H. Day on Employee Exposure to Asbestos in Plant Stores Building 330 (1976)
Memo reporting area and personal air samples for asbestos fibers taken on June 7 and June 16, 1976 at asbestos rope and gasket storage bins in Plant Stores Building 330, after questions from Plant Stores employees. Counts ranged from 0.0 to 1.0…
-
Company document · Union Carbide documents · July 6, 1979
G. W. Bott to P. W. Young on Asbestos Exposure Survey of Insulators Stripping Old Insulation at Institute Plant (1979)
Internal Union Carbide memo reporting an industrial hygiene survey on July 2, 1979 of construction insulators stripping asbestos insulation from the #3 turbine and about thirty feet of four-inch pipe in Building 17 at the…
-
Company document · Union Carbide documents · July 25, 1980
H. H. Frazier to G. F. Hurley on Asbestos Exposure Potential at the Precipitators, No. 1 Steam Plant, Institute Plant (1980)
Internal correspondence from Industrial Hygiene reporting airborne asbestos sampling on July 21, 1980 at the No. 1 Steam Plant precipitators, where protective cover over asbestos-containing insulation had been torn off by a storm. It lists personal…
-
Company document · Union Carbide documents · October 20, 1981
M. A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Gasket Shop, Institute Plant (1981)
Internal memo reporting area and personal asbestos exposure monitoring in the Gasket Shop (laundry, Building 3 of the Construction Department) at the Institute Plant, done by the plant's industrial hygiene group on October 2 and 9, 1981. It states…
-
Company document · Union Carbide documents · April 26, 1982
Mark E. Bell to R. F. Painter: Industrial Hygiene Monitoring for Asbestos, D. C. Shamblin, Building 706 (1982)
Union Carbide 'Industrial Hygiene Monitoring for Asbestos' form, Computer Ref. W-1315, reporting air sampling of D. C. Shamblin in Building 706 on 4/21/82. It lists a personal sample of 1.2 fibers >5…
-
Company document · Union Carbide documents · January 24, 1973
H. H. Frazier to Fred Williams on Asbestos Sampling Values in the Plant 511 Insulation Fabrication Shop (1973)
Internal correspondence from the Employee Relations Hygiene/Safety department at the Institute Plant, forwarding asbestos fiber counts from 15 personal samples taken in 1972 at the Plant 511 Insulation Fabrication Shop. The tasks sampled involved…
-
Company document · Union Carbide documents · August 1980
Ruth Clise to R. F. Painter: Industrial Hygiene Monitoring Reports for Asbestos During Insulation Stripping in Bldg. 777 (1980)
Five 'Industrial Hygiene Monitoring for Asbestos' report forms addressed to R. F. Painter with copies to several others. They give personal air-sampling results for workers wetting, bagging and stripping insulation at Bldg. 777 on 8/18/80, 8/19/80…
-
Company document · Union Carbide documents · October 23, 1981
M. A. Patel to W. L. Browning, J. W. Perry Jr. and Others on Asbestos Monitoring in the Gasket Shop, 512 Construction, Institute Plant, with Replacement Letter and Data Sheet (1981)
Internal Union Carbide correspondence from Manhar A. Patel. A cover note says an October 20, 1981 letter on asbestos monitoring in the Institute Plant gasket shop contained an error and should be replaced. The replacement letter…
-
Company document · Union Carbide documents · April 6, 1976
H. H. Frazier to J. F. Ballew, Jr. on Airborne Asbestos Fiber Counts During Preparation of Residue Analysis Sample Dishes, Institute Plant (1976)
Memo from H. H. Frazier of Industrial Hygiene to J. F. Ballew, Jr. reporting three fiber-count samplings of employees preparing sample dishes with asbestos fibers in Analytical Laboratory Room 108, with results of 4.9, 47.6 and 7.7 fibers/ml. It…
-
Company document · Union Carbide documents · March 15, 1979
H. H. Frazier to Peter Barna on Use of AMATEX Asbestos Tape in Plant 512 (1979)
Memo from H. H. Frazier to Peter Barna on three brands of insulating tape used at the Institute Plant. It reports that AMATEX tape contained raw asbestos fibers including dust, cites measurements of 0.03 to 1.9 fibers per cc at the Technical Center,…
-
Company document · Union Carbide documents · July 9, 1976
H. H. Frazier to P. H. Day on Employee Exposure to Asbestos in Plant Stores, Building 330 (1976)
Memo reporting area and personal air samples for asbestos taken in June 1976 in Plant Stores Building 330, where asbestos rope and metal-reinforced gaskets were stored and dispensed. It states that the results were within the new TLV of two fibers…