No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

30 results for “Union Carbide Corporation”, page 1 of 2

  1. Company document · Union Carbide documents · December 1974

    Cal-OSHA Citation to Union Carbide's King City Asbestos Mill and R. O. Marsten's Memo on the Inspection (1974)

    California Division of Industrial Safety citation (12/9/74) to the Union Carbide asbestos mill, with a handwritten routing note at top Page with a rotated handwritten note and a 'RECEIVED' stamp; otherwise blank R. O…

  2. Company document · Union Carbide documents · December 1972

    R. O. Marsten, Environmental Impact Process Survey Forms for the King City Mine (1972)

    Ten pages of handwritten environmental protection/process survey forms for the Mine at the King City plant, dated December 1972. They cover storage tanks, noise emissions, air emissions (including asbestos dust from screening and haul roads,…

  3. Company document · Union Carbide documents · June 6, 1980

    P. R. Sherman and R. O. Marsten Trip Report on Asbestos Bagging Improvement at Bound Brook and Union Camp (1980)

    …NJ, and Union Camp's Lyndhurst plant. It describes why the Union Camp accumulator/loader was judged unsuitable for a dust-proof overwrap of asbestos bags at King City. It then lists the agreed program of…

  4. Company document · Union Carbide documents · January 14, 1974

    W. C. Thurber to F. H. Larrison and Others Confirming RG-244 Packaging Changes (1974)

    Memo from W. C. Thurber confirming discussions of January 11, 1974 on packaging of RG-244. It says cardboard shrouds will be dropped once inventory is used up and that 3-ply bags will give way to slightly larger two-ply bags. It also covers gluing…

  5. Company document · Union Carbide documents · October 20, 1976

    J. E. Walsh Call Report on Celanese Plastics (Bishop, Texas) RG144 Packaging Complaints, with R. O. Marsten's Visit Memo (1976)

    A customer call report (pp. 1-2) by salesman J. E. Walsh on an October 20, 1976 visit to Celanese Plastics in Bishop, Texas, about torn bags and loose fiber on RG144 asbestos shipments and the customer's air sampling during truck unloading. It is…

  6. Company document · Union Carbide documents · November 4, 1974

    W. C. Thurber to V. D. Holt, R. J. Klotzbach, F. H. Larrison and J. L. Myers on Shrink Wrapping Bags to Control Fill-Valve Leakage (1974)

    Memo from W. C. Thurber, with a copy line for O. J. Malocarne of Niagara Falls, New York, to four recipients. It says leakage from the fill valve is a major problem in packaging asbestos. It asks for an individual bag shrink film oven and a bag…

  7. Company document · Union Carbide documents · November 27, 1973

    R. E. Byrne, Jr. Informal Report on TiO2 Contamination of RG-244 During the T-135 Plant Run (1973)

    Informal report describing TiO2 contamination found in RG-244 asbestos produced during the August 15-22, 1973 T-135 plant run at King City. It reports TiO2 levels up to almost 3%, no correlation between TiO2 content and thickening efficiency, sales…

  8. Company document · Union Carbide documents · December 6, 1973

    B. L. Ingalls Project Report on Shrink-Wrap Packaging Tests for Calidria Bags and Pallets (1973)

    …tests, with Tables I and II, cost information and conclusions Union Carbide Films-Packaging Division sheet on pallet wrapping for outdoor storage, with outdoor exposure test charts Sample cost calculations for bag and pallet shrink-film

  9. Company document · Union Carbide documents · 1981

    Weekly Operating Reports from the King City Plant to W. C. Thurber, Metals Division (April-June 1981)

    Nine weekly operating reports on Union Carbide internal correspondence forms, sent from the King City, California plant to W. C. Thurber in New York. Each lists production by grade (High Purity, Super Standard, Standard, RG-244…

  10. Company document · Union Carbide documents · April 29, 1980

    P. R. Sherman Design Memorandum on Asbestos Bagging Improvement at King City (1980)

    Design memorandum (Design Memo No. 1, Revision No. 0, File No. 11217) by P. R. Sherman on improving the bagging of asbestos shipments at King City, CA. It describes efforts to develop a dust-free bag with a better bag wrap and a bag closure system…

