No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

35 results for “Union Carbide Corporation”, page 1 of 2

  1. Company document · Union Carbide documents · December 1, 1986

    M. A. Patel to T. E. Hanning Transmitting Notes on Union Carbide Practice SH-256, Removal and Handling of Asbestos-Containing Insulation, with Hanning's Asbestos Update Memo (1986)

    Handwritten note dated 12-1-86 to T. E. Hanning with comments on SH-256 (UCC 011229) Union Carbide Central Engineering Recommended Practice SH-256, Removal and Handling Asbestos-Containing Insulation Material, September 1986, 6 pages…

  2. Company document · Union Carbide documents · 1987

    Union Carbide Asbestos Removal and Phase-Out Papers, Including T. E. Hanning Memo on Contractor Project Development Group (1987)

    …Chemicals and Plastics Business Group, use of asbestos-containing materials in the work place Grafoil seminar outline and cover sheet (Union Carbide Specialty Products Group, Cleveland) Grafoil flexible graphite newsletter on special gasketing techniques Distribution list…

  3. Company document · Union Carbide documents · May 1987

    Union Carbide Memos and Draft C&P Program on Phasing Out Asbestos-Containing Materials in Company Workplaces (1986-1987)

    Six pages of Union Carbide papers from 1986-1987 on asbestos in the company's own facilities. They include a 9/29/86 draft Chemicals and Plastics (C&P) program to phase out asbestos-containing materials…

  4. Company document · Union Carbide documents · June 30, 1987

    Union Carbide Industrial Hygiene Asbestos Monitoring Reports for Silanes, Polymers and Monomers Areas, Prepared by C. R. McMillan and T. L. Grittie (1987)

    Twelve pages of industrial hygiene monitoring and results reports dated June and July 1987, covering airborne asbestos sampling taken February to April 1987 around insulation removal, glove bag use and asbestos insulation in Silanes, Polymers and…

  5. Company document · Union Carbide documents · September 5, 1986

    T. E. Hanning to S. W. Clark and Others on Asbestos Update: Union Support for Proposed EPA Ban (1986)

    …marked 'For Your Information', reporting that labor unions were endorsing a proposed EPA asbestos ban and contending that OSHA's 0.2 fiber/cc limit gave insufficient worker protection. It also summarizes the proposed EPA rule…

  6. Company document · Union Carbide documents · April 7, 1987

    T. L. Grittie, Industrial Hygiene Results on Asbestos Monitoring During Deinsulation of R-2 Reactor, Silanes (1987)

    Industrial hygiene results dated April 7, 1987 for breathing-zone asbestos samples taken February 10, 1987 on insulators removing insulation from reactor R-2 in the Reactor Area of Silanes inside a negative pressure enclosure. The two samples…

  7. Company document · Union Carbide documents · July 22, 1986

    M. A. Patel Transmittal of T. E. Hanning Summary of OSHA's Amended Asbestos Standard (1986)

    Patel's July 22, 1986 internal correspondence forwarded a summary of OSHA's June 20, 1986 amendment to the asbestos standard (29 CFR 1910.1001), noting the permissible exposure limit was reduced from 2.0 to 0.2 f/cc with an action level of 0.1 f/cc.…

  8. Company document · Union Carbide documents · March 23, 1987

    T. E. Hanning to C. C. Neely Forwarding Asbestos Implementation Task Group Minutes and Standard Practice SH-256 (1987)

    …C. Neely, March 23, 1987, forwarding Asbestos Implementation Task Group March 17 meeting items Union Carbide Standard Practice SH-256 (December 1986), Removal and Handling of Asbestos-Containing Insulation Material: exposure limits, work practices, respirators, monitoring…

  9. Company document · Union Carbide documents · May 5, 1987

    R. S. Newberger and J. K. Kyle Memos on Asbestos Disposal and Ceiling Contamination at the Sistersville, WV Plant (1987)

    Two Union Carbide memoranda from the Sistersville, West Virginia plant. The first (May 5, 1987) reports that asbestos insulation was being stripped in the Silanes Department and that the burial location was full. The second (April…

  10. Company document · Union Carbide documents · November 29, 1984

    C. A. Gorrell to Maintenance First Line Supervisors on Mandatory Asbestos Hazard Training, with Sistersville Plant Asbestos Script, Slides and MSA Respirator Statement (1984)

