No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

4 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents · May 21, 1979

    P. R. Schweppe to Piping Group on Discontinuing Asbestos Rope as Centering Device for Clay and Cast Iron Soil Pipe, with Attached Standards Program Memo (1979)

    Cover memorandum from P. R. Schweppe transmitting a May 10, 1979 Standards Program memo about asbestos rope used as centering devices for cast iron soil pipe and clay pipe sewer and drain systems. The attached memo said handling asbestos rope may…

  2. Company document · Union Carbide documents · October 9, 1979

    Harvey R. Schulz to J. H. Barrett et al. on OSHA Complaint Investigation at the Texas City Plant Van Box Shop (1979)

    Internal Union Carbide memo dated October 9, 1979 reporting an OSHA industrial hygienist's October 3, 1979 visit to the Texas City Plant to investigate an employee complaint of overexposure to ozone, argon and metal fumes…

  3. Company document · Union Carbide documents · May 21, 1979

    P. R. Schweppe to Engineering Distribution on Discontinuing Asbestos Centering Rope for Clay Pipe and Cast Iron Soil Pipe, with Attached L. A. Peggs Memo (1979)

    A May 21, 1979 cover memorandum from P. R. Schweppe forwarding an attached May 10, 1979 memo from the Chemicals/Plastics Division Standards Program (questions directed to L. A. Peggs). The attached memo states that asbestos rope listed in piping…

  4. Company document · Union Carbide documents · September 9, 1976

    K. Gran Townsend to G. P. Durocher on Handling Asbestos Materials in the Brownsville Plant Warehouse (1976)

    Internal letter-memo dated September 9, 1976, following a visit to the Brownsville Plant warehouse at G. P. Durocher's request for guidance on handling asbestos-containing materials. It states the small quantity on hand should not be a health hazard…