2 results for “Ford Motor Company”
-
Company document · Union Carbide documents · August 25, 1980
Industrial Hygiene Monitoring for Asbestos: Insulation Stripping and Bagging at Bldg. 777, Addressed to R. F. Painter (1980)
Monitoring form for C. Miller: two samples (0.1 and 5 µm/cm3) during insulation stripping, 8/25/80 Monitoring form for D. C. Shamblin: two samples (0.1 and 0.2) during insulation stripping, 8…
-
Company document · Union Carbide documents · August 1980
Ruth Clise to R. F. Painter: Industrial Hygiene Monitoring Reports for Asbestos During Insulation Stripping in Bldg. 777 (1980)
…E. Templeton, Bldg. 777 elevator shaft area, 8/25/80, bagging insulation (UCC 016638) Monitoring report (W-1078) for D. C. Shamblin, same location, 8/25/80, stripping insulation (UCC 016638A) Monitoring report (W-1078) for…