4 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · June 22, 1987
Mildred Hightower to R. M. Arnold and Others on Pre-Walk-Thru Questionnaires for Bldg. 187, Phenolic Resins and #32 Boiler (1987)
Internal Union Carbide memo dated June 22, 1987, from the Investment Recovery Coordinator to eight recipients. It transmitted pre-walk-thru questionnaires for Building 187, the Phenolic Resins unit and the #32 Boiler, and scheduled a…
-
Company document · Union Carbide documents · June 24, 1987
Kirk E. Martin to R. M. Arnold and M. Hightower on Pre-Demolition Walk-thru of the Phenolic Resins Unit, Texas City (1987)
Memo reporting industrial hygiene concerns identified from a questionnaire and walk-through inspection before demolition of the Phenolic Resins Unit at Texas City. It notes asbestos insulation on lines and vessels, states the company policy on…
-
Company document · Union Carbide documents · November 7, 1986
Asbestos Standards Committee to M. E. Durdin et al. on OSHA's Final Asbestos Standards and Maintenance Procedure D-12, Texas City (1986)
Internal Texas City memo transmitting a committee study of OSHA's final asbestos standards (29 CFR 1910.1001 and 1926.58) and their impact on the Maintenance Department. Attachments cover training requirements, protective equipment with cost…
-
Company document · Union Carbide documents · November 4, 1986
OSHA Asbestos Standard Implementation Committee to M. D. Lindsey, Texas City Plant (1986)
Internal correspondence from a Texas City Plant committee to M. D. Lindsey listing concerns found while reviewing the revised OSHA asbestos standard and its impact on the plant. It raised the removal/renovation of asbestos-containing insulation,…