No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

51 results for “Union Carbide Corporation”, page 1 of 3

  1. Company document · Union Carbide documents · July 9, 1971

    R. W. Schwartz Memo Forwarding Minutes of the GE/Hooker/Union Carbide Safety Meeting on Asbestos Handling (1971)

    …July 9, 1971 cover memo sent a distribution list the minutes of a June 18, 1971 safety meeting among General Electric, Hooker Chemical and Union Carbide, and pointed readers to the asbestos paragraphs. The minutes, prepared…

  2. Company document · Union Carbide documents · June 15, 1971

    P. W. McDaniel and J. L. Myers Report of Call on EPA Office of Air Programs Regarding Calidria Pellets and Asbestos Emission Standards (1971)

    Report of a June 1971 meeting between Union Carbide staff and EPA Office of Air Programs personnel (Source Control Branch) to discuss how Calidria pellets and the production system reduce asbestos dust. It records EPA's…

  3. Company document · Union Carbide documents · August 5, 1980

    Industrial Hygiene Monitoring for Asbestos: Air Samples for J. W. Greenlee and R. E. Raines, Building 707 (1980)

    Two Industrial Hygiene Monitoring for Asbestos forms dated 8/5/80, each reporting one air sample taken in Bldg. 707, Fourth Level, Cell 11, during stripping and bagging of suspected asbestos-containing insulation from about 50 feet of steam line.…

  4. Company document · Union Carbide documents · August 6, 1981

    Industrial Hygiene Monitoring for Asbestos: R. E. Raines, Building 701 Storeroom, Report to W. T. Shelton (1981)

    One-page Union Carbide industrial hygiene monitoring form for asbestos, dated August 6, 1981. It reports one 45-minute personal sample of 0.089 fibers/cc taken on August 5, 1981 on an insulator (R. E…

  5. Company document · Union Carbide documents · August 19, 1980

    Industrial Hygiene Monitoring for Asbestos Reports to W. T. Shelton on Insulation Stripping in Bldg. 706 (1980)

    Two industrial hygiene monitoring forms for asbestos dated 8/19/80, each reporting one air sample taken in Bldg. 706 (West End, second and third level) while a worker stripped and bagged insulation on the G-101 autoclave and adjacent lines. The…

  6. Company document · Union Carbide documents · September 12, 1980

    G. F. Hurley to B. E. Bess, P. W. Young and Others on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)

    Letter reporting that asbestos monitoring in the SEVIN operations area on September 3, 1980 showed 0.1 fiber per cc, which it described as below the present OSHA standard. Six breathing-zone samples were taken on three men, but because of an…

  7. Company document · Union Carbide documents · September 2, 1982

    Industrial Hygiene Monitoring Reports for Asbestos on Insulation Stripping in Building 707, to W. T. Shelton (1980-1982)

    Five one-page 'Industrial Hygiene Monitoring for Asbestos' forms addressed to W. T. Shelton of the 704 Shop. They report air-sample fiber concentrations for workers stripping insulation from steam and Dowtherm lines in Building 707, with dates from…

  8. Company document · Union Carbide documents · November 24, 1980

    Industrial Hygiene Monitoring for Asbestos: Powerhouse Steam Line Stripping, Bldg. 704, to W. T. Shelton (1980)

    One-page industrial hygiene monitoring form for asbestos dated 11/24/80. It reports personal air samples for R. E. Raines (.07 fibers/cc) and John Greenlee (.13 fibers/cc), each taken over 41 minutes in the Building 704 Powerhouse basement while…

  9. Company document · Union Carbide documents · January 17, 1972

    W. N. Johnson to P. W. McDaniel and Others on the Test Program for Airborne Asbestos (1972)

    Memo summarizing arrangements agreed at a January 12 meeting in Niagara for a program to measure airborne asbestos. The program covered a survey of employee exposure at customers' plants near Bartow, Florida, and laboratory tests at Niagara of…

  10. Company document · Union Carbide documents · October 20, 1980

    Industrial Hygiene Monitoring for Asbestos: Two Reports to W. T. Shelton on Stripping Insulation from the Dowtherm System, Bldg. 702 (1980)

    Two industrial hygiene monitoring forms dated 10/20/80 reporting asbestos fiber samples taken outside Bldg. 702 while workers stripped and bagged insulation from a Dowtherm system. J. E. Hackney's sample was 3.04 fibers >5 µm/cm3 over 57 minutes,…

