No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

33 results for “Union Carbide Corporation”, page 1 of 2

  1. Company document · Union Carbide documents · September 24, 1987

    Union Carbide Petrochemical Divisions Safety and Health Information Manual No. 46, Assigned to J. R. Dement, with Internal Exposure Standards List (1987)

    …September 24, 1987, restricted for internal use only Union Carbide Internal Exposure Standards List (pages 1-18 of the list, alternating with pages of notes of explanation and definitions), including the asbestos entry on page 3…

  2. Company document · Union Carbide documents · 1987

    Union Carbide Asbestos Removal and Phase-Out Papers, Including T. E. Hanning Memo on Contractor Project Development Group (1987)

    …Chemicals and Plastics Business Group, use of asbestos-containing materials in the work place Grafoil seminar outline and cover sheet (Union Carbide Specialty Products Group, Cleveland) Grafoil flexible graphite newsletter on special gasketing techniques Distribution list…

  3. Company document · Union Carbide documents · May 1987

    Union Carbide Memos and Draft C&P Program on Phasing Out Asbestos-Containing Materials in Company Workplaces (1986-1987)

    Six pages of Union Carbide papers from 1986-1987 on asbestos in the company's own facilities. They include a 9/29/86 draft Chemicals and Plastics (C&P) program to phase out asbestos-containing materials…

  4. Company document · Union Carbide documents · May 27, 1987

    L. E. Calvert Wang-to-Wang Safety Alert on Inadequate Atmospheres in Asbestos Work Enclosures, with J. A. Amos R&D Memo on Asbestos Removal Guidelines (1987)

    …Wang" safety alert from Larry E. Calvert says two Union Carbide locations had incidents with potential personnel exposure to inadequate atmospheres in enclosures built for work on asbestos-containing materials. It asks locations to make sure…

  5. Company document · Union Carbide documents · August 8, 1986

    L. E. Calvert Transmitting Draft Recommended Policy on Use of Asbestos in the Workplace, with C. C. Neely Memo and C&P Draft Policy (1986)

    Cover letter from Larry E. Calvert (Houston) sending a draft asbestos policy to a distribution list, noting that the permissible exposure level fell from 2.0 to 0.2 fibers/cc (8-hour TWA) on July 21, 1986. Attached are a distribution list, an August…

  6. Company document · Union Carbide documents · August 18, 1986

    Larry E. Calvert to C. C. Neely on Asbestos vs. Non-Asbestos Gasketing and Packing Costs (1986)

    A 1986 memo titled "Asbestos vs Non-Asbestos" comparing the cost of asbestos gasketing and packing with non-asbestos materials (including Grafoil). It calculates breakeven labor times that account for wetting, bagging and landfill disposal of…

  7. Company document · Union Carbide documents

    Handwritten Asbestos Abatement Project Meeting Notes and J. R. Dement Note to J. C. Wandell on Maintenance Procedure

    Page 1 is an unsigned handwritten set of notes headed 'Asb Abatement Project Mtg', listing agenda items and five steps for an asbestos insulation project, including pre-approval of funds and allocation factors. Page 2 is a handwritten note from J.…

  8. Company document · Union Carbide documents · June 2, 1987

    G. B. Elder to MOC Transmitting L. E. Calvert's Safety Alert on Enclosures Built for Work on Asbestos-Containing Materials (1987)

    A June 2, 1987 memorandum from G. B. Elder forwarding a Safety Alert from Larry Calvert about possible personnel exposure to inadequate atmospheres in enclosures built for work on asbestos-containing materials. The attached May 27, 1987 alert from…

  9. Company document · Union Carbide documents · March 25, 1987

    J. K. Corrie to Maintenance Staff Transmitting Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)

    A March 25, 1987 cover memo from J. K. Corrie circulating a final review draft of Maintenance Safety Procedure XVIII, Asbestos Handling, for the South Charleston plant, with comments requested by April 3, 1987. The attached 20-page draft (dated…

  10. Company document · Union Carbide documents · May 21, 1987

    South Charleston Plant Accident/Incident Report and Review Board Analysis on Vapor Release Under Plastic Enclosure at Tanks 643-644 During Asbestos Insulation Removal (1987)

    Accident/incident report and informal Review Board analysis of a May 21, 1987 near-miss in the Polyols department at South Charleston. Reactor contents transferred to tank 643 vented into a plastic enclosure installed for asbestos insulation…

