33 results for “Union Carbide Corporation”, page 1 of 2
-
Company document · Union Carbide documents · December 1, 1986
M. A. Patel to T. E. Hanning Transmitting Notes on Union Carbide Practice SH-256, Removal and Handling of Asbestos-Containing Insulation, with Hanning's Asbestos Update Memo (1986)
Handwritten note dated 12-1-86 to T. E. Hanning with comments on SH-256 (UCC 011229) Union Carbide Central Engineering Recommended Practice SH-256, Removal and Handling Asbestos-Containing Insulation Material, September 1986, 6 pages…
-
Company document · Union Carbide documents
Union Carbide Construction/Services Department Asbestos Insulation Removal and Disposal Supervisor's Reports (Plant 380 and related sites)
Ten completed Construction/Services Department Supervisor's Reports on asbestos insulation removal and disposal, plus a one-page 'Attachment A' report form. Each form records job location, supervisor, date, description, feet removed, employees…
-
Company document · Union Carbide documents · 1986
West Virginia Air Pollution Control Commission Asbestos Notice Letter to R. H. Smith, with Union Carbide Technical Center Asbestos Sampling and Monitoring Memos (1986)
…Commission) to R. H. Smith, Union Carbide, on notice requirements for asbestos demolition and renovation under 40 CFR Part 61 Subpart M Blank WVAPCC Asbestos Removal Notification form (APCC-ARN-3/86) Memo, June 23, 1986…
-
Company document · Union Carbide documents · September 5, 1986
T. E. Hanning to S. W. Clark and Others on Asbestos Update: Union Support for Proposed EPA Ban (1986)
…marked 'For Your Information', reporting that labor unions were endorsing a proposed EPA asbestos ban and contending that OSHA's 0.2 fiber/cc limit gave insufficient worker protection. It also summarizes the proposed EPA rule…
-
Company document · Union Carbide documents · September 12, 1986
C. P. Maxwell to Browning, Collins, Graham, Keller, Mills, Noble and Rucker Transmitting M. A. Patel's OSHA Amended Asbestos Standard Training Slides (1986)
A handwritten cover note dated September 12, 1986 from C. P. Maxwell forwards copies of overhead slides that Manhar Patel prepared and used in a training session for Services and Construction Department supervisors on the OSHA amended asbestos…
-
Company document · Union Carbide documents · April 1, 1987
R. E. Coyne Handwritten Note on Asbestos Removal from a Dowtherm Line in a Pipe Rack at Building 9 (1987)
One-page handwritten note dated 4-1-87 on a Dowtherm line with asbestos material in a pipe rack on the south side of Building 9. It states that an enclosure was not feasible because pipe was in the way and a good seal could not be made, and it lists…
-
Company document · Union Carbide documents · April 4, 1983
T. L. Collins to C. W. Carman et al. Transmitting T. A. Lincoln's Memo on Reporting Occupational Illnesses on the OSHA 200 Log (1983)
A 4 April 1983 cover memo from T. L. Collins forwarded a 16 March 1983 internal memo from Dr. T. A. Lincoln, Corporate Medical Director, on reporting occupational illnesses. The Lincoln memo listed examples in seven OSHA 200 log categories,…
-
Company document · Union Carbide documents · May 3, 1985
M. F. Stowers and Manhar A. Patel to W. T. Shelton: Industrial Hygiene Monitoring for Asbestos, Bldg. 707 Heliflo Insulation Stripping (1985)
Industrial hygiene monitoring report dated May 3, 1985 on personal air samples taken April 26, 1985 from two workers stripping old insulation from a heliflo system in Bldg. 707. Results were 0.38 and 0.27 fibers/cc over 35 minutes, compared against…
-
Company document · Union Carbide documents
Insulation Asbestest Results Forms Logging Asbestos Spot Tests on Insulation and Other Samples (1986-1987)
A 34-page series of handwritten entries on a preprinted 'Insulation Asbestest Results Form'. Each entry gives a sample date, who submitted the sample, the sample source, magnesium and iron test results, the analyst's initials, and remarks. The six…
-
Company document · Union Carbide documents · November 22, 1985
G. W. Phares to B. H. Avashia, M.D., and Others on Asbestos Monitoring at South Charleston Plant (1985)
