No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

3 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents · June 21, 1979

    L. R. Noble Memo to D. E. Raines on Safety Inspection of the Insulation Fabrication Shop, Building 2018, with Handwritten Follow-up Notes (1979)

    …Randy Noble, responding to inspection items #2, #3 and #4 (Industrial Hygiene dust evaluation, replacing the protective pole, 15 mg/m3 nuisance dust limit and respirator use) Typed Union Carbide memo, June 21, 1979, L. R…

  2. Company document · Union Carbide documents · June 20, 1984

    M. A. Patel to D. E. Raines on Dust and Chemicals Exposure Monitoring in the Insulation Shop, Building 2018 (1984)

    Memorandum reporting a March-April 1984 Technical Center industrial hygiene survey of dust and chemical exposures in the Insulation Shop, Building 2018. It states that dust, benzene-soluble particulate, and chemical results were generally below…

  3. Company document · Union Carbide documents · November 18, 1981

    M. A. Patel to P. P. Price and D. E. Raines on Dust Monitoring in the Institute Plant Insulation Shop (1981)

    Internal correspondence reporting October 1981 airborne dust monitoring in the Institute Plant Construction Department insulation shop, where KAYLO-10 and perlite insulation blocks were sawed and handled. The memo says air levels were generally…