No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

40 results for “Union Carbide Corporation”, page 1 of 2

  1. Company document · Union Carbide documents · December 1, 1986

    M. A. Patel to T. E. Hanning Transmitting Notes on Union Carbide Practice SH-256, Removal and Handling of Asbestos-Containing Insulation, with Hanning's Asbestos Update Memo (1986)

    Handwritten note dated 12-1-86 to T. E. Hanning with comments on SH-256 (UCC 011229) Union Carbide Central Engineering Recommended Practice SH-256, Removal and Handling Asbestos-Containing Insulation Material, September 1986, 6 pages…

  2. Company document · Union Carbide documents

    Union Carbide Construction/Services Department Asbestos Insulation Removal and Disposal Supervisor's Reports (Plant 380 and related sites)

    Ten completed Construction/Services Department Supervisor's Reports on asbestos insulation removal and disposal, plus a one-page 'Attachment A' report form. Each form records job location, supervisor, date, description, feet removed, employees…

  3. Company document · Union Carbide documents · 1986

    West Virginia Air Pollution Control Commission Asbestos Notice Letter to R. H. Smith, with Union Carbide Technical Center Asbestos Sampling and Monitoring Memos (1986)

    …Commission) to R. H. Smith, Union Carbide, on notice requirements for asbestos demolition and renovation under 40 CFR Part 61 Subpart M Blank WVAPCC Asbestos Removal Notification form (APCC-ARN-3/86) Memo, June 23, 1986…

  4. Company document · Union Carbide documents · September 5, 1986

    T. E. Hanning to S. W. Clark and Others on Asbestos Update: Union Support for Proposed EPA Ban (1986)

    …marked 'For Your Information', reporting that labor unions were endorsing a proposed EPA asbestos ban and contending that OSHA's 0.2 fiber/cc limit gave insufficient worker protection. It also summarizes the proposed EPA rule…

  5. Company document · Union Carbide documents · April 1, 1987

    R. E. Coyne Handwritten Note on Asbestos Removal from a Dowtherm Line in a Pipe Rack at Building 9 (1987)

    One-page handwritten note dated 4-1-87 on a Dowtherm line with asbestos material in a pipe rack on the south side of Building 9. It states that an enclosure was not feasible because pipe was in the way and a good seal could not be made, and it lists…

  6. Company document · Union Carbide documents

    Insulation Asbestest Results Forms Logging Asbestos Spot Tests on Insulation and Other Samples (1986-1987)

    A 34-page series of handwritten entries on a preprinted 'Insulation Asbestest Results Form'. Each entry gives a sample date, who submitted the sample, the sample source, magnesium and iron test results, the analyst's initials, and remarks. The six…

  7. Company document · Union Carbide documents · July 23, 1986

    Industrial Hygiene (V. E. Stover and M. A. Patel) to O. R. Hay and Others on Asbestos Exposure Monitoring of R. E. Smith in the 701 Basement (1986)

    Internal Union Carbide memo transmitting the results of personal asbestos air monitoring of employee R. E. Smith, who was shredding paper in the 701 basement on July 1, 1986. The monitoring was requested because of concern…

  8. Company document · Union Carbide documents · July 24, 1986

    V. E. Stover and M. A. Patel to A. F. Terry on Asbestos Exposure Monitoring in Building 770 (1986)

    Internal Union Carbide memo reporting asbestos air monitoring on June 23, 1986 in Building 770 while two employees removed about 15 feet of asbestos insulation from a steam line in an air handler. It states the…

  9. Company document · Union Carbide documents · October 6, 1986

    V. E. Stover and M. A. Patel to J. M. Harbert and Others on Asbestos Exposure Monitoring at South Charleston Building 309 (1986)

    Internal Union Carbide memo transmitting results of asbestos exposure monitoring of two employees on September 9, 1986 at the South Charleston plant's Building 309, while they stripped and bagged asbestos from a 1 inch line…

  10. Company document · Union Carbide documents · January 6, 1984

    L. R. Noble to J. W. Barna and Others on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)

    Memorandum documenting a January 5, 1984 meeting on how Construction Department employees would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It sets out eight action steps: EPA…