Internal Union Carbide memo reporting asbestos exposure monitoring done on November 18, 1985 while construction employees stripped and bagged insulation from a tank at the South Charleston polyols unit. It states that all samples were below…
-
Company document · Union Carbide documents · December 12, 1984
M. F. Stowers to G. W. Phares on Asbestos Monitoring During Insulation Stripping at the Institute Plant (1984)
Internal memo reporting personal asbestos exposure monitoring on November 13, 1984 during stripping of about 100 ft of asbestos-containing steam line insulation at the Institute plant. It states that all four samples were well below the 2.0 fibers…
-
Company document · Union Carbide documents · January 6, 1984
L. R. Noble to J. W. Barna and Others on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)
Memorandum documenting a January 5, 1984 meeting on how Construction Department employees would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It sets out eight action steps: EPA…
-
Company document · Union Carbide documents · April 23, 1986
Vance E. Stover to J. D. McCue on Asbestos Testing of Insulation Samples from Building 701 (1986)
Internal memo reporting test results for asbestos on samples taken from three lines with disturbed outer coating in the basement of building 701. It states all samples contain asbestos and lists handling precautions. A second page is an Insulation…
-
Company document · Union Carbide documents · June 20, 1984
M. A. Patel to J. W. Karn on Asbestos Monitoring at the Sistersville Plant (1984)
Memorandum from M. A. Patel to J. W. Karn transmitting results of asbestos air monitoring at the Sistersville Plant (Steam Plant and Polymer 2, Building 48) during insulation stripping by Construction Department employees on April 2 and 25, 1984.…
-
Company document · Union Carbide documents · January 8, 1986
T. L. Collins to B. R. McMakin and R. W. Scoular on EPA Enforcement of Asbestos Removal Regulations (1986)
Internal Union Carbide Technical Center memo transmitting an item from the January 3, 1986 issue of Inside EPA on enforcement of asbestos removal regulations. The memo said EPA was apparently giving high priority to monitoring asbestos…
-
Company document · Union Carbide documents · May 16, 1985
M. F. Stowers to R. S. Howell on Asbestos Monitoring During Insulation Stripping at the Institute Plant (1985)
Internal memo reporting asbestos air monitoring done on May 7, 1985 while construction employees stripped about 200 ft. of insulation from 3 inch process lines near the Pesticide B Unit at the Institute plant. It states all samples were below the…
-
Company document · Union Carbide documents · January 6, 1984
L. R. Noble to J. W. Barna and Others on the Asbestos Insulation Removal Project at the Sistersville Plant Steam Plant and Monomers Unit (1984)
Memorandum documenting a January 5, 1984 meeting on how the Construction Department would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action steps with…
-
Company document · Union Carbide documents · March 11, 1988
T. E. Hanning to Distribution on Need for Personal Protection When Cutting or Removing Asbestos-Containing Gaskets or Packing, with Attachments (1988)
A March 1988 "Business Confidential" memo from T. E. Hanning for the Asbestos Phaseout Task Group asked plant locations about monitoring data, written procedures, wetting and glove-bag use, and the need for personal protection when cutting or…
-
Company document · Union Carbide documents · April 13, 1987
R. D. Ondocsin to Distribution List on the April 22, 1987 Asbestos Standard Review Meeting, with M. A. Patel's Draft R/D Asbestos Procedure (1987)
A April 13, 1987 memo from Robert D. Ondocsin announced an April 22, 1987 working session in Danbury to review the OSHA construction asbestos standard, with an agenda and distribution lists. Also included is an April 30, 1987 Technical Center memo…
-
Company document · Union Carbide documents · June 20, 1984
M. A. Patel to J. W. Karn on Asbestos Monitoring at Sistersville Plant (1984)
Memorandum from M. A. Patel to J. W. Karn transmitting results of asbestos exposure monitoring at the Sistersville Plant (Steam Plant and Polymer 2, Building 48) during insulation stripping on April 2 and 25, 1984. The memo states that Building 48…