37 results for “Union Carbide Corporation”, page 1 of 2

  1. Company document · Union Carbide documents · 1987

    Union Carbide Asbestos Removal and Phase-Out Papers, Including T. E. Hanning Memo on Contractor Project Development Group (1987)

    …Chemicals and Plastics Business Group, use of asbestos-containing materials in the work place Grafoil seminar outline and cover sheet (Union Carbide Specialty Products Group, Cleveland) Grafoil flexible graphite newsletter on special gasketing techniques Distribution list…

  2. Company document · Union Carbide documents · April 6, 1987

    T. L. Grittie's Industrial Hygiene Results on Asbestos Air Monitoring at Union Carbide Plant Operations (1987)

    Eight one-page "Industrial Hygiene Results" reports dated April 6-7, 1987. Each reports airborne asbestos fiber sampling taken in January and February 1987 during plant tasks, including K-40 operator duties, pipe, reactor and heater de-insulation,…

  3. Company document · Union Carbide documents · May 1987

    Union Carbide Memos and Draft C&P Program on Phasing Out Asbestos-Containing Materials in Company Workplaces (1986-1987)

    Six pages of Union Carbide papers from 1986-1987 on asbestos in the company's own facilities. They include a 9/29/86 draft Chemicals and Plastics (C&P) program to phase out asbestos-containing materials…

  4. Company document · Union Carbide documents · June 30, 1987

    Union Carbide Industrial Hygiene Asbestos Monitoring Reports for Silanes, Polymers and Monomers Areas, Prepared by C. R. McMillan and T. L. Grittie (1987)

    Twelve pages of industrial hygiene monitoring and results reports dated June and July 1987, covering airborne asbestos sampling taken February to April 1987 around insulation removal, glove bag use and asbestos insulation in Silanes, Polymers and…

  5. Company document · Union Carbide documents · April 7, 1987

    T. L. Grittie, Industrial Hygiene Results on Asbestos Monitoring During Deinsulation of R-2 Reactor, Silanes (1987)

    Industrial hygiene results dated April 7, 1987 for breathing-zone asbestos samples taken February 10, 1987 on insulators removing insulation from reactor R-2 in the Reactor Area of Silanes inside a negative pressure enclosure. The two samples…

  6. Company document · Union Carbide documents · September 15, 1987

    H. E. Rucker, Asbestos Exposure Monitoring at the Institute Plant Pipe Insulation Removal (1987)

    Internal Union Carbide memo transmitting results of personal air monitoring during removal of asbestos insulation from about 180 feet of 6-inch product line in a trench at the Institute Plant. It reports that four of…

  7. Company document · Union Carbide documents · October 6, 1986

    V. E. Stover and M. A. Patel to J. M. Harbert and Others on Asbestos Exposure Monitoring at South Charleston Building 309 (1986)

    Internal Union Carbide memo transmitting results of asbestos exposure monitoring of two employees on September 9, 1986 at the South Charleston plant's Building 309, while they stripped and bagged asbestos from a 1 inch line…

  8. Company document · Union Carbide documents · June 20, 1984

    M. A. Patel to J. W. Karn on Asbestos Monitoring at the Sistersville Plant (1984)

    Memo from M. A. Patel to J. W. Karn transmitting results of asbestos air monitoring at the Sistersville Plant (Steam Plant third level and Polymer 2, Building 48) during insulation stripping on April 2 and 25, 1984. It reports high fiber levels in…

  9. Company document · Union Carbide documents · December 12, 1984

    M. F. Stowers to G. W. Phares on Asbestos Monitoring During Insulation Stripping at the Institute Plant (1984)

    Internal memo reporting personal asbestos exposure monitoring on November 13, 1984 during stripping of about 100 ft of asbestos-containing steam line insulation at the Institute plant. It states that all four samples were well below the 2.0 fibers…

  10. Company document · Union Carbide documents · January 6, 1984

    L. R. Noble to J. W. Barna and Others on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)

    Memorandum documenting a January 5, 1984 meeting on how Construction Department employees would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It sets out eight action steps: EPA…