  11. Company document · Union Carbide documents · September 10, 1971

    J. W. Rawlings to E. Epremian and Others on Preparing an Asbestos Safety and Control Information Package for Customers (1971)

    Memorandum from J. W. Rawlings asking seven recipients to draft assigned sections of an educational document on asbestos safety and control for customers, with drafts due September 27. The attached outline lists the proposed sections (introduction,…

  12. Company document · Union Carbide documents · July 30, 1981

    Industrial Hygiene Monitoring Reports for Asbestos Insulation Stripping, Bldg. 770-137, to W. T. Shelton (1981)

    Two Union Carbide industrial hygiene monitoring forms for asbestos, dated July 30, 1981, reporting personal air sampling on two workers in Bldg. 770-137 on 07/24/81. One sample measured .3 fibers >5 µm/cm3…

  13. Company document · Union Carbide documents · September 9, 1980

    Industrial Hygiene Monitoring for Asbestos Report to W. T. Shelton on Insulation Stripping in Building 705, Cell 8 (1980)

    A one-page industrial hygiene monitoring form for asbestos covering Services Insulators stripping old insulation in Building 705, Cell 8, on 9/9/80. It records two air samples (1.17 and 1.30 fibers, 24 minutes at 2 LPM), lists the OSHA allowable…

  14. Company document · Union Carbide documents · April 22, 1981

    Industrial Hygiene Monitoring for Asbestos Reports to W. T. Shelton on Powerhouse Insulation Stripping, Bldg. 704 (1981)

    Two industrial hygiene monitoring forms dated 4/22/81 reporting airborne asbestos sampling on 4/21/81 in the Building 704 Powerhouse while insulators stripped old insulation from about 17 feet of steam line on the #2 boiler. Page 1 reports a…

  15. Company document · Union Carbide documents · November 5, 1973

    P. W. McDaniel to F. H. Larrison, Jr. on Air Samples Taken at the King City South Fence Line (1973)

    Internal letter marked CONFIDENTIAL in which the Medical Department's industrial hygiene engineer reported air samples he collected on October 24, 1973 at the south fence line of the King City site. He gave fiber counts of 0.16 and 0.12 fibers/ml (5…

  16. Company document · Union Carbide documents · November 16, 1979

    Technical Center IH/EP (Ruth Clise) to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse (1979)

    Internal industrial hygiene report on air sampling done October 26, 1979 while Construction workers stripped and bagged asbestos-containing insulation from an exhaust duct in the Building 704 Powerhouse in South Charleston. It reports that dust on…

  17. Company document · Union Carbide documents · December 5, 1978

    G. F. Hurley and M. E. Perry to Distribution on Clarification of Monitoring for Removal and Disposal of Asbestos-Containing Insulation (1978)

    A December 5, 1978 memorandum from G. F. Hurley and M. E. Perry to a distribution list clarifying items 1 and 2 of a November 6, 1978 Merz/Perry letter on removal and disposal of asbestos-containing insulation. It states that the Industrial Hygiene…

  18. Company document · Union Carbide documents · November 6, 1972

    P. W. McDaniel to F. H. Larrison on Dust Counts of Air Samples Collected at King City (1972)

    Internal Union Carbide letter marked CONFIDENTIAL from the Medical Department's industrial hygiene engineer to the King City mill, reporting airborne fiber counts from samples taken October 18-19, 1972. It compares 25 mm and 47…

  19. Company document · Union Carbide documents · July 30, 1981

    Industrial Hygiene Monitoring for Asbestos: Insulator Stripping and Bagging Samples for J. W. Greenlee and J. R. Monin, Bldg. 770-137 (1981)

    Two industrial hygiene monitoring reports for asbestos, dated July 30, 1981, each reporting a single air sample taken on 07/24/81 in Bldg. 770-137. One covers J. W. Greenlee stripping about 60 feet of insulation from a steamline (.3 fibers >5…

  20. Company document · Union Carbide documents · August 23, 1974

    E. A. Piersall to Larrison, McDaniel, Reichard, Thurber and Welsh on Asbestos Dust Sampling and Record Keeping, with L. Larrison's June 26, 1974 Reply on King City Sampling Program (1974)

    Exhibit UC-1554 contains an August 23, 1974 internal memo from E. A. Piersall (Grand Junction) saying no conclusion had been reached on his proposed asbestos dust sampling and record keeping program for King City and suggesting a discussion during…