  11. Company document · Union Carbide documents · September 19, 1973

    G. L. Dickson to J. L. Myers on Evaluation of the King City RG-244 Production Facility, with Attached Report (1973)

    Internal memo from G. L. Dickson to J. L. Myers, with an attached report, summarizing a three-week visit to the King City plant in August 1973. It concluded that only a 5-10% increase in RG-244 production was possible from present facilities and…

  12. Company document · Union Carbide documents · July 19, 1973

    J. E. Walsh Report of Call to Bridgeport Chemical (Paul Meli) on Calidria 244 in Epoxy Repair Kits and Asbestos Publicity (1973)

    Report of a call on Bridgeport Chemical, a maker of epoxy resin-hardener repair kits in Pompano Beach, Florida, with Executive Vice President Paul Meli. The report says Meli was concerned about newspaper articles on asbestos and that the writer…

  13. Company document · Union Carbide documents · January 1971

    L. F. Crow and R. O. Marsten, Asbestos Operations Report, King City, California, January 1971 (1971)

    Monthly operations report for the King City plant for January 1971. It gives sales tonnage against plan by product grade and production tonnage, and covers sales orders, plant operations, workforce reductions, maintenance, safety, and mining…

  14. Company document · Union Carbide documents · March 1973

    R. O. Marsten and R. D. Hopper, Process Survey and Environmental Impact Analysis Forms for the King City Plant and Mine (1973)

    A set of handwritten Process Survey and Environmental Impact Analysis forms for the King City plant and mine, dated March 1973. They cover mine inputs and products, water quality of intake water and an impounded discharge, storage tanks, noise…

  15. Company document · Union Carbide documents · November 21, 1973

    G. L. Dickson to R. O. Marsten on Sodium Silicate Usage in King City RG-244 Production (1973)

    Internal memo from G. L. Dickson to R. O. Marsten at King City comparing the amount of sodium silicate used in producing RG-244 with the theoretical requirement. The attached Table I lists monthly RG-244 production, sodium silicate usage and…

  16. Company document · Union Carbide documents · July 13, 1981

    R. O. Marsten to H. B. Eastman on Precautions for Hauling Asbestos Ore to the King City Mill (1981)

    Letter from the mine superintendent to a trucking contractor, written after a few complaints about ore spillage and wind-blown dust along public roads. It restated eleven precautions for hauling asbestos ore from the mine to the King City mill,…

  17. Company document · Union Carbide documents · October 2, 1973

    R. O. Marsten to R. F. X. Fusaro and C. F. Raeburn Transmitting 1973 Affidavits of Performance of Work for 193 Asbestos Claims (1973)

    A one-page letter from the King City mining office to the Law Department in New York. It enclosed copies of notarized and recorded 1973 affidavits of performance of work for 193 asbestos claims. It said the year's assessment needs were met by…

  18. Company document · Union Carbide documents · November 23, 1981

    Safety Audit Team (R. L. Folkman, E. A. Piersall, H. B. Rhodes) to R. J. Kronkhyte, J. L. Myers and R. O. Marsten on the King City Safety/Health Audit (1981)

    Internal memo from the Metals Division Safety department reporting the conclusions of its October 26-27, 1981 safety/health audit of the King City plant. It reviews follow-up items from the prior audit, rates the safety program elements, and notes…

  19. Company document · Union Carbide documents · November 4, 1974

    W. C. Thurber to O. J. Malocarne et al. on Bag Spout Leakage and Shrink Wrapping, with Earlier J. L. Myers Memo to Thurber on Packaging (1974)

    Exhibit of two pages. Page 1 is a November 4, 1974 letter from W. C. Thurber to O. J. Malocarne and four others stating that leakage from the bag fill valve was a major packaging problem and requesting a bag shrink film oven and a bag cleaning…

  20. Company document · Union Carbide documents · January 1973

    R. O. Marsten, Process Survey and Environmental Impact Analysis Forms for the King City Asbestos Plant (1973)

    Set of handwritten Process Survey / Environmental Protection forms completed by R. O. Marsten for the King City asbestos plant, dated 1/73. They include simplified block diagrams of the regular asbestos circuit (100 tons/day) and the RG 244 circuit…