28 results for “Union Carbide Corporation”, page 1 of 2
-
Company document · Union Carbide documents
Union Carbide Institute Plant Asbestos Monitoring Memos: Tank 4621 Demolition (H. H. Frazier, 1978) and Powerhouse Insulation Removal (W. F. Blythe, Jr., 1977)
Two Union Carbide internal memos with a data table, reporting asbestos air monitoring at the Institute, West Virginia plant. The July 21, 1978 memo gives fiber counts from the removal of asbestos-containing Kaylo insulation from…
-
Company document · Union Carbide documents · July 21, 1978
Union Carbide Institute Plant Asbestos Air Monitoring Memos: H. H. Frazier to D. D. Miller (1978) and W. F. Blythe, Jr. to A. S. Howard and Others (1977), with Sample Data Sheet
Two Union Carbide internal memos from the Institute, West Virginia plant report airborne asbestos fiber counts taken during insulation removal work, followed by a one-page table of the August 1977 sample results. The July 1978…
-
Company document · Union Carbide documents · August 25, 1977
W. F. Blythe, Jr. to D. R. Paugh and Others on Asbestos Air Monitoring at the South Charleston Plant (1977)
Internal Union Carbide memo reporting air sampling done on August 8, 1977 during removal of wet insulation, possibly containing asbestos, from a furnace at the South Charleston mainland powerhouse. It states that the results complied with…
-
Company document · Union Carbide documents · July 16, 1982
Manhar A. Patel to J. C. Smith on Dust and MEK Monitoring in the Sandblast Shed, 511 Construction Institute Plant (1982)
Internal Union Carbide letter reporting dust sampling for 'Black Beauty' in the Sandblast Shed and methyl ethyl ketone (MEK) sampling in the Paint Preparation Shed at the 511 Construction Institute Plant, May-June 1982. It says…
-
Company document · Union Carbide documents · August 25, 1977
W. F. Blythe, Jr. to A. S. Howard and Others on Asbestos Air Sampling During Insulation Removal at Institute Powerhouse (1977)
Internal memo reporting air samples taken August 15, 1977 during removal of possibly asbestos-containing insulation at the Institute, West Virginia powerhouse. It reports personal sample concentrations of 2.59 and 2.61 fibers/cc and an area sample…
-
Company document · Union Carbide documents · July 25, 1980
H. H. Frazier to G. F. Hurley on Asbestos Exposure Potential at the No. 1 Steam Plant Precipitators, Institute Plant (1980)
Internal memo reporting air sampling for asbestos on July 21, 1980 around asbestos-containing insulation on the No. 1 Steam Plant precipitators during the boiler retubing project at the Institute plant. It lists personal and area sample results,…
-
Company document · Union Carbide documents · July 9, 1976
H. H. Frazier to P. H. Day on Employee Exposure to Asbestos in Plant Stores Building 330 (1976)
Memo reporting area and personal air samples for asbestos fibers taken on June 7 and June 16, 1976 at asbestos rope and gasket storage bins in Plant Stores Building 330, after questions from Plant Stores employees. Counts ranged from 0.0 to 1.0…
-
Company document · Union Carbide documents · July 25, 1980
H. H. Frazier to G. F. Hurley on Asbestos Exposure Potential at the Precipitators, No. 1 Steam Plant, Institute Plant (1980)
Internal correspondence from Industrial Hygiene reporting airborne asbestos sampling on July 21, 1980 at the No. 1 Steam Plant precipitators, where protective cover over asbestos-containing insulation had been torn off by a storm. It lists personal…
-
Company document · Union Carbide documents · August 2, 1977
S. D. Herzog to D. R. Paugh and B. H. Thomas on Compliance with EPA Asbestos Regulation, with Enclosed Federal Register Asbestos Standard Amendments (1977)
A cover letter from S. D. Herzog of Chemicals and Plastics (South Charleston, WV) forwarding guidance on complying with the EPA hazardous air pollutants regulation (40 CFR 61) for removal and disposal of asbestos-containing insulation and…
-
Company document · Union Carbide documents · August 25, 1977
W. F. Blythe, Jr. to A. S. Howard and Others on Asbestos Monitoring at the Institute Powerhouse (1977)
Internal memo reporting air sampling on August 15, 1977 during removal of insulation possibly containing asbestos at the Institute, West Virginia powerhouse. It reports two personal samples (2.59 and 2.61 fibers/cc) and one area sample (0.48…
