No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

61 results for “Union Carbide Corporation”, page 1 of 4

  1. Company document · Union Carbide documents · July 3, 1986

    R. C. Ellis to S. W. Clark and Others Transmitting Draft Paper on Reassessing Union Carbide's Position on Asbestos Gaskets and Packing (1986)

    A July 3, 1986 cover memo from R. C. Ellis circulating a draft 'Asbestos Paper' for comment, followed by the draft on asbestos gaskets and packings. The draft reviews past practice, the trend toward substitutes, cost comparisons with GRAFOIL,…

  2. Company document · Union Carbide documents · September 5, 1986

    T. E. Hanning to S. W. Clark and Others on Asbestos Update: Union Support for Proposed EPA Ban (1986)

    …marked 'For Your Information', reporting that labor unions were endorsing a proposed EPA asbestos ban and contending that OSHA's 0.2 fiber/cc limit gave insufficient worker protection. It also summarizes the proposed EPA rule…

  3. Company document · Union Carbide documents · October 3, 1979

    Ron Ritchie to J. B. Leverton and R. J. Taylor Forwarding OSHA Jobsite Information Survey Correspondence (1979)

    Cover memo from Ron Ritchie passing along correspondence about OSHA Jobsite Information Surveys, with an Employee Relations memo from R. V. Welty (Oct. 1, 1979) and a Sept. 21, 1979 letter from Law Department attorney John W. Whittlesey to J. B.…

  4. Company document · Union Carbide documents · March 2, 1987

    C. C. Neely to L. E. Calvert and Task Group Members on Phaseout of Asbestos-Containing Materials in Chemicals and Plastics Group Work Places, with Attachments (1987)

    A March 2, 1987 Union Carbide Central Engineering memo from C. C. Neely announced that the Chemicals and Plastics Group's program to phase out asbestos-containing materials in its work places had been endorsed. It…

  5. Company document · Union Carbide documents · January 9, 1987

    J. B. Leverton to Eli Bell, Texas Air Control Board, on Asbestos Insulation Removal at Texas City Marine Terminal (1987)

    Letter notifying the Texas Air Control Board, under 40 CFR 61.146, of planned renovation to remove insulation from steam service headers at the Texas City marine terminal. It gives the amount (about 584 feet), the scheduled dates (January 22 to…

  6. Company document · Union Carbide documents · August 14, 1985

    J. B. Leverton to Texas Air Control Board on Asbestos Insulation Removal from Fluid Bed Dryer at Texas City Plant (1985)

    Letter to the Texas Air Control Board giving notice, under 40 CFR 61.146, of planned removal of about 400 square feet of insulation from the fluid bed dryer at Bldg. 121 of the Texas City plant. It gives the schedule (after August 26, 1985, to be…

  7. Company document · Union Carbide documents · July 22, 1980

    A. P. Yalcinkaya to L. A. Smith and D. B. Whittington Posting OSHA Notice of Trial, Docket 80-1943, Texas City Ethanol Unit (1980)

    …July 22, 1980, asking that the Notice of Trial be posted at the Ethanol Unit OSHRC Notice of Trial, Secretary of Labor v. Union Carbide Corporation, Docket 80-1943, signed by Judge Erwin L. Stuller, dated…

  8. Company document · Union Carbide documents · March 23, 1987

    T. E. Hanning to C. C. Neely Forwarding Asbestos Implementation Task Group Minutes and Standard Practice SH-256 (1987)

    …C. Neely, March 23, 1987, forwarding Asbestos Implementation Task Group March 17 meeting items Union Carbide Standard Practice SH-256 (December 1986), Removal and Handling of Asbestos-Containing Insulation Material: exposure limits, work practices, respirators, monitoring…

  9. Company document · Union Carbide documents · January 26, 1987

    Kirk E. Martin to A. L. Welch on Asbestos Exposure Monitoring at Texas City, with Attached OSHA Appendix A and Related Correspondence (1987)

    …1987 memo in which Kirk E. Martin responded to a contractor's complaint that Union Carbide's Texas City laboratory air-sample results for asbestos were inaccurate, stating the results stood and citing the OSHA counting…

  10. Company document · Union Carbide documents · July 23, 1985

    J. B. Leverton to Texas Air Control Board on Renovation Notification for Asbestos Insulation Removal at Texas City Plant (1985)

    …under 40 CFR 61.146, of Union Carbide's plan to remove about 1800 square feet of asbestos insulation from steam lines and valves in Building 180 at its Texas City plant. Removal was scheduled from…

