25 results for “Union Carbide Corporation”, page 1 of 2
-
Company document · Union Carbide documents · August 5, 1971
Union Carbide R&D Project Reports: Industrial Hygiene Surveys of Bound Brook and Torrance Plants (R. W. Cope) and Asbestos Dispersion for Paper Coating (Kelly and Buttrick) (1970-1971)
Compilation of four Union Carbide Chemicals and Plastics R&D project reports. Three are R. W. Cope's industrial hygiene surveys of the Bound Brook plant (August 1971 and February 1971) and the Torrance plant (May…
-
Company document · Union Carbide documents · July 9, 1971
R. W. Schwartz Memo Forwarding Minutes of the GE/Hooker/Union Carbide Safety Meeting on Asbestos Handling (1971)
…July 9, 1971 cover memo sent a distribution list the minutes of a June 18, 1971 safety meeting among General Electric, Hooker Chemical and Union Carbide, and pointed readers to the asbestos paragraphs. The minutes, prepared…
-
Company document · Union Carbide documents
Union Carbide R&D Project Reports on Haveg-41 Asbestos Filler, Asbestos in Paper Coatings, and Bound Brook Asbestos Dust Air Analyses (1968–1972)
…Union Carbide R&D Department project reports. The first (1968) reports X-ray diffraction analysis of the asbestos and talc filler in Haveg-41 and its attack by HCl. The second (1969) reports tests of Carbide…
-
Company document · Union Carbide documents · February 29, 1972
Minutes of Meeting on Measuring Employee Asbestos Exposure to Meet the Proposed OSHA Standard, submitted by N. H. Ketcham (1972)
Minutes of a February 29, 1972 meeting of Union Carbide plant and Environmental Health Laboratory personnel to plan measurement of employee asbestos exposure under the proposed OSHA standard. The minutes list five objectives, attach an outline…
-
Company document · Union Carbide documents · February 29, 1972
N. H. Ketcham Minutes of Meeting on Measuring Employee Exposure to Asbestos Under the Proposed OSHA Standard (1972)
Minutes of a February 29, 1972 meeting of Union Carbide plant and laboratory staff to plan measurement of employee exposure to asbestos in line with the proposed OSHA standard. The minutes list objectives, agreed air-sampling…
-
Company document · Union Carbide documents · January 13, 1978
R. E. Graebert Forwarding J. W. Whittlesey's Advice to Dr. Welsh on OSHA Recordkeeping of Occupational Illnesses (1978)
A one-page cover memo dated January 13, 1978 from R. E. Graebert (Chemicals and Plastics Safety) to safety directors and the safety committee, attaching John W. Whittlesey's January 9, 1978 letter to Dr. Welsh on OSHA recordkeeping. The letter said…
-
Company document · Union Carbide documents · March 23, 1972
R. W. Cope Project Report on Industrial Hygiene Survey and Asbestos Air Analyses at the Bound Brook Plant (1972)
Project report (Project 910E10) on a February 14-15, 1972 visit to the Bound Brook Plant to sample air for asbestos fibers near Unit B, Building 3, and for nuisance dust at Unit 5, and to survey other production units for environmental health…
-
Company document · Union Carbide documents · June 25, 1984
H. C. Lewinsohn to Distribution Transmitting Revised Draft OSHA Asbestos Testimony, with Draft 'Medical Examinations Required for Asbestos Workers' (1984)
…1984 cover memo from Union Carbide's Assistant Corporate Medical Director circulates a revised draft of his proposed testimony for the OSHA informal rulemaking hearing on occupational exposure to asbestos and asks for comments by July…
-
Company document · Union Carbide documents · January 1977
R. W. Cope Memorandum Listing Known and Suspected Carcinogenic Compounds (1977)
A memorandum from R. W. Cope saying that Technical Center R/D management asked for a published list of known and suspected carcinogenic compounds. It explains the criteria used and the sources (NIOSH, ACGIH, NCI), and attaches a table of 'Known and…
-
Company document · Union Carbide documents · September 22, 1972
R. W. Cope Project Report on Bound Brook Plant Industrial Hygiene Program, Air Analyses (1972)
Project report on an August 8-10, 1972 visit to the Bound Brook Plant to collect air samples for asbestos, mercury vapor and solvent vapor, and to assist the new plant industrial hygienist. It reports asbestos fiber counts from Building 3, Units A,…
