No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

53 results for “Union Carbide Corporation”, page 1 of 3

  1. Company document · Union Carbide documents · April 28, 1980

    Industrial Hygiene Monitoring for Asbestos at #1 Powerhouse, Institute: Insulation Stripping and Bagging Results for Jividen, Cobb and Grant (1980)

    Three industrial hygiene monitoring forms dated 4/28/80 report airborne asbestos fiber sampling at the #1 Powerhouse at Institute while insulation was stripped from steam lines on the #1 boiler and bagged for disposal. Sample results are given for…

  2. Company document · Union Carbide documents · September 12, 1980

    G. F. Hurley to L. R. Noble, H. L. Robinson, E. C. Shipley and F. Williams on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)

    Letter-style memo reporting asbestos air monitoring in the SEVIN operations area on September 3, 1980, which showed 0.1 fiber per cc, described as well below the OSHA standard. Six breathing-zone samples were taken on three men, but only one valid…

  3. Company document · Union Carbide documents · August 5, 1980

    Industrial Hygiene Monitoring for Asbestos: Air Samples for J. W. Greenlee and R. E. Raines, Building 707 (1980)

    Two Industrial Hygiene Monitoring for Asbestos forms dated 8/5/80, each reporting one air sample taken in Bldg. 707, Fourth Level, Cell 11, during stripping and bagging of suspected asbestos-containing insulation from about 50 feet of steam line.…

  4. Company document · Union Carbide documents · August 19, 1980

    Industrial Hygiene Monitoring for Asbestos Reports to W. T. Shelton on Insulation Stripping in Bldg. 706 (1980)

    Two industrial hygiene monitoring forms for asbestos dated 8/19/80, each reporting one air sample taken in Bldg. 706 (West End, second and third level) while a worker stripped and bagged insulation on the G-101 autoclave and adjacent lines. The…

  5. Company document · Union Carbide documents · September 12, 1980

    G. F. Hurley to B. E. Bess and Others on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)

    Letter reporting asbestos air monitoring in the SEVIN operations area on September 3, 1980, which showed 0.1 fiber per cc. Six breathing-zone samples were taken on three men, but an analytical error left only one valid sample, for Mr. Smith. The…

  6. Company document · Union Carbide documents · September 12, 1980

    G. F. Hurley to B. E. Bess, P. W. Young and Others on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)

    Letter reporting that asbestos monitoring in the SEVIN operations area on September 3, 1980 showed 0.1 fiber per cc, which it described as below the present OSHA standard. Six breathing-zone samples were taken on three men, but because of an…

  7. Company document · Union Carbide documents · September 12, 1980

    G. F. Hurley to B. E. Bess and Others on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)

    Letter-style memo dated September 12, 1980, reporting asbestos air monitoring in the SEVIN operations area on September 3, 1980, which showed 0.1 fiber per cc. It states that six breathing-zone samples were taken on three men, but only one valid…

  8. Company document · Union Carbide documents · September 2, 1982

    Industrial Hygiene Monitoring Reports for Asbestos on Insulation Stripping in Building 707, to W. T. Shelton (1980-1982)

    Five one-page 'Industrial Hygiene Monitoring for Asbestos' forms addressed to W. T. Shelton of the 704 Shop. They report air-sample fiber concentrations for workers stripping insulation from steam and Dowtherm lines in Building 707, with dates from…

  9. Company document · Union Carbide documents · November 24, 1980

    Industrial Hygiene Monitoring for Asbestos: Powerhouse Steam Line Stripping, Bldg. 704, to W. T. Shelton (1980)

    One-page industrial hygiene monitoring form for asbestos dated 11/24/80. It reports personal air samples for R. E. Raines (.07 fibers/cc) and John Greenlee (.13 fibers/cc), each taken over 41 minutes in the Building 704 Powerhouse basement while…

  10. Company document · Union Carbide documents · October 20, 1980

    Industrial Hygiene Monitoring for Asbestos: Two Reports to W. T. Shelton on Stripping Insulation from the Dowtherm System, Bldg. 702 (1980)

    Two industrial hygiene monitoring forms dated 10/20/80 reporting asbestos fiber samples taken outside Bldg. 702 while workers stripped and bagged insulation from a Dowtherm system. J. E. Hackney's sample was 3.04 fibers >5 µm/cm3 over 57 minutes,…

