23 results for “Union Carbide Corporation”, page 1 of 2
-
Company document · Union Carbide documents · April 23, 1978
K. Gran Townsend to B. F. Brown, R. C. Glock, E. O. Davis and R. F. Green Transmitting Status of OSHA Health Standards for Chemical Exposure (1978)
A cover memo from K. Gran Townsend of Union Carbide's Chemicals and Plastics unit transmitted an updated summary of OSHA standards activity as of April 1978. The attachment lists completed and proposed OSHA health standards…
-
Company document · Union Carbide documents · August 22, 1979
K. Gran Townsend to Plant Distribution on OSHA Inspection of Brown & Root at Brownsville, with Mario Gutierrez's Inspection Summary (1979)
Cover memo of August 22, 1979 forwarding a summary of an OSHA inspection of contractor Brown & Root at the Brownsville plant, reporting that no citations were given. The attached August 16, 1979 summary to K. G. Townsend describes the August 15…
-
Company document · Union Carbide documents · 1981
Share Audit Procedure and Ventilation Inspection and Audit of Lab Hood, Building 522 Recovery Department (1981)
A Share Audit Procedure form for the Recovery Department's ventilation procedure, dated fourth quarter 1981, with a ventilation inspection and audit checklist for a lab hood in Building 522 Recovery. The audit form marked no deficiency and…
-
Company document · Union Carbide documents · September 27, 1978
L. T. Windel to K. G. Townsend Forwarding the Revised EPA Asbestos Air Pollutant Regulation, 40 CFR 61, Brownsville Plant (1978)
A two-page internal memo from L. T. Windel to K. G. Townsend at the Brownsville, Texas plant forwarding the revised asbestos air pollutant regulation. It notes the EPA notification requirement for removal of asbestos pipe covering and proposes a…
-
Company document · Union Carbide documents · August 22, 1979
K. G. Townsend to A. L. Barefoot and Others Transmitting Summary of OSHA Inspection of Brown & Root at the Brownsville Plant (1979)
A cover memo of August 22, 1979 transmits a summary of an OSHA inspection of Union Carbide's contractor Brown & Root at the Brownsville plant. The attached memo of August 16, 1979, addressed to K. G…
-
Company document · Union Carbide documents · March 30, 1977
J. L. Garcia to B. F. Brown, R. C. Glock, K. G. Townsend and Staff on the EPA Asbestos Standard and Proposed Amendment (1977)
Internal Union Carbide correspondence from the Brownsville, Texas, Chemicals and Plastics location summarizing the EPA national emission standard for asbestos, first promulgated April 6, 1973. It describes the demolition and renovation notification and removal requirements, the…
-
Company document · Union Carbide documents · 1981
Share Audit Procedure and Ventilation Inspection and Audit of Lab Hood, Building 522 Recovery Department (4Q 1981)
A Share Audit Procedure form for the Recovery Department's ventilation procedure, dated 4Q 1981, followed by a Ventilation Inspection and Audit checklist for a lab hood in Building 522 Recovery. The form records no deficiency, says the procedure is…
-
Company document · Union Carbide documents · August 20, 1975
C. A. Keil to Energy Area Staff on Pre-Startup Safety Review of #2 Steam Turbine Generator Lube Oil System, Brownsville (1975)
Internal correspondence from the Brownsville, Texas Chemicals and Plastics site, dated August 20, 1975, naming a team to conduct a pre-startup safety review of the new #2 steam turbine generator oil reservoir installation. It sets the review for…
-
Company document · Union Carbide documents · October 5, 1978
B. F. Brown, R. C. Glock and W. W. McManus to All Brownsville Plant Employees on the OSHA Inspection Results (1978)
…employees reporting the result of a four-day OSHA inspection of the plant covering Union Carbide and Brown & Root. It states the result was one alleged minor violation for Union Carbide and none for Brown & Root…
-
Company document · Union Carbide documents · August 22, 1979
K. G. Townsend to Distribution on OSHA Inspection of Contractor Brown & Root at Brownsville Plant, with Attached Inspection Summary (1979)
