14 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · 1987
Union Carbide Asbestos Removal and Phase-Out Papers, Including T. E. Hanning Memo on Contractor Project Development Group (1987)
…Chemicals and Plastics Business Group, use of asbestos-containing materials in the work place Grafoil seminar outline and cover sheet (Union Carbide Specialty Products Group, Cleveland) Grafoil flexible graphite newsletter on special gasketing techniques Distribution list…
-
Company document · Union Carbide documents
Union Carbide Bound Brook Plant Asbestos Insulation Removal Procedures, Monitoring Notes and Related Memos (1972-1986)
Union Carbide press release (Feb. 1975) announcing end of phenolic molding materials production at Bound Brook General Specifications for Asbestos Removal Contracts (dated 4/2/86 in page footer) Asbestos Hazard Reduction Program action steps with…
-
Company document · Union Carbide documents · May 18, 1982
Union Carbide Plant 312 Bound Brook Maintenance Procedure MP-366.1, Asbestos Removal Procedure, by S. J. Nadbielny and W. D. Neal (1982)
A five-page maintenance procedure for the Bound Brook plant, effective 1-26-79 and revised 5/18/82, on removing and disposing of insulation containing friable asbestos. It assigns responsibilities and sets respirator and protective clothing…
-
Company document · Union Carbide documents · September 5, 1986
T. E. Hanning to S. W. Clark and Others on Asbestos Update: Union Support for Proposed EPA Ban (1986)
…marked 'For Your Information', reporting that labor unions were endorsing a proposed EPA asbestos ban and contending that OSHA's 0.2 fiber/cc limit gave insufficient worker protection. It also summarizes the proposed EPA rule…
-
Company document · Union Carbide documents · March 31, 1987
T. P. Raby to H. G. Anderson and Others on the C&P Program to Phase Out Asbestos-Containing Materials in the Workplace (1987)
Internal Union Carbide memo from T. P. Raby transmitting a draft recommended policy, "Use of Asbestos-Containing Materials in the Work Place," approved by the C&P Manufacturing Council. It states that no asbestos-containing materials…
-
Company document · Union Carbide documents · March 16, 1982
Compilation: W. D. Neal to T. P. Raby on Asbestos Removal, with K. E. Martin Transmittal and OSHA Letter on Supplied-Air Respirators for Asbestos Demolition (1982)
Compilation of a March 16, 1982 Union Carbide internal memo from W. D. Neal to T. P. Raby on asbestos removal, a March 11, 1982 transmittal memo from Kirk E. Martin at Texas City, and a…
-
Company document · Union Carbide documents · September 23, 1986
T. P. Raby to C. B. Bowden and Others Transmitting ORC Asbestos Task Force Summary, Draft OSHA Inspection Instructions and Article on Court Challenges to the New Asbestos Standard (1986)
Union Carbide internal memo, T. P. Raby to plant contacts, Asbestos Rule Update - ORC (Sept. 23, 1986) ORC memorandum (Sept. 4, 1986) by W. William Ament and Darrell K. Mattheis reviewing the Aug. 27, 1986 Task…
-
Company document · Union Carbide documents · May 25, 1982
Plant 312 Bound Brook Maintenance Procedure MP-366.1, Asbestos Removal Procedure, Page 3 of 5 (1982)
Page 3 of 5 of Maintenance Procedure MP-366.1, 'Asbestos Removal Procedure,' for the Bound Brook plant maintenance department, effective 1/26/79 and revised 5/25/82. The page covers protective clothing disposal, work area identification with…
-
Company document · Union Carbide documents · May 27, 1987
T. P. Raby Handwritten Note to C. Rotthoff Forwarding Larry E. Calvert's Safety Alert on Asbestos Enclosures (1987)
A handwritten note from T. P. Raby to C. Rotthoff forwards a copy of a Safety Alert, saying it prompted his letter to Larry Calvert and commenting on its distribution list. The attached Safety Alert, dated May 27, 1987, from Larry E. Calvert in…
-
Company document · Union Carbide documents · November 8, 1972
W. D. Neal to D. R. Albright on Asbestos Dust Measurements at the Bound Brook Plant (1972)
Internal memo from W. D. Neal of Environmental Protection reporting September and October 1972 airborne asbestos sampling in the Unit B and C work areas at Bound Brook, compared with OSHA limits. It lists housekeeping, bag-handling and work-habit…
-
Company document · Union Carbide documents · June 26, 1981
D. T. Watters to I. P. Blackwood et al. on Potential Health Risks of Insulation Materials (Perlite Insulation Specification 4) (1981)
Memorandum from D. T. Watters, June 26, 1981, on potential health risks of insulation materials Union Carbide Chemicals/Plastics Material Specification for Insulation 4M/4A/4SS (perlite), December 1980, pages 1-2 of 2
-
Company document · Union Carbide documents · May 18, 1982
S. J. Nadbielny and W. D. Neal, Asbestos Removal Procedure MP-366.1, Plant 312 Bound Brook Maintenance Department (1982)
Maintenance procedure MP-366.1 (effective 1-26-79, revised 5/18/82) for removing and disposing of friable asbestos insulation at the Bound Brook plant. It assigns responsibilities, sets respirator and protective clothing requirements by hazard…
-
Company document · Union Carbide documents · December 6, 1983
W. D. Neal to T. A. Gagner on Asbestos Removal Procedure and OSHA Respirator Requirements (1983)
Internal correspondence from the SHARE Department's staff industrial hygienist to the safety, health and environmental affairs manager at East Hartford, forwarding a procedure for removing asbestos-containing materials. The memo states the procedure…
-
Company document · Union Carbide documents · June 26, 1981
D. T. Watters to I. P. Blackwood and Others on Potential Health Risks of Insulation Materials (1981)
Memorandum responding to questions about whether non-asbestos substitute insulation was available after complaints of irritation from dust of perlite-based Insulation Specification 4 used in ethylene oxide service. It recommended continued use of…