26 results for “Union Carbide Corporation”, page 1 of 2

  1. Company document · Union Carbide documents · 1987

    Union Carbide Asbestos Removal and Phase-Out Papers, Including T. E. Hanning Memo on Contractor Project Development Group (1987)

    …Chemicals and Plastics Business Group, use of asbestos-containing materials in the work place Grafoil seminar outline and cover sheet (Union Carbide Specialty Products Group, Cleveland) Grafoil flexible graphite newsletter on special gasketing techniques Distribution list…

  2. Company document · Union Carbide documents · May 1987

    Union Carbide Memos and Draft C&P Program on Phasing Out Asbestos-Containing Materials in Company Workplaces (1986-1987)

    Six pages of Union Carbide papers from 1986-1987 on asbestos in the company's own facilities. They include a 9/29/86 draft Chemicals and Plastics (C&P) program to phase out asbestos-containing materials…

  3. Company document · Union Carbide documents · September 12, 1986

    C. P. Maxwell to Browning, Collins, Graham, Keller, Mills, Noble and Rucker Transmitting M. A. Patel's OSHA Amended Asbestos Standard Training Slides (1986)

    A handwritten cover note dated September 12, 1986 from C. P. Maxwell forwards copies of overhead slides that Manhar Patel prepared and used in a training session for Services and Construction Department supervisors on the OSHA amended asbestos…

  4. Company document · Union Carbide documents · March 25, 1987

    J. K. Corrie to Maintenance Staff Transmitting Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)

    A March 25, 1987 cover memo from J. K. Corrie circulating a final review draft of Maintenance Safety Procedure XVIII, Asbestos Handling, for the South Charleston plant, with comments requested by April 3, 1987. The attached 20-page draft (dated…

  5. Company document · Union Carbide documents · June 11, 1987

    M. J. Shoger to J. K. Corrie and Others on Asbestos Enclosures and HWP Requirements Meeting (1987)

    Internal Union Carbide memo announcing a June 19 meeting, sponsored by Chuck Rotthoff, with Institute, South Charleston and Sistersville personnel on plant practices for enclosures used in asbestos removal. It states there were two close calls…

  6. Company document · Union Carbide documents · September 15, 1987

    H. E. Rucker, Asbestos Exposure Monitoring at the Institute Plant Pipe Insulation Removal (1987)

    Internal Union Carbide memo transmitting results of personal air monitoring during removal of asbestos insulation from about 180 feet of 6-inch product line in a trench at the Institute Plant. It reports that four of…

  7. Company document · Union Carbide documents · September 25, 1986

    W. J. Vincent to J. K. Corrie and Others on the New Asbestos Construction Standard (1986)

    A September 1986 memo from W. J. Vincent transmitting a summary of the new OSHA Asbestos Construction Industry Standard. The attached summary covers the 0.2 f/cc permissible exposure limit, the 0.1 f/cc action level, monitoring, respirators,…

  8. Company document · Union Carbide documents · February 11, 1987

    W. J. Vincent to J. K. Corrie Transmitting Responses to Asbestos Abatement and Removal Questions, South Charleston Plant (1987)

    Internal Union Carbide memo from W. J. Vincent to J. K. Corrie forwarding answers to questions raised at a recent meeting on asbestos abatement and removal. The attached "Asbestos Management" Q&A covers negative pressure enclosures…

  9. Company document · Union Carbide documents · March 11, 1988

    T. E. Hanning to Distribution on Need for Personal Protection When Cutting or Removing Asbestos-Containing Gaskets or Packing, with Attachments (1988)

    A March 1988 "Business Confidential" memo from T. E. Hanning for the Asbestos Phaseout Task Group asked plant locations about monitoring data, written procedures, wetting and glove-bag use, and the need for personal protection when cutting or…

  10. Company document · Union Carbide documents · November 12, 1987

    W. J. Vincent to W. R. White Jr. on Asbestos Air Sampling of Building 82 Floors (1987)

    Two industrial hygiene summary forms dated 11/12/87 report asbestos air sampling on 10/02/87 at five floors of building 327000 Bldg 82. Each of the five 250-minute area samples is listed as in compliance, with concentrations from 0.0005 to 0.004…