    A November 29, 1984 memo from C. A. Gorrell told maintenance first-line supervisors that an asbestos hazards program was mandatory and had to be presented to their work groups before January 1, 1985. The exhibit also holds typed and handwritten…

  11. Company document · Union Carbide documents · October 28, 1986

    T. E. Hanning to Recipient on Review of South Charleston Plant Procedures for Removal and Disposal of Asbestos Materials (1986)

    Memorandum from T. E. Hanning reviewing updates to the South Charleston plant's 514 Maintenance Department procedure for handling and disposing of asbestos insulation, following the July 1986 OSHA revision. It sets out the revised exposure limit and…

  12. Company document · Union Carbide documents · March 23, 1987

    T. E. Hanning to C. C. Neely Forwarding Asbestos Implementation Task Group March 17 Meeting Items and Standard Practice SH-256 (1987)

    …Neely, March 23, 1987, on Asbestos Implementation Task Group March 17 meeting items Attached Union Carbide Standard Practice SH-256 (December 1986), Removal and Handling Asbestos-Containing Insulation Material: OSHA/EPA standards, work practices, protective equipment…

  13. Company document · Union Carbide documents · July 24, 1986

    E. L. Doerflein to L. E. Calvert Transmitting Sistersville Plant Asbestos Handling Procedure and Insulation Philosophy (1986)

    Cover memo from E. L. Doerflein to L. E. Calvert forwarding the Sistersville Plant's asbestos handling procedure and insulation philosophy for a group developing a recommended C&P asbestos policy. It states that asbestos insulation purchases stopped…

  14. Company document · Union Carbide documents · February 5, 1986

    G. W. Wulfert to Department Heads and Maintenance Staff on Asbestos Insulation Philosophy at the Sistersville Plant (1986)

    A February 5, 1986 memo from the Sistersville Plant maintenance manager transmitting the plant's philosophies and guidelines for handling asbestos insulation. The attached two-page guideline says the plant would identify and seal asbestos insulation…

  15. Company document · Union Carbide documents · May 7, 1987

    G. W. Wulfert to F. E. Dailey and Others on Future Asbestos Disposal Sites at Sistersville (1987)

    Memorandum dated May 7, 1987 stating that the Sistersville plant's asbestos disposal landfill was nearing the end of its life and that a new plan was needed. It called a meeting on May 26, 1987 at 1 PM in Building 33 to develop that plan.…

  16. Company document · Union Carbide documents · February 5, 1986

    G. W. Wulfert to Department Heads and Maintenance on Asbestos Insulation Philosophy at the Sistersville Plant (1986)

    A cover memo from the Sistersville Plant maintenance manager transmitting the plant's philosophies and guidelines for asbestos insulation, copied to D. G. Beddow, K. F. Carroll, L. W. Phair and W. V. Summers. The attachment says the plant would seal…

  17. Company document · Union Carbide documents · November 7, 1986

    D. A. Boggs to S. L. Curtis on Serious Asbestos Health Hazard in the Monomers North Rectification Area, Sistersville Plant (1986)

    Memo from the Sistersville Plant industrial hygienist reporting exposed, deteriorating asbestos insulation on distillation columns in the Monomers North Rectification Area and chunks of asbestos material found on the ground up to about 60 yards…

  18. Company document · Union Carbide documents · June 30, 1987

    Industrial Hygiene Results: Asbestos Exposure of UCC Design and Construction Insulators Using a Glove Bag, Polymers I Tank Farm (1987)

    Industrial hygiene report dated June 30, 1987, on personal air samples taken February 13, 1987 from two UCC Design and Construction insulators removing asbestos with a glove bag at the Polymers I tank farm. One sample (0.22 f/cc) exceeded the 0.2…

  19. Company document · Union Carbide documents · June 19, 1987

    T. E. Hanning to C. C. Neely on Encapsulation of Asbestos for the Asbestos Task Group (1987)

    Memo from T. E. Hanning to C. C. Neely, with copies to several colleagues, declining an invitation to the July 23 Asbestos Task Group meeting and supplying general information on asbestos abatement by removal, enclosure and encapsulation. It…

  20. Company document · Union Carbide documents · May 27, 1987

    G. W. Wulfert Minutes of the 'Future Asbestos Disposal Site(s)' Meeting, with Related Memos on the Sistersville Asbestos Landfill (1987)

    Union Carbide Sistersville, WV plant memos from May 1987 about the plant's asbestos landfill, which held asbestos insulation removed from plant equipment. The May 27 minutes record an estimate that the present landfill had about…