  11. Company document · Union Carbide documents · April 23, 1986

    Vance E. Stover to J. D. McCue on Asbestos Testing of Insulation Samples from Building 701 (1986)

    Internal memo reporting test results for asbestos on samples taken from three lines with disturbed outer coating in the basement of building 701. It states all samples contain asbestos and lists handling precautions. A second page is an Insulation…

  12. Company document · Union Carbide documents · June 20, 1984

    M. A. Patel to J. W. Karn on Asbestos Monitoring at the Sistersville Plant (1984)

    Memorandum from M. A. Patel to J. W. Karn transmitting results of asbestos air monitoring at the Sistersville Plant (Steam Plant and Polymer 2, Building 48) during insulation stripping by Construction Department employees on April 2 and 25, 1984.…

  13. Company document · Union Carbide documents · August 28, 1987

    Vance E. Stover and Manhar A. Patel to A. F. Terry on Asbestos Exposure Monitoring of Insulators and Carpenters in Building 701 (1987)

    Internal Union Carbide memo reporting asbestos exposure monitoring of two insulators and two carpenters during asbestos stripping and enclosure moving in Building 701 on August 17-21, 1987. It states that insulator results were above the…

  14. Company document · Union Carbide documents · October 7, 1986

    R. W. Gilbert to B. H. Avashia, W. L. Browning and Others on Asbestos Exposure Monitoring in the Institute Construction Storeroom (1986)

    Internal Union Carbide memo reporting asbestos air monitoring done on August 19 and 26, 1986 in the Construction Storeroom, Building 2002, at Institute, while two employees dispensed asbestos gaskets. It describes the results, recommends HEPA vacuum…

  15. Company document · Union Carbide documents · January 6, 1984

    L. R. Noble to J. W. Barna and Others on the Asbestos Insulation Removal Project at the Sistersville Plant Steam Plant and Monomers Unit (1984)

    Memorandum documenting a January 5, 1984 meeting on how the Construction Department would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action steps with…

  16. Company document · Union Carbide documents · March 11, 1988

    T. E. Hanning to Distribution on Need for Personal Protection When Cutting or Removing Asbestos-Containing Gaskets or Packing, with Attachments (1988)

    A March 1988 "Business Confidential" memo from T. E. Hanning for the Asbestos Phaseout Task Group asked plant locations about monitoring data, written procedures, wetting and glove-bag use, and the need for personal protection when cutting or…

  17. Company document · Union Carbide documents · April 13, 1987

    R. D. Ondocsin to Distribution List on the April 22, 1987 Asbestos Standard Review Meeting, with M. A. Patel's Draft R/D Asbestos Procedure (1987)

    A April 13, 1987 memo from Robert D. Ondocsin announced an April 22, 1987 working session in Danbury to review the OSHA construction asbestos standard, with an agenda and distribution lists. Also included is an April 30, 1987 Technical Center memo…

  18. Company document · Union Carbide documents · June 20, 1984

    M. A. Patel to J. W. Karn on Asbestos Monitoring at Sistersville Plant (1984)

    Memorandum from M. A. Patel to J. W. Karn transmitting results of asbestos exposure monitoring at the Sistersville Plant (Steam Plant and Polymer 2, Building 48) during insulation stripping on April 2 and 25, 1984. The memo states that Building 48…

  19. Company document · Union Carbide documents · July 20, 1987

    V. E. Stover and M. A. Patel to R. W. Scoular on Background Asbestos Monitoring in Technical Center Buildings (1987)

    Internal correspondence transmitting results of background asbestos air monitoring done in various Technical Center buildings in 1987. The memo states the OSHA 0.1 fiber/cc Action Level and a 'generally accepted' background level of 0.01 fiber/cc,…

  20. Company document · Union Carbide documents · October 7, 1986

    A. F. Terry to T. L. Collins and Others on Asbestos Exposure Monitoring of Steam Line Stripping, Building 726 (1986)

    Internal Union Carbide memo transmitting asbestos air-monitoring results for two employees, R. P. Hess and F. R. Creech, who stripped asbestos insulation from steam lines outside and inside the Building 726 compressor room on September…