No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

51 results for “Union Carbide Corporation”, page 1 of 3

  1. Company document · Union Carbide documents · September 24, 1987

    Union Carbide Petrochemical Divisions Safety and Health Information Manual No. 46, Assigned to J. R. Dement, with Internal Exposure Standards List (1987)

    …September 24, 1987, restricted for internal use only Union Carbide Internal Exposure Standards List (pages 1-18 of the list, alternating with pages of notes of explanation and definitions), including the asbestos entry on page 3…

  2. Company document · Union Carbide documents · 1987

    Union Carbide Asbestos Removal and Phase-Out Papers, Including T. E. Hanning Memo on Contractor Project Development Group (1987)

    …Chemicals and Plastics Business Group, use of asbestos-containing materials in the work place Grafoil seminar outline and cover sheet (Union Carbide Specialty Products Group, Cleveland) Grafoil flexible graphite newsletter on special gasketing techniques Distribution list…

  3. Company document · Union Carbide documents · May 1987

    Union Carbide Memos and Draft C&P Program on Phasing Out Asbestos-Containing Materials in Company Workplaces (1986-1987)

    Six pages of Union Carbide papers from 1986-1987 on asbestos in the company's own facilities. They include a 9/29/86 draft Chemicals and Plastics (C&P) program to phase out asbestos-containing materials…

  4. Company document · Union Carbide documents · June 30, 1987

    Union Carbide Industrial Hygiene Asbestos Monitoring Reports for Silanes, Polymers and Monomers Areas, Prepared by C. R. McMillan and T. L. Grittie (1987)

    Twelve pages of industrial hygiene monitoring and results reports dated June and July 1987, covering airborne asbestos sampling taken February to April 1987 around insulation removal, glove bag use and asbestos insulation in Silanes, Polymers and…

  5. Company document · Union Carbide documents · April 7, 1987

    T. L. Grittie, Industrial Hygiene Results on Asbestos Monitoring During Deinsulation of R-2 Reactor, Silanes (1987)

    Industrial hygiene results dated April 7, 1987 for breathing-zone asbestos samples taken February 10, 1987 on insulators removing insulation from reactor R-2 in the Reactor Area of Silanes inside a negative pressure enclosure. The two samples…

  6. Company document · Union Carbide documents

    Handwritten Asbestos Abatement Project Meeting Notes and J. R. Dement Note to J. C. Wandell on Maintenance Procedure

    Page 1 is an unsigned handwritten set of notes headed 'Asb Abatement Project Mtg', listing agenda items and five steps for an asbestos insulation project, including pre-approval of funds and allocation factors. Page 2 is a handwritten note from J.…

  7. Company document · Union Carbide documents · March 25, 1987

    J. K. Corrie to Maintenance Staff Transmitting Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)

    A March 25, 1987 cover memo from J. K. Corrie circulating a final review draft of Maintenance Safety Procedure XVIII, Asbestos Handling, for the South Charleston plant, with comments requested by April 3, 1987. The attached 20-page draft (dated…

  8. Company document · Union Carbide documents · May 21, 1987

    South Charleston Plant Accident/Incident Report and Review Board Analysis on Vapor Release Under Plastic Enclosure at Tanks 643-644 During Asbestos Insulation Removal (1987)

    Accident/incident report and informal Review Board analysis of a May 21, 1987 near-miss in the Polyols department at South Charleston. Reactor contents transferred to tank 643 vented into a plastic enclosure installed for asbestos insulation…

  9. Company document · Union Carbide documents · May 5, 1987

    R. S. Newberger and J. K. Kyle Memos on Asbestos Disposal and Ceiling Contamination at the Sistersville, WV Plant (1987)

    Two Union Carbide memoranda from the Sistersville, West Virginia plant. The first (May 5, 1987) reports that asbestos insulation was being stripped in the Silanes Department and that the burial location was full. The second (April…

  10. Company document · Union Carbide documents · September 2, 1987

    L. S. Magelssen and H. W. Wegert to J. F. Dodd et al. on Status of Contingency Items for Asbestos Insulation Removal Upgrade, South Charleston (1987)

    Two-page memorandum reporting that two contingency items attached to the May 19, 1987 health, safety and environmental endorsement of the South Charleston Asbestos Insulation Removal Upgrade-Phase I had been resolved. It discusses review of the…