-
Company document · Union Carbide documents · October 20, 1981
M. A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Gasket Shop, Institute Plant (1981)
Internal memo reporting area and personal asbestos exposure monitoring in the Gasket Shop (laundry, Building 3 of the Construction Department) at the Institute Plant, done by the plant's industrial hygiene group on October 2 and 9, 1981. It states…
-
Company document · Union Carbide documents · January 24, 1973
H. H. Frazier to Fred Williams on Asbestos Sampling Values in the Plant 511 Insulation Fabrication Shop (1973)
Internal correspondence from the Employee Relations Hygiene/Safety department at the Institute Plant, forwarding asbestos fiber counts from 15 personal samples taken in 1972 at the Plant 511 Insulation Fabrication Shop. The tasks sampled involved…
-
Company document · Union Carbide documents · October 23, 1981
M. A. Patel to W. L. Browning, J. W. Perry Jr. and Others on Asbestos Monitoring in the Gasket Shop, 512 Construction, Institute Plant, with Replacement Letter and Data Sheet (1981)
Internal Union Carbide correspondence from Manhar A. Patel. A cover note says an October 20, 1981 letter on asbestos monitoring in the Institute Plant gasket shop contained an error and should be replaced. The replacement letter…
-
Company document · Union Carbide documents · November 16, 1979
Ruth Clise to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse, South Charleston (1979)
Internal industrial hygiene report on a survey of October 26, 1979, measuring construction workers' exposure to asbestos fibers while insulation was stripped from an exhaust duct in the Building 704 Powerhouse. It reports that the dust was too heavy…
-
Company document · Union Carbide documents · April 6, 1976
H. H. Frazier to J. F. Ballew, Jr. on Airborne Asbestos Fiber Counts During Preparation of Residue Analysis Sample Dishes, Institute Plant (1976)
Memo from H. H. Frazier of Industrial Hygiene to J. F. Ballew, Jr. reporting three fiber-count samplings of employees preparing sample dishes with asbestos fibers in Analytical Laboratory Room 108, with results of 4.9, 47.6 and 7.7 fibers/ml. It…
-
Company document · Union Carbide documents · August 25, 1977
W. F. Blythe, Jr. to A. S. Howard and Others on Asbestos Monitoring at Institute Powerhouse (1977)
Internal memo reporting air sampling on August 15, 1977 during removal of possibly asbestos-containing insulation at the Institute, West Virginia powerhouse. It reports personal sample results of 2.59 and 2.61 fibers/cc and an area sample of 0.48…
-
Company document · Union Carbide documents · March 15, 1979
H. H. Frazier to Peter Barna on Use of AMATEX Asbestos Tape in Plant 512 (1979)
Memo from H. H. Frazier to Peter Barna on three brands of insulating tape used at the Institute Plant. It reports that AMATEX tape contained raw asbestos fibers including dust, cites measurements of 0.03 to 1.9 fibers per cc at the Technical Center,…
-
Company document · Union Carbide documents · December 19, 1979
G. F. Hurley to C. W. Carman and Others on an Informational Slide Program on Asbestos (1979)
Internal Union Carbide memo from the Technical Center industrial hygienist announcing a 20-minute slide presentation with taped commentary on asbestos toxicity and safe handling. It says the Industrial Hygiene group revised a Johns-Manville presentation…
-
Company document · Union Carbide documents · August 2, 1977
S. D. Herzog to D. R. Paugh and B. H. Thomas Forwarding R. A. Huber's Guidance on Compliance with the EPA Asbestos Regulation (1977)
A Union Carbide Chemicals and Plastics cover memo (Aug. 2, 1977) forwards an outline from R. A. Huber on complying with the EPA asbestos regulation, 40 CFR 61, for removal and disposal of asbestos-containing insulation…
-
Company document · Union Carbide documents · July 9, 1976
H. H. Frazier to P. H. Day on Employee Exposure to Asbestos in Plant Stores, Building 330 (1976)
Memo reporting area and personal air samples for asbestos taken in June 1976 in Plant Stores Building 330, where asbestos rope and metal-reinforced gaskets were stored and dispensed. It states that the results were within the new TLV of two fibers…