A cover memo of August 22, 1979 forwards a summary of an OSHA inspection of Union Carbide's contractor Brown & Root at the Brownsville, Texas plant and says no citations were given. The attached August 16…
-
Company document · Union Carbide documents · 1981
Share Audit Procedure and Hearing Protection, Noise and Ventilation Inspection Forms, Maintenance Department (4Q 1981)
Set of mostly handwritten-fill audit forms for the Maintenance Department, fourth quarter 1981, covering the ventilation, noise and hearing protection procedure. The summary form records 10 personnel interviewed, no deficiency, and a re-audit set…
-
Company document · Union Carbide documents · April 10, 1981
K. G. Townsend to R. E. Theisen Transmitting Energy/Oxygen Hearing Protection and Noise Audit Results, Brownsville (1981)
A cover memo of April 10, 1981 from K. Gran Townsend to R. E. Theisen forwards the SHARE Department's hearing protection audit results for the Energy/Oxygen departments and asks that deficiencies be corrected. The attached forms, dated 4/6/81, are a…
-
Company document · Union Carbide documents · 1981
SHARE Audit of Ventilation, Sanitation and Breathing Air Procedures, Reaction Department (4Q 1981)
A set of completed SHARE audit forms for the Reaction department, fourth quarter 1981, covering ventilation (lab hoods), breathing air and sanitation. The cover sheet records that no deficiency existed, 6 personnel were interviewed, and retraining…
-
Company document · Union Carbide documents
Share Audit Procedure Form for Sanitation Procedure, Employee Relations Department (4Q 1981)
A one-page "Share Audit Procedure" form for the Employee Relations department's Sanitation procedure, dated 4th quarter 1981 in handwriting. Two personnel were interviewed; the form records that the procedure is in the OH Manual, that no deficiency…
-
Company document · Union Carbide documents · 1981
Share Audit Procedure Form for Laboratory Ventilation Procedure (1981)
A one-page Share Audit Procedure form for the Laboratory department covering its ventilation procedure. Two personnel were interviewed; the form records that no deficiency exists, the procedure is up to date in the I.H. & O.H. Procedures Manual, and…
-
Company document · Union Carbide documents · 1981
Share Audit Procedure and Detector Tube Inspection and Audit, Distribution Department (4Q 1981)
A two-page audit packet for the Distribution department dated 4Q 1981. The Share Audit Procedure form covers the 'Detector Tube System Control' procedure, and the attached Detector Tubes Inspection and Audit sheet lists 21 gas detector tube types…
-
Company document · Union Carbide documents · 1981
Share Audit Procedure Form for Maintenance Department Asbestos Handling Procedure (1981)
A one-page Share Audit Procedure form for the Maintenance department, covering the procedure named "Asbestos Handling," which is referenced in the Maintenance Procedures Manual. Five personnel were interviewed. The form is marked that no deficiency…
-
Company document · Union Carbide documents · April 6, 1981
Share Audit Procedure and Noise and Hearing Protection Inspection Audit Forms, Energy/Oxygen Department (1981)
A set of filled-in internal audit forms for the Energy/Oxygen department dated April 1981. It has a Share Audit Procedure sheet on the hearing protection procedure, noise inspection and audit checklists, and hearing protection inspection checklists,…
-
Company document · Union Carbide documents
Share Audit Procedure Blank Form (undated)
A blank one-page form titled 'Share Audit Procedure' with a copy list. It has fields for department, date, whether a deficiency exists, the name of the procedure, where the written reference is found, and the number of personnel interviewed. It asks…
-
Company document · Union Carbide documents · March 25, 1981
Share Audit Procedure Form for Maintenance Department on Proper Handling and Disposal of Asbestos (1981)
A one-page "Share Audit Procedure" form for the Maintenance department dated 3/25/81, covering the procedure "Proper Handling & Disposal of Asbestos" (reference MF-II-6.2). Five personnel were interviewed; all were marked as aware of, understanding…