No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

9 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents · May 21, 1979

    P. R. Schweppe to Piping Group on Discontinuing Asbestos Rope as Centering Device for Clay and Cast Iron Soil Pipe, with Attached Standards Program Memo (1979)

    Cover memorandum from P. R. Schweppe transmitting a May 10, 1979 Standards Program memo about asbestos rope used as centering devices for cast iron soil pipe and clay pipe sewer and drain systems. The attached memo said handling asbestos rope may…

  2. Company document · Union Carbide documents · October 26, 1981

    E. L. Adkins to C. F. Morris on Asbestos Monitoring Data for Gasket Fabrication, Building 325, Institute Plant (1981)

    Internal memo from E. L. Adkins (Industrial Hygiene) reporting asbestos air monitoring on October 6, 1981 in the gasket fabrication area of Building 325, Institute Plant, where an employee cut Garlok sheets into gaskets. One personal and one area…

  3. Company document · Union Carbide documents · July 9, 1976

    H. H. Frazier to P. H. Day on Employee Exposure to Asbestos in Plant Stores Building 330 (1976)

    Memo reporting area and personal air samples for asbestos fibers taken on June 7 and June 16, 1976 at asbestos rope and gasket storage bins in Plant Stores Building 330, after questions from Plant Stores employees. Counts ranged from 0.0 to 1.0…

  4. Company document · Union Carbide documents · April 6, 1976

    H. H. Frazier to J. F. Ballew, Jr. on Airborne Asbestos Fiber Counts During Preparation of Residue Analysis Sample Dishes, Institute Plant (1976)

    Memo from H. H. Frazier of Industrial Hygiene to J. F. Ballew, Jr. reporting three fiber-count samplings of employees preparing sample dishes with asbestos fibers in Analytical Laboratory Room 108, with results of 4.9, 47.6 and 7.7 fibers/ml. It…

  5. Company document · Union Carbide documents · March 15, 1979

    H. H. Frazier to Peter Barna on Use of AMATEX Asbestos Tape in Plant 512 (1979)

    Memo from H. H. Frazier to Peter Barna on three brands of insulating tape used at the Institute Plant. It reports that AMATEX tape contained raw asbestos fibers including dust, cites measurements of 0.03 to 1.9 fibers per cc at the Technical Center,…

  6. Company document · Union Carbide documents · May 21, 1979

    P. R. Schweppe to Engineering Distribution on Discontinuing Asbestos Centering Rope for Clay Pipe and Cast Iron Soil Pipe, with Attached L. A. Peggs Memo (1979)

    A May 21, 1979 cover memorandum from P. R. Schweppe forwarding an attached May 10, 1979 memo from the Chemicals/Plastics Division Standards Program (questions directed to L. A. Peggs). The attached memo states that asbestos rope listed in piping…

  7. Company document · Union Carbide documents · July 8, 1976

    H. H. Frazier to A. R. Clark on Asbestos Exposure Associated With Automotive Brake Systems, with April 1976 Frazier Memo to J. F. Ballew Jr. on Laboratory Asbestos Fiber Counts (1976)

    Two internal Union Carbide Institute Plant memos by H. H. Frazier. The July 8, 1976 memo reports fiber counts taken on a mechanic during three brake service tasks (0.4, 0.2 and 1.9 fibers…

  8. Company document · Union Carbide documents · March 15, 1983

    H. H. Frazier to R. G. Hull, Jr. on Personal Asbestos Exposure During Acetone Unit Demolition, Complex VI (1983)

    Internal Union Carbide memo from Industrial Hygiene at the Institute Plant reporting three airborne asbestos samples taken during insulation demolition at the Acetone Unit. It gives results of 0.2, 0.5 and 0.8 fibers…

  9. Company document · Union Carbide documents · March 15, 1983

    H. H. Frazier to P. J. Morris on Personal Asbestos Exposure Monitoring of Two Insulator/Painters at Maintenance Complex VIII, Institute Plant (1983)

    Internal Union Carbide memo reporting personal air monitoring of two insulator/painters removing protective covering from asbestos-insulated pipe valve at Maintenance Complex VIII on 2/3/83. It reports 15-minute results of 0.8…