-
Company document · Union Carbide documents · March 15, 1974
R. E. Graebert to W. W. McManus and R. C. Glock Transmitting the 1974 Safety Audit of the Brownsville Plant (1974)
Internal Union Carbide memo dated March 15, 1974 transmitting the 1974 annual safety audit of the Brownsville plant. The audit report covers interviews with plant employees and findings on training, the Brown and Root maintenance contractor…
-
Company document · Union Carbide documents · November 5, 1984
R. D. Ondocsin to F. J. Barris on Asbestos Area Samples at Linde Division, Ashtabula (1984)
Internal Union Carbide memo dated November 5, 1984 reporting results of five area air samples collected October 18, 1984 at the Linde Division, Ashtabula, Ohio, and analyzed for asbestos. The memo says four of five samples…
-
Company document · Union Carbide documents · March 6, 1980
R. E. Graebert to Division SHARE Managers on Safety and Health Requirements for Contractors, with Procedure Guideline and Sample Contract Language (1980)
…memo from R. E. Graebert transmitting the final Procedure Guideline on safety and health requirements for contractors working at Union Carbide chemicals and plastics-type facilities. The attachments set out contractor minimum standards, sample safety and…
-
Company document · Union Carbide documents · June 8, 1972
R. W. Cope Project Report on Asbestos Dust Air Analyses at the Bound Brook Plant (1972)
Project report (No. 910E10, File 17258) on personal air sampling for asbestos fibers taken May 18, 1972 at Units A, B, C and R1 during phenolic resin manufacture at the Bound Brook Plant. It reports fiber counts at or above the OSHA emergency…
-
Company document · Union Carbide documents · December 24, 1981
R. W. Cope Forwarding Norton Company Letter and NIOSH Notice on Respirators Used Against Asbestos (1981)
Union Carbide internal correspondence from R. W. Cope, December 24, 1981, forwarding the attachment to a distribution list Letter from Thomas B. Pickle, Norton Company Safety Products Division, to Randy Geiger of W. R. Grace & Company…
-
Company document · Union Carbide documents · July 17, 1972
D. E. Deese to Distribution on OSHA Respiratory Protection Requirement for Asbestos Tear-Out (1972)
Memo from the Gulf Coast Area senior industrial hygienist to a list of Union Carbide recipients reporting OSHA's interpretation of respiratory protection for asbestos tear-out or removal. It states that OSHA's Delbert Flowers…
-
Company document · Union Carbide documents · December 17, 1971
R. W. Cope, Industrial Hygiene Survey of Air Analyses at the Bound Brook Plant, Including Asbestos Fiber Counts in Building 3 (1971)
Project report on air sampling done at Union Carbide's Bound Brook Plant on November 11 and 12, 1971, mainly for asbestos fibers in Building 3 during an experimental phenolic molding resin run. It also covers…
-
Company document · Union Carbide documents · March 6, 1980
R. E. Graebert to Division SHARE Managers Transmitting Procedure Guideline on Safety and Health Requirements for Contractors (1980)
A March 6, 1980 internal Union Carbide memo transmits the final Procedure Guideline on safety and health requirements for contractors working at chemicals and plastics-type facilities. The attached guideline sets minimum contractor safety rules, sample…
-
Company document · Union Carbide documents · March 21, 1977
R. J. Taylor Teletype on OSHA Inspection of Texas City Plant Locker Room (1977)
Teletype from R. J. Taylor at the Texas City Plant reporting an OSHA compliance officer's March 18 visit to inspect the Building 74 maintenance locker room after an employee complaint about rest breaks. It states the officer found no violations of…
-
Company document · Union Carbide documents · February 24, 1972
R. W. Cope Project Report on Industrial Hygiene Survey of Air Analyses at the Bound Brook Plant (1972)
Project report on R. W. Cope's January 27-28, 1972 visit to the Bound Brook Plant to meet New Jersey inspectors and compare dust sampling methods, with air samples taken in several departments. Asbestos fiber samples at Building 3, Unit C ranged…