No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

2 results for “General Electric”

  1. Company document · Union Carbide documents · November 3, 1972

    K. G. Brink to Plant Letter Lists on Procedure for Removal of Asbestos Insulation at Seadrift (1972)

    …letter lists on removing asbestos insulation. It sets minimum and maximum respirator and protective requirements tied to OSHA fiber limits, handling and disposal rules for scrap, and general considerations. It is signed by K. G. Brink.

  2. Company document · Union Carbide documents · November 3, 1972

    K. G. Brink to Plant Letter Lists: Procedure for Removal of Asbestos Insulation (1972)

    …lists, signed by K. G. Brink, on removing asbestos insulation within OSHA limits. It sets minimum and maximum respirator and protective requirements, rules for bagging, labeling and disposing of scrap, and general considerations for the work.