  11. Company document · Union Carbide documents · October 16, 1986

    J. E. Sanders to L. E. Calvert, S. W. Clark, G. B. Elder and R. W. Engle Transmitting the Recommended C&P Program to Phase Out Asbestos-Containing Materials in the Workplace, with C. C. Neely's Cover Memo and Draft Policy (1986)

    Sanders' October 16, 1986 internal cover letter forwards to his team the recommendation on asbestos usage that he sent to Bob Perry. Attached are C. C. Neely's September 30, 1986 memo on the final draft of the Chemicals and Plastics Group program,…

  12. Company document · Union Carbide documents · October 16, 1986

    J. E. Sanders to L. E. Calvert, S. W. Clark, G. B. Elder and R. W. Engle on Recommended C&P Program to Phase Out Asbestos-Containing Materials in the Workplace (1986)

    A one-page internal cover memo in which J. E. Sanders told four recipients that he had sent their recommendation on asbestos usage to Bob Perry. He thanked them for their work and said he would keep them posted as the recommendation moved through…

  13. Company document · Union Carbide documents · September 30, 1986

    C. C. Neely to J. E. Sanders Transmitting Final Draft of C&P Program to Phase Out Asbestos-Containing Materials in the Work Place, with Attachments (1986)

    Memo from C. C. Neely transmitting, for the Special Working Group, a final draft Chemicals and Plastics Group policy to phase out asbestos-containing materials in plant work places, with a January 1, 1989 purchase cut-off. It reports concerns raised…

  14. Company document · Union Carbide documents · November 9, 1979

    J. B. Leverton to F. S. Provenzano Transmitting the Texas City Plant Asbestos Standard Compliance Audit (1979)

    Cover letter dated November 9, 1979 from J. B. Leverton to F. S. Provenzano, with copies to plant and corporate staff, attaching an audit of Texas City Plant compliance with the OSHA asbestos standard (29 CFR 1910.1001). Leverton concurred with the…

  15. Company document · Union Carbide documents · January 12, 1987

    J. B. Leverton to Eli Bell, Texas Air Control Board, Renovation Notification for Asbestos Insulation Removal at Texas City (1987)

    …Board, under 40 CFR 61.146, that Union Carbide planned to remove asbestos insulation from the 1st and 2nd effect columns at building 94 of its Texas City plant. It gave about 238 square feet, a…

  16. Company document · Union Carbide documents · March 23, 1987

    T. E. Hanning to C. C. Neely Forwarding Asbestos Implementation Task Group March 17 Meeting Items and Standard Practice SH-256 (1987)

    …Neely, March 23, 1987, on Asbestos Implementation Task Group March 17 meeting items Attached Union Carbide Standard Practice SH-256 (December 1986), Removal and Handling Asbestos-Containing Insulation Material: OSHA/EPA standards, work practices, protective equipment…

  17. Company document · Union Carbide documents · September 19, 1977

    T. J. Covin to J. P. Alexander and Others on Compliance with the EPA Asbestos Regulation (1977)

    Internal correspondence from T. J. Covin of the Taft EP Dept. to plant recipients about the EPA National Emission Standard for Asbestos (40 CFR 61), which requires EPA notification of removal of asbestos-containing insulation or fireproofing above…

  18. Company document · Union Carbide documents · February 26, 1987

    J. B. Leverton to Eli Bell, Texas Air Control Board, Notifying of Asbestos Steam Line Insulation Removal at Texas City Plant (1987)

    …under 40 CFR 61.146, that Union Carbide planned to remove asbestos insulation from 520 linear feet of 3-inch steam line north of building 56 at the Texas City plant, from March 23 to June…

  19. Company document · Union Carbide documents · August 13, 1985

    S. J. Footer to F. S. Provenzano on the Texas City Plant Insulation Repair Program (1985)

    Internal memo of August 13, 1985 recommending that the Texas City plant insulation repair project be split into operating facilities and facilities shut down for future demolition, with repair completion targets of one to three years depending on…

  20. Company document · Union Carbide documents · December 12, 1985

    J. B. Leverton to Bill Stewart, Texas Air Control Board, on Asbestos Insulation Removal Notification at Texas City Plant (1985)

    Two letters from J. B. Leverton of Union Carbide's Texas City Industrial Hygiene department to the Texas Air Control Board under 40 CFR 61.146. The December 5, 1985 letter gave notice of planned removal…