Company document · Union Carbide documents · December 1, 1986
M. A. Patel to T. E. Hanning Transmitting Notes on Union Carbide Practice SH-256, Removal and Handling of Asbestos-Containing Insulation, with Hanning's Asbestos Update Memo (1986)
Handwritten note dated 12-1-86 to T. E. Hanning with comments on SH-256 (UCC 011229) Union Carbide Central Engineering Recommended Practice SH-256, Removal and Handling Asbestos-Containing Insulation Material, September 1986, 6 pages…
-
Company document · Union Carbide documents
Union Carbide Construction/Services Department Asbestos Insulation Removal and Disposal Supervisor's Reports (Plant 380 and related sites)
Ten completed Construction/Services Department Supervisor's Reports on asbestos insulation removal and disposal, plus a one-page 'Attachment A' report form. Each form records job location, supervisor, date, description, feet removed, employees…
-
Company document · Union Carbide documents · 1986
West Virginia Air Pollution Control Commission Asbestos Notice Letter to R. H. Smith, with Union Carbide Technical Center Asbestos Sampling and Monitoring Memos (1986)
…Commission) to R. H. Smith, Union Carbide, on notice requirements for asbestos demolition and renovation under 40 CFR Part 61 Subpart M Blank WVAPCC Asbestos Removal Notification form (APCC-ARN-3/86) Memo, June 23, 1986…
-
Company document · Union Carbide documents · September 5, 1986
T. E. Hanning to S. W. Clark and Others on Asbestos Update: Union Support for Proposed EPA Ban (1986)
…marked 'For Your Information', reporting that labor unions were endorsing a proposed EPA asbestos ban and contending that OSHA's 0.2 fiber/cc limit gave insufficient worker protection. It also summarizes the proposed EPA rule…
-
Company document · Union Carbide documents · April 1, 1987
R. E. Coyne Handwritten Note on Asbestos Removal from a Dowtherm Line in a Pipe Rack at Building 9 (1987)
One-page handwritten note dated 4-1-87 on a Dowtherm line with asbestos material in a pipe rack on the south side of Building 9. It states that an enclosure was not feasible because pipe was in the way and a good seal could not be made, and it lists…
-
Company document · Union Carbide documents · October 3, 1979
Ron Ritchie to J. B. Leverton and R. J. Taylor Forwarding OSHA Jobsite Information Survey Correspondence (1979)
Cover memo from Ron Ritchie passing along correspondence about OSHA Jobsite Information Surveys, with an Employee Relations memo from R. V. Welty (Oct. 1, 1979) and a Sept. 21, 1979 letter from Law Department attorney John W. Whittlesey to J. B.…
-
Company document · Union Carbide documents
Insulation Asbestest Results Forms Logging Asbestos Spot Tests on Insulation and Other Samples (1986-1987)
A 34-page series of handwritten entries on a preprinted 'Insulation Asbestest Results Form'. Each entry gives a sample date, who submitted the sample, the sample source, magnesium and iron test results, the analyst's initials, and remarks. The six…
-
Company document · Union Carbide documents · January 9, 1987
J. B. Leverton to Eli Bell, Texas Air Control Board, on Asbestos Insulation Removal at Texas City Marine Terminal (1987)
Letter notifying the Texas Air Control Board, under 40 CFR 61.146, of planned renovation to remove insulation from steam service headers at the Texas City marine terminal. It gives the amount (about 584 feet), the scheduled dates (January 22 to…
-
Company document · Union Carbide documents · August 14, 1985
J. B. Leverton to Texas Air Control Board on Asbestos Insulation Removal from Fluid Bed Dryer at Texas City Plant (1985)
Letter to the Texas Air Control Board giving notice, under 40 CFR 61.146, of planned removal of about 400 square feet of insulation from the fluid bed dryer at Bldg. 121 of the Texas City plant. It gives the schedule (after August 26, 1985, to be…
-
Company document · Union Carbide documents · July 22, 1980
A. P. Yalcinkaya to L. A. Smith and D. B. Whittington Posting OSHA Notice of Trial, Docket 80-1943, Texas City Ethanol Unit (1980)
