No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

9 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents · June 22, 1989

    Union Carbide Texas City Plant Asbestos Renovation Notices for Roof Removal on Building 47 (1989)

    Texas Air Control Board Asbestos Demolition/Renovation Notification Form for Union Carbide, Texas City, signed by Andrew F. Jackson, June 22, 1989 (UCTC 18162) Handwritten Union Carbide Texas City Plant 'Notice of Intention to Demolish or…

  2. Company document · Union Carbide documents · September 25, 1989

    Texas Air Control Board Asbestos Demolition/Renovation Notification for No. 6 Boiler Economizer, Union Carbide Texas City Plant, with Plant Notice of Intention (1989)

    …ft. of asbestos from the lower section of the No. 6 Boiler Economizer at Union Carbide's Texas City plant. The removal contractor was Catalytic Industrial Maintenance Company. It is followed by a plant-procedure attachment…

  3. Company document · Union Carbide documents · September 19, 1989

    Texas Air Control Board Asbestos Demolition/Renovation Notification Form for Transite Roofing Removal at Union Carbide Texas City Plant (1989)

    A Texas Air Control Board asbestos renovation notification form completed for Union Carbide Corporation's Texas City plant. It lists Catalytic Industrial Maintenance Company as removal contractor and describes removal of transite roofing on the Building…

  4. Company document · Union Carbide documents · August 14, 1989

    Union Carbide Texas City Plant Notification to Texas Air Control Board of Emergency Asbestos Removal from #2 SRC Reflux Drum (1989)

    …signed by Andrew F. Jackson, Aug. 14, 1989 Union Carbide Texas City Plant notice of intention to demolish or renovate a structure containing asbestos (Plant Procedure SH-5.6, Attachment #1), prepared by D. R. Schoen…

  5. Company document · Union Carbide documents · December 1989

    Union Carbide Texas City Plant Asbestos Demolition/Renovation Notices and Texas Air Control Board Forms (1989)

    Union Carbide Texas City Plant internal Notice of Intention to Demolish or Renovate a Structure or Facility Containing Asbestos Material (Attachment 3, Plant Procedure), handwritten, No. 1 Powerhouse Texas Air Control Board Asbestos Demolition/Renovation Notification…

  6. Company document · Union Carbide documents · August 14, 1989

    D. R. Schoen, Notice of Intention to Renovate Asbestos-Containing Structure, #2 SRC Reflux Drum at Building 94, Texas City Plant (1989)

    A completed Texas City Plant form (Plant Procedure SH-5.6, Attachment #1) giving notice of an emergency removal of a vessel, the #2 SRC reflux drum at Building 94, which contained friable asbestos material. The handwritten entries give an estimated…

  7. Company document · Union Carbide documents · March 6, 1989

    Texas City Plant Notice of Intention to Renovate Asbestos-Containing Steam Trap and Pipe, Prepared by D. R. Schoen (1989)

    A completed Texas City Plant form (Plant Procedure SH-S.5, Attachment #1) giving notice of intention to renovate a facility containing asbestos material. It describes a vaporizer steam trap and associated pipe in Bldg. 16, about 10 linear feet of…

  8. Company document · Union Carbide documents · August 14, 1989

    D. R. Schoen, Notice of Intention to Renovate Asbestos-Containing Reflux Drum at Texas City Plant, Building 94 (1989)

    A handwritten-in form (Plant Procedure SH-5.6, Attachment #1) giving notice of an emergency removal of friable asbestos material from the #2 SRC reflux drum at Building 94 at the Texas City Plant. The form records an estimated area, an estimated age…

  9. Company document · Union Carbide documents · May 15, 1990

    Gary D. Dickson to A. P. Yalcinkaya on Asbestos Removal for the 70# Flash Tank, Texas City Plant (1990)

    Internal memo of May 15, 1990 from Gary D. Dickson to A. P. Yalcinkaya giving notice of intention to remove asbestos insulation from the 70# Flash tank at building 16 in the Ethanol area, with an estimated start around June 11, 1990. The attached…