  11. Company document · Union Carbide documents · June 20, 1984

    M. A. Patel to J. W. Karn on Asbestos Monitoring at the Sistersville Plant (1984)

    Memorandum from M. A. Patel to J. W. Karn transmitting results of asbestos air monitoring at the Sistersville Plant (Steam Plant and Polymer 2, Building 48) during insulation stripping by Construction Department employees on April 2 and 25, 1984.…

  12. Company document · Union Carbide documents · May 28, 1987

    D. Liebeskind to L. W. Phair on Asbestos Orientation for Sistersville Plant Workers, with Asbestos Abatement Brochure (1987)

    …would conduct an asbestos orientation for workers at the Sistersville plant for about $1000/day plus expenses. The memo asks for the Union's views and attaches a brochure, 'Asbestos Abatement: Doin' It Right – Work Practices'…

  13. Company document · Union Carbide documents · May 16, 1985

    M. F. Stowers to R. S. Howell on Asbestos Monitoring During Insulation Stripping at the Institute Plant (1985)

    Internal memo reporting asbestos air monitoring done on May 7, 1985 while construction employees stripped about 200 ft. of insulation from 3 inch process lines near the Pesticide B Unit at the Institute plant. It states all samples were below the…

  14. Company document · Union Carbide documents · January 6, 1984

    L. R. Noble to J. W. Barna and Others on the Asbestos Insulation Removal Project at the Sistersville Plant Steam Plant and Monomers Unit (1984)

    Memorandum documenting a January 5, 1984 meeting on how the Construction Department would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action steps with…

  15. Company document · Union Carbide documents · September 18, 1987

    Industrial Hygiene (EM&TS - HS&EA) to H. E. Rucker on Asbestos Exposure Monitoring During Pumphouse Pipe Stripping (1987)

    Internal Union Carbide memo transmitting results of asbestos air monitoring done during removal of asbestos insulation from about 310 feet of pipe at the #1 Pumphouse and about 50 square feet from a reactor at Building…

  16. Company document · Union Carbide documents · June 20, 1984

    M. A. Patel to J. W. Karn on Asbestos Monitoring at Sistersville Plant (1984)

    Memorandum from M. A. Patel to J. W. Karn transmitting results of asbestos exposure monitoring at the Sistersville Plant (Steam Plant and Polymer 2, Building 48) during insulation stripping on April 2 and 25, 1984. The memo states that Building 48…

  17. Company document · Union Carbide documents · November 7, 1986

    D. A. Boggs to S. L. Curtis on Serious Asbestos Health Hazard in the Monomers North Rectification Area, Sistersville Plant (1986)

    Memo from the Sistersville Plant industrial hygienist reporting exposed, deteriorating asbestos insulation on distillation columns in the Monomers North Rectification Area and chunks of asbestos material found on the ground up to about 60 yards…

  18. Company document · Union Carbide documents · June 30, 1987

    Industrial Hygiene Results: Asbestos Exposure of UCC Design and Construction Insulators Using a Glove Bag, Polymers I Tank Farm (1987)

    Industrial hygiene report dated June 30, 1987, on personal air samples taken February 13, 1987 from two UCC Design and Construction insulators removing asbestos with a glove bag at the Polymers I tank farm. One sample (0.22 f/cc) exceeded the 0.2…

  19. Company document · Union Carbide documents · February 26, 1986

    T. L. Grittie to R. E. Crum and Others on Results of Asbestos Analysis of Lint from Vogue-Swift Washing Machines (1986)

    …results of the lint analysis (Feb. 26, 1986), with handwritten note Kemron Environmental Services fiber identification qualitative analysis form for Union Carbide, sample 5610696 (scanned upside down) Borg-Warner inter-office correspondence dated Feb. 12, 1986…

  20. Company document · Union Carbide documents · January 6, 1984

    L. R. Noble to Distribution on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)

    Memorandum documenting a January 5, 1984 meeting on precautions for Construction Department employees removing asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action items:…