No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

6 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents · August 5, 1980

    Industrial Hygiene Monitoring for Asbestos: Air Samples for J. W. Greenlee and R. E. Raines, Building 707 (1980)

    Two Industrial Hygiene Monitoring for Asbestos forms dated 8/5/80, each reporting one air sample taken in Bldg. 707, Fourth Level, Cell 11, during stripping and bagging of suspected asbestos-containing insulation from about 50 feet of steam line.…

  2. Company document · Union Carbide documents · August 19, 1980

    Industrial Hygiene Monitoring for Asbestos Reports to W. T. Shelton on Insulation Stripping in Bldg. 706 (1980)

    Two industrial hygiene monitoring forms for asbestos dated 8/19/80, each reporting one air sample taken in Bldg. 706 (West End, second and third level) while a worker stripped and bagged insulation on the G-101 autoclave and adjacent lines. The…

  3. Company document · Union Carbide documents · November 16, 1979

    Technical Center IH/EP (Ruth Clise) to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse (1979)

    Internal industrial hygiene report on air sampling done October 26, 1979 while Construction workers stripped and bagged asbestos-containing insulation from an exhaust duct in the Building 704 Powerhouse in South Charleston. It reports that dust on…

  4. Company document · Union Carbide documents · April 11, 1980

    Industrial Hygiene Monitoring for Asbestos Reports to D. L. Johnson on Insulation Stripping and Bagging at #1 Powerhouse, Institute (1980)

    Four Industrial Hygiene Monitoring for Asbestos forms, all dated 4/11/80 and addressed to D. L. Johnson with the same cc list. Each reports airborne fiber sampling of a worker at the #1 Powerhouse, Institute, during stripping or bagging of…

  5. Company document · Union Carbide documents · April 16, 1980

    Industrial Hygiene Monitoring for Asbestos: Stripping and Bagging Unibestos Pipe Insulation at South Charleston Plant, T. J. Kennedy, M. Smith and M. L. Finney (1980)

    Three industrial hygiene monitoring forms dated 4/16/80 report airborne asbestos fiber results for workers stripping and bagging about 200 feet of Unibestos pipe insulation on a pipe rack at the South Charleston Plant. Each form lists sample…

  6. Company document · Union Carbide documents · August 19, 1980

    Industrial Hygiene Monitoring for Asbestos, Reports to W. T. Shelton on Insulation Stripping at Bldg. 706 (1980)

    Two industrial hygiene monitoring forms dated 8/19/80, each reporting one personal air sample for asbestos taken at Bldg. 706, West End, second and third level, during stripping and bagging of insulation on the G-101 autoclave and adjacent lines.…