…July 22, 1980, asking that the Notice of Trial be posted at the Ethanol Unit OSHRC Notice of Trial, Secretary of Labor v. Union Carbide Corporation, Docket 80-1943, signed by Judge Erwin L. Stuller, dated…
-
Company document · Union Carbide documents · January 26, 1987
Kirk E. Martin to A. L. Welch on Asbestos Exposure Monitoring at Texas City, with Attached OSHA Appendix A and Related Correspondence (1987)
…1987 memo in which Kirk E. Martin responded to a contractor's complaint that Union Carbide's Texas City laboratory air-sample results for asbestos were inaccurate, stating the results stood and citing the OSHA counting…
-
Company document · Union Carbide documents · July 23, 1985
J. B. Leverton to Texas Air Control Board on Renovation Notification for Asbestos Insulation Removal at Texas City Plant (1985)
…under 40 CFR 61.146, of Union Carbide's plan to remove about 1800 square feet of asbestos insulation from steam lines and valves in Building 180 at its Texas City plant. Removal was scheduled from…
-
Company document · Union Carbide documents · January 6, 1984
L. R. Noble to J. W. Barna and Others on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)
Memorandum documenting a January 5, 1984 meeting on how Construction Department employees would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It sets out eight action steps: EPA…
-
Company document · Union Carbide documents · April 23, 1986
Vance E. Stover to J. D. McCue on Asbestos Testing of Insulation Samples from Building 701 (1986)
Internal memo reporting test results for asbestos on samples taken from three lines with disturbed outer coating in the basement of building 701. It states all samples contain asbestos and lists handling precautions. A second page is an Insulation…
-
Company document · Union Carbide documents · November 9, 1979
J. B. Leverton to F. S. Provenzano Transmitting the Texas City Plant Asbestos Standard Compliance Audit (1979)
Cover letter dated November 9, 1979 from J. B. Leverton to F. S. Provenzano, with copies to plant and corporate staff, attaching an audit of Texas City Plant compliance with the OSHA asbestos standard (29 CFR 1910.1001). Leverton concurred with the…
-
Company document · Union Carbide documents · January 12, 1987
J. B. Leverton to Eli Bell, Texas Air Control Board, Renovation Notification for Asbestos Insulation Removal at Texas City (1987)
…Board, under 40 CFR 61.146, that Union Carbide planned to remove asbestos insulation from the 1st and 2nd effect columns at building 94 of its Texas City plant. It gave about 238 square feet, a…
-
Company document · Union Carbide documents · September 19, 1977
T. J. Covin to J. P. Alexander and Others on Compliance with the EPA Asbestos Regulation (1977)
Internal correspondence from T. J. Covin of the Taft EP Dept. to plant recipients about the EPA National Emission Standard for Asbestos (40 CFR 61), which requires EPA notification of removal of asbestos-containing insulation or fireproofing above…
-
Company document · Union Carbide documents · February 26, 1987
J. B. Leverton to Eli Bell, Texas Air Control Board, Notifying of Asbestos Steam Line Insulation Removal at Texas City Plant (1987)
…under 40 CFR 61.146, that Union Carbide planned to remove asbestos insulation from 520 linear feet of 3-inch steam line north of building 56 at the Texas City plant, from March 23 to June…
-
Company document · Union Carbide documents · June 20, 1984
M. A. Patel to J. W. Karn on Asbestos Monitoring at the Sistersville Plant (1984)
Memorandum from M. A. Patel to J. W. Karn transmitting results of asbestos air monitoring at the Sistersville Plant (Steam Plant and Polymer 2, Building 48) during insulation stripping by Construction Department employees on April 2 and 25, 1984.…
-
Company document · Union Carbide documents · August 13, 1985
S. J. Footer to F. S. Provenzano on the Texas City Plant Insulation Repair Program (1985)
Internal memo of August 13, 1985 recommending that the Texas City plant insulation repair project be split into operating facilities and facilities shut down for future demolition, with repair completion targets of one to three years depending on…