  11. Company document · Union Carbide documents · September 2, 1987

    L. S. Magelssen and H. W. Wegert to J. F. Dodd et al. on Status of Contingency Items for Asbestos Insulation Removal Upgrade, South Charleston (1987)

    Two-page memorandum reporting that two contingency items attached to the May 19, 1987 health, safety and environmental endorsement of the South Charleston Asbestos Insulation Removal Upgrade-Phase I had been resolved. It discusses review of the…

  12. Company document · Union Carbide documents · June 11, 1987

    M. J. Shoger to J. K. Corrie and Others on Asbestos Enclosures and HWP Requirements Meeting (1987)

    Internal Union Carbide memo announcing a June 19 meeting, sponsored by Chuck Rotthoff, with Institute, South Charleston and Sistersville personnel on plant practices for enclosures used in asbestos removal. It states there were two close calls…

  13. Company document · Union Carbide documents · February 11, 1987

    W. J. Vincent to J. K. Corrie Transmitting Responses to Asbestos Abatement and Removal Questions, South Charleston Plant (1987)

    Internal Union Carbide memo from W. J. Vincent to J. K. Corrie forwarding answers to questions raised at a recent meeting on asbestos abatement and removal. The attached "Asbestos Management" Q&A covers negative pressure enclosures…

  14. Company document · Union Carbide documents · July 7, 1987

    J. K. Corrie to H. W. Wegert and G. M. Whipple on Environmental Concerns in the South Charleston Insulation Upgrade Project, with Revised Asbestos Handling Procedure (1987)

    Internal correspondence from J. K. Corrie transmitting the revised South Charleston Plant Maintenance Safety Procedure XVIII on asbestos handling. The memo says the revision addresses concerns raised in an October 30, 1986 review of the plant's…

  15. Company document · Union Carbide documents · October 30, 1986

    H. W. Wegert and G. M. Whipple to J. R. Dement et al. on Health, Safety, and Environmental Review of the South Charleston Insulation Upgrade Project (1986)

    Memorandum reporting a health, safety and environmental review of a three-year project to upgrade asbestos insulation at the South Charleston Plant. It recommended endorsement contingent on revising Maintenance Procedure XVIII to comply with the…

  16. Company document · Union Carbide documents · March 4, 1986

    D. H. Ott to J. R. Dement and S. Rossi on Tank Insulation in 1986, with Tank Insulation Needs Table (1986)

    A March 4, 1986 memo from D. H. Ott to J. R. Dement and S. Rossi about the 1986 budget for tank insulation and weatherproofing work in Polyols, noting two tanks were started in 1985 because of the need to remove damaged asbestos insulation. The…

  17. Company document · Union Carbide documents · July 6, 1987

    Memo to J. R. Soice on Alternate Asbestos Disposal Site Bids, South Charleston Plant (1987)

    Internal memo summarizing responses to solicitations of bids from seven companies for asbestos disposal. It lists the Browning-Ferris (Marietta, Ohio), E.R.O. Landfill and Don's Disposal (Craigs Branch Landfill) sites, with prices and permit status,…

  18. Company document · Union Carbide documents · February 11, 1987

    W. J. Vincent to J. K. Corrie Transmitting Responses to Asbestos Abatement Questions, South Charleston Plant (1987)

    Internal Union Carbide memo from W. J. Vincent to J. K. Corrie, stamped received by the Maintenance Department on Feb. 17, 1987, forwarding answers to questions on asbestos raised at a recent meeting on asbestos abatement…

  19. Company document · Union Carbide documents · May 6, 1987

    D. H. Hanshew to J. R. Dement on Environmental Concerns about the South Charleston Plant Insulation Upgrade Project and Asbestos Handling Procedure (1987)

    Memo responding to a 10-30-86 memo from H. W. Wegert and G. M. Whipple about the Health, Safety, and Environmental Review of the South Charleston insulation upgrade project. It addresses three concerns about notification, disposal container labels…

  20. Company document · Union Carbide documents · May 19, 1987

    L. S. Magelssen and H. W. Wegert to J. R. Dement and Others on Health, Safety and Environmental Review of the South Charleston Asbestos Insulation Removal Upgrade, Phase I (1987)

    A May 19, 1987 memo recommending endorsement of Phase I of a project to remove and upgrade asbestos insulation at the South Charleston plant. The endorsement is contingent on revising Maintenance Procedure XVIII to comply with OSHA 29 CFR 1926.58…