  11. Company document · Union Carbide documents · June 11, 1987

    M. J. Shoger to J. K. Corrie and Others on Asbestos Enclosures and HWP Requirements Meeting (1987)

    Internal Union Carbide memo announcing a June 19 meeting, sponsored by Chuck Rotthoff, with Institute, South Charleston and Sistersville personnel on plant practices for enclosures used in asbestos removal. It states there were two close calls…

  12. Company document · Union Carbide documents · November 29, 1984

    C. A. Gorrell to Maintenance First Line Supervisors on Mandatory Asbestos Hazard Training, with Sistersville Plant Asbestos Script, Slides and MSA Respirator Statement (1984)

    A November 29, 1984 memo from C. A. Gorrell told maintenance first-line supervisors that an asbestos hazards program was mandatory and had to be presented to their work groups before January 1, 1985. The exhibit also holds typed and handwritten…

  13. Company document · Union Carbide documents · February 11, 1987

    W. J. Vincent to J. K. Corrie Transmitting Responses to Asbestos Abatement and Removal Questions, South Charleston Plant (1987)

    Internal Union Carbide memo from W. J. Vincent to J. K. Corrie forwarding answers to questions raised at a recent meeting on asbestos abatement and removal. The attached "Asbestos Management" Q&A covers negative pressure enclosures…

  14. Company document · Union Carbide documents · July 7, 1987

    J. K. Corrie to H. W. Wegert and G. M. Whipple on Environmental Concerns in the South Charleston Insulation Upgrade Project, with Revised Asbestos Handling Procedure (1987)

    Internal correspondence from J. K. Corrie transmitting the revised South Charleston Plant Maintenance Safety Procedure XVIII on asbestos handling. The memo says the revision addresses concerns raised in an October 30, 1986 review of the plant's…

  15. Company document · Union Carbide documents · July 24, 1986

    E. L. Doerflein to L. E. Calvert Transmitting Sistersville Plant Asbestos Handling Procedure and Insulation Philosophy (1986)

    Cover memo from E. L. Doerflein to L. E. Calvert forwarding the Sistersville Plant's asbestos handling procedure and insulation philosophy for a group developing a recommended C&P asbestos policy. It states that asbestos insulation purchases stopped…

  16. Company document · Union Carbide documents · February 5, 1986

    G. W. Wulfert to Department Heads and Maintenance Staff on Asbestos Insulation Philosophy at the Sistersville Plant (1986)

    A February 5, 1986 memo from the Sistersville Plant maintenance manager transmitting the plant's philosophies and guidelines for handling asbestos insulation. The attached two-page guideline says the plant would identify and seal asbestos insulation…

  17. Company document · Union Carbide documents · May 7, 1987

    G. W. Wulfert to F. E. Dailey and Others on Future Asbestos Disposal Sites at Sistersville (1987)

    Memorandum dated May 7, 1987 stating that the Sistersville plant's asbestos disposal landfill was nearing the end of its life and that a new plan was needed. It called a meeting on May 26, 1987 at 1 PM in Building 33 to develop that plan.…

  18. Company document · Union Carbide documents · October 30, 1986

    H. W. Wegert and G. M. Whipple to J. R. Dement et al. on Health, Safety, and Environmental Review of the South Charleston Insulation Upgrade Project (1986)

    Memorandum reporting a health, safety and environmental review of a three-year project to upgrade asbestos insulation at the South Charleston Plant. It recommended endorsement contingent on revising Maintenance Procedure XVIII to comply with the…

  19. Company document · Union Carbide documents · February 5, 1986

    G. W. Wulfert to Department Heads and Maintenance on Asbestos Insulation Philosophy at the Sistersville Plant (1986)

    A cover memo from the Sistersville Plant maintenance manager transmitting the plant's philosophies and guidelines for asbestos insulation, copied to D. G. Beddow, K. F. Carroll, L. W. Phair and W. V. Summers. The attachment says the plant would seal…

  20. Company document · Union Carbide documents · March 4, 1986

    D. H. Ott to J. R. Dement and S. Rossi on Tank Insulation in 1986, with Tank Insulation Needs Table (1986)

    A March 4, 1986 memo from D. H. Ott to J. R. Dement and S. Rossi about the 1986 budget for tank insulation and weatherproofing work in Polyols, noting two tanks were started in 1985 because of the need to remove damaged asbestos insulation. The…