No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

15 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents · August 6, 1981

    Industrial Hygiene Monitoring for Asbestos: R. E. Raines, Building 701 Storeroom, Report to W. T. Shelton (1981)

    One-page Union Carbide industrial hygiene monitoring form for asbestos, dated August 6, 1981. It reports one 45-minute personal sample of 0.089 fibers/cc taken on August 5, 1981 on an insulator (R. E…

  2. Company document · Union Carbide documents · August 19, 1980

    Industrial Hygiene Monitoring for Asbestos Reports to W. T. Shelton on Insulation Stripping in Bldg. 706 (1980)

    Two industrial hygiene monitoring forms for asbestos dated 8/19/80, each reporting one air sample taken in Bldg. 706 (West End, second and third level) while a worker stripped and bagged insulation on the G-101 autoclave and adjacent lines. The…

  3. Company document · Union Carbide documents · September 2, 1982

    Industrial Hygiene Monitoring Reports for Asbestos on Insulation Stripping in Building 707, to W. T. Shelton (1980-1982)

    Five one-page 'Industrial Hygiene Monitoring for Asbestos' forms addressed to W. T. Shelton of the 704 Shop. They report air-sample fiber concentrations for workers stripping insulation from steam and Dowtherm lines in Building 707, with dates from…

  4. Company document · Union Carbide documents · November 24, 1980

    Industrial Hygiene Monitoring for Asbestos: Powerhouse Steam Line Stripping, Bldg. 704, to W. T. Shelton (1980)

    One-page industrial hygiene monitoring form for asbestos dated 11/24/80. It reports personal air samples for R. E. Raines (.07 fibers/cc) and John Greenlee (.13 fibers/cc), each taken over 41 minutes in the Building 704 Powerhouse basement while…

  5. Company document · Union Carbide documents · October 20, 1980

    Industrial Hygiene Monitoring for Asbestos: Two Reports to W. T. Shelton on Stripping Insulation from the Dowtherm System, Bldg. 702 (1980)

    Two industrial hygiene monitoring forms dated 10/20/80 reporting asbestos fiber samples taken outside Bldg. 702 while workers stripped and bagged insulation from a Dowtherm system. J. E. Hackney's sample was 3.04 fibers >5 µm/cm3 over 57 minutes,…

  6. Company document · Union Carbide documents · July 30, 1981

    Industrial Hygiene Monitoring Reports for Asbestos Insulation Stripping, Bldg. 770-137, to W. T. Shelton (1981)

    Two Union Carbide industrial hygiene monitoring forms for asbestos, dated July 30, 1981, reporting personal air sampling on two workers in Bldg. 770-137 on 07/24/81. One sample measured .3 fibers >5 µm/cm3…

  7. Company document · Union Carbide documents · September 9, 1980

    Industrial Hygiene Monitoring for Asbestos Report to W. T. Shelton on Insulation Stripping in Building 705, Cell 8 (1980)

    A one-page industrial hygiene monitoring form for asbestos covering Services Insulators stripping old insulation in Building 705, Cell 8, on 9/9/80. It records two air samples (1.17 and 1.30 fibers, 24 minutes at 2 LPM), lists the OSHA allowable…

  8. Company document · Union Carbide documents · April 22, 1981

    Industrial Hygiene Monitoring for Asbestos Reports to W. T. Shelton on Powerhouse Insulation Stripping, Bldg. 704 (1981)

    Two industrial hygiene monitoring forms dated 4/22/81 reporting airborne asbestos sampling on 4/21/81 in the Building 704 Powerhouse while insulators stripped old insulation from about 17 feet of steam line on the #2 boiler. Page 1 reports a…

  9. Company document · Union Carbide documents · December 5, 1978

    G. F. Hurley and M. E. Perry to Distribution on Clarification of Monitoring for Removal and Disposal of Asbestos-Containing Insulation (1978)

    A December 5, 1978 memorandum from G. F. Hurley and M. E. Perry to a distribution list clarifying items 1 and 2 of a November 6, 1978 Merz/Perry letter on removal and disposal of asbestos-containing insulation. It states that the Industrial Hygiene…

  10. Company document · Union Carbide documents · July 30, 1981

    Industrial Hygiene Monitoring for Asbestos: Insulator Stripping and Bagging Samples for J. W. Greenlee and J. R. Monin, Bldg. 770-137 (1981)

    Two industrial hygiene monitoring reports for asbestos, dated July 30, 1981, each reporting a single air sample taken on 07/24/81 in Bldg. 770-137. One covers J. W. Greenlee stripping about 60 feet of insulation from a steamline (.3 fibers >5…

  11. Company document · Union Carbide documents · October 2, 1979

    Ruth Clise to W. T. Shelton on Asbestos Monitoring of Insulation Stripping in Building 720, South Charleston (1979)

    Internal memo reporting breathing zone air sampling taken September 19, 1979 on two workers, J. R. Monin and J. W. Greenlee, while they stripped about 40 feet of suspected asbestos steamline insulation in the basement of Building 720. It reported…

  12. Company document · Union Carbide documents · December 5, 1978

    G. F. Hurley and M. E. Perry to Distribution on Clarification of Asbestos Insulation Removal and Monitoring Rules, South Charleston (1978)

    Memorandum clarifying items 1 and 2 of a November 6, 1978 Merz/Perry letter on removal and disposal of asbestos-containing insulation. It stated when the Industrial Hygiene Group would decide on personal asbestos monitoring during demolition,…

  13. Company document · Union Carbide documents · April 1, 1980

    Industrial Hygiene Monitoring for Asbestos: Air Samples for R. E. Raines and J. W. Greenlee Stripping Insulation, Bldg. 773, Report to W. T. Shelton (1980)

    Two Industrial Hygiene Monitoring for Asbestos forms dated 4/1/80, each recording personal air samples taken in Bldg. 773 while a worker stripped and bagged insulation from a 3-inch condensate line. Page 1 covers R. E. Raines and page 2 covers J. W.…

  14. Company document · Union Carbide documents · August 19, 1980

    Industrial Hygiene Monitoring for Asbestos, Reports to W. T. Shelton on Insulation Stripping at Bldg. 706 (1980)

    Two industrial hygiene monitoring forms dated 8/19/80, each reporting one personal air sample for asbestos taken at Bldg. 706, West End, second and third level, during stripping and bagging of insulation on the G-101 autoclave and adjacent lines.…

  15. Company document · Union Carbide documents · October 20, 1980

    Industrial Hygiene Monitoring for Asbestos: Results for J. E. Hackney and R. P. Hess Stripping Dowtherm System Insulation, sent to W. T. Shelton (1980)

    Two industrial hygiene monitoring forms for asbestos dated 10/20/80, addressed to W. T. Shelton of the 704 Shop. Each reports a one-sample fiber result for a worker (J. E. Hackney, 3.04 fibers over 57 minutes; R. P. Hess, 1.3 fibers over 60 minutes)…