  11. Company document · Union Carbide documents · September 28, 1987

    H. E. Rucker on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1987)

    Internal Union Carbide memo reporting the results of asbestos exposure monitoring on insulators who removed asbestos from steam and product lines in a pit and trench at building 25 near the #2 dock at the Institute…

  12. Company document · Union Carbide documents · September 18, 1987

    Industrial Hygiene (EM&TS - HS&EA) to H. E. Rucker on Asbestos Exposure Monitoring During Pumphouse Pipe Stripping (1987)

    Internal Union Carbide memo transmitting results of asbestos air monitoring done during removal of asbestos insulation from about 310 feet of pipe at the #1 Pumphouse and about 50 square feet from a reactor at Building…

  13. Company document · Union Carbide documents · February 24, 1987

    W. J. Vincent to All Department Heads on Labelling of Asbestos Materials, with Standard Practice SH-256 on Removal and Handling of Asbestos-Containing Insulation (1987)

    A February 1987 internal memo from the South Charleston Plant Safety and Health Department told department heads that asbestos warning labels were now required on installed asbestos products whenever feasible and gave the supplier and cost. Attached…

  14. Company document · Union Carbide documents · July 8, 1987

    W. J. Vincent Industrial Hygiene Summary of Asbestos Air Sampling in Pipe Chases, Building 82, for W. K. White (1987)

    Five-page set of industrial hygiene records for an asbestos air-sampling survey on 06/22/87 in the pipe chases of Building 82 (plant location 327000). It has a handwritten field data sheet, two summary forms dated 07/08/87 from W. J. Vincent, and…

  15. Company document · Union Carbide documents · February 11, 1987

    W. J. Vincent to J. K. Corrie Transmitting Responses to Asbestos Abatement Questions, South Charleston Plant (1987)

    Internal Union Carbide memo from W. J. Vincent to J. K. Corrie, stamped received by the Maintenance Department on Feb. 17, 1987, forwarding answers to questions on asbestos raised at a recent meeting on asbestos abatement…

  16. Company document · Union Carbide documents · March 7, 1986

    W. J. Vincent to C. Priestley, Industrial Hygiene Survey Report on Asbestos Sampling at the South Charleston Plant (1986)

    A one-page Industrial Hygiene Survey Report form for the South Charleston Plant, with a survey date of February 13, 1986 and asbestos as the contaminant. It lists two area samples, near the N.W. exit and near the N.E. exit, each taken over 405…

  17. Company document · Union Carbide documents · October 3, 1986

    W. J. Vincent to C. H. Hancock on Equipment Needs for Asbestos Monitoring (1986)

    Memo from W. J. Vincent to C. H. Hancock reviewing the Industrial Hygiene Group's needs under the new asbestos standards (1910.1001 and 1926). It states that technicians counting fibers by the NIOSH 7400 method must be trained and certified, that…

  18. Company document · Union Carbide documents · July 23, 1987

    Industrial Hygiene to H. E. Rucker on Asbestos Exposure Monitoring During Pipe Insulation Removal at the Institute Plant (1987)

    Internal Union Carbide memo reporting asbestos air monitoring on insulators who stripped about 195 feet of 3-inch steam line at the Institute Plant tank farm. It states that all personal samples were below the 0…

  19. Company document · Union Carbide documents · February 18, 1987

    W. J. Vincent to J. K. Corrie Transmitting Revised Asbestos Maintenance Procedure, South Charleston Plant (1987)

    A one-page internal memo from W. J. Vincent to J. K. Corrie transmitting a revised Asbestos Maintenance Procedure for the South Charleston Plant, revised to comply with the new asbestos construction standard. The attached 18-page draft, 'Provisions…

  20. Company document · Union Carbide documents · January 9, 1987

    C. R. Rotthoff to W. J. Vincent on South Charleston Provisions for Asbestos Material Removal and Disposal (1987)

    Internal correspondence in which C. R. Rotthoff commented on W. J. Vincent's South Charleston asbestos removal document, saying it assumed no technology exists to keep asbestos below the PEL. He suggested identifying which steps are mandatory…