  11. Company document · Union Carbide documents · July 3, 1980

    Industrial Hygiene Monitoring for Asbestos: Cooling Tower Insulation Stripping, Building 789, to R. F. Painter (1980)

    Three industrial hygiene monitoring forms for asbestos dated 7/3/80, reporting air samples taken on workers stripping and bagging cooling tower insulation in the basement of Building 789. Morning sample results were .3, .7 and .3 fibers >5 µm/cm3;…

  12. Company document · Union Carbide documents · October 5, 1978

    C. W. Carman to E. R. Levy on Review Meeting of Personnel Safety and Health Training Packages (1978)

    Memo dated October 5, 1978 from C. W. Carman to E. R. Levy, with copies to ten others, giving his comments on the personnel safety and health training elements discussed at a September 25, 1978 meeting. It lists suggestions from George Hurley, J. M.…

  13. Company document · Union Carbide documents · September 9, 1980

    Industrial Hygiene Monitoring for Asbestos Report to W. T. Shelton on Insulation Stripping in Building 705, Cell 8 (1980)

    A one-page industrial hygiene monitoring form for asbestos covering Services Insulators stripping old insulation in Building 705, Cell 8, on 9/9/80. It records two air samples (1.17 and 1.30 fibers, 24 minutes at 2 LPM), lists the OSHA allowable…

  14. Company document · Union Carbide documents · March 26, 1980

    W. F. Blythe Jr. to W. T. Shelton on Asbestos Monitoring in Building 770 (1980)

    Internal Union Carbide memo reporting a March 19, 1980 survey of insulators' exposure to asbestos while removing asbestos insulation tape from tubing in Room 237 of Building 770. It states all samples showed less than 0…

  15. Company document · Union Carbide documents · November 16, 1979

    Technical Center IH/EP (Ruth Clise) to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse (1979)

    Internal industrial hygiene report on air sampling done October 26, 1979 while Construction workers stripped and bagged asbestos-containing insulation from an exhaust duct in the Building 704 Powerhouse in South Charleston. It reports that dust on…

  16. Company document · Union Carbide documents · December 5, 1978

    G. F. Hurley and M. E. Perry to Distribution on Clarification of Monitoring for Removal and Disposal of Asbestos-Containing Insulation (1978)

    A December 5, 1978 memorandum from G. F. Hurley and M. E. Perry to a distribution list clarifying items 1 and 2 of a November 6, 1978 Merz/Perry letter on removal and disposal of asbestos-containing insulation. It states that the Industrial Hygiene…

  17. Company document · Union Carbide documents · July 3, 1980

    Industrial Hygiene Monitoring for Asbestos: Cooling Tower Insulation Stripping, Building 789, to R. F. Painter (1980)

    Three industrial hygiene monitoring forms for asbestos, each dated 7/3/80, reporting air samples taken in the basement of Bldg. 789 (cooling tower) while insulation was stripped and bagged. A.M. sample results were .3 (C. Miller), .7 (D. C.…

  18. Company document · Union Carbide documents · October 2, 1979

    Ruth Clise to W. T. Shelton on Asbestos Monitoring of Insulation Stripping in Building 720, South Charleston (1979)

    Internal memo reporting breathing zone air sampling taken September 19, 1979 on two workers, J. R. Monin and J. W. Greenlee, while they stripped about 40 feet of suspected asbestos steamline insulation in the basement of Building 720. It reported…

  19. Company document · Union Carbide documents · July 3, 1980

    Industrial Hygiene Monitoring for Asbestos: Cooling Tower Insulation Stripping, Building 789, to R. F. Painter (1980)

    Three industrial hygiene monitoring forms dated 7/3/80 report airborne fiber results for workers stripping and bagging insulation in the basement of Building 789 (cooling tower). The A.M. samples were .7, .3 and .3 fibers >5 µm/cm3; the P.M. samples…

  20. Company document · Union Carbide documents · May 24, 1979

    G. F. Hurley to Dr. R. J. Sexton and C. C. Smith, Jr. on Medical Exams for Craftsworkers Exposed to Asbestos (1979)