6 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · June 22, 1982
Union Carbide Technical Center Memo on Non-Asbestos Compressed Gasketing Materials, with L. B. Hewitt Cover Note to W. B. Troutman (1982)
…Center memorandum on non-asbestos compressed non-metallic gasketing materials. The memo said the non-asbestos gaskets had not been proven in Union Carbide's services, that limited testing showed poorer chemical resistance and lower maximum…
-
Company document · Union Carbide documents · September 30, 1985
L. W. Youngblood to R. G. Hull on Air Sampling of Asbestos Gasket Storage, Building 330, Institute Plant (1985)
Internal memo reporting the Industrial Hygiene Department's response to a Union Safety First and Health Committee concern about asbestos-containing gaskets stored in Building 330 at the Institute Plant. It states that two days of…
-
Company document · Union Carbide documents · March 25, 1987
J. K. Corrie to Maintenance Staff Transmitting Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)
A March 25, 1987 cover memo from J. K. Corrie circulating a final review draft of Maintenance Safety Procedure XVIII, Asbestos Handling, for the South Charleston plant, with comments requested by April 3, 1987. The attached 20-page draft (dated…
-
Company document · Union Carbide documents · June 11, 1987
M. J. Shoger to J. K. Corrie and Others on Asbestos Enclosures and HWP Requirements Meeting (1987)
Internal Union Carbide memo announcing a June 19 meeting, sponsored by Chuck Rotthoff, with Institute, South Charleston and Sistersville personnel on plant practices for enclosures used in asbestos removal. It states there were two close calls…
-
Company document · Union Carbide documents · March 25, 1987
J. K. Corrie to J. R. Dement and Others Circulating Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)
…with handwritten routing note dated 3-25-87 and comments signed Bob Hull (UCC 019705) Clean copy of the same Corrie transmittal memo on Union Carbide Specialty Chemicals Division letterhead (UCC 019706) Maintenance Safety Manual XVIII…
-
Company document · Union Carbide documents · May 5, 1987
L. B. Hewitt to Plant Department Heads on the Asbestos Insulation Project at the South Charleston Plant, with Attached Project Plan and Schedule (1987)
Memo from L. B. Hewitt to plant department heads describing a multi-phase project to remove asbestos insulation at the South Charleston plant, with the criteria used to set priorities and the contractor, Powerhouse Equipment Company. Attachments…