12 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · March 19, 1982
Industrial Hygiene Monitoring for Asbestos, Building 701-100 Insulation Cleanup, Reported to J. E. Midkiff (1982)
Four pages of Union Carbide industrial hygiene monitoring reports (computer refs. W-1401, W-1402, W-1405) dated March 19, 1982, giving airborne asbestos fiber results for workers Warren Abbot, Paul Crowder and Dave Shamblin during…
-
Company document · Union Carbide documents · July 17, 1981
Industrial Hygiene Monitoring for Asbestos: R. F. Painter Report on Insulation Stripping and Bagging, Bldg. 774 (1981)
Four 'Industrial Hygiene Monitoring for Asbestos' forms (Computer Ref. W-1198), dated July 17, 1981 and stamped Business Confidential. They report AM and PM personal air samples for four workers on 07/10/81 during stripping and bagging of insulation…
-
Company document · Union Carbide documents · July 16, 1982
Manhar A. Patel to J. C. Smith on Dust and MEK Monitoring in the Sandblast Shed, 511 Construction Institute Plant (1982)
Internal Union Carbide letter reporting dust sampling for 'Black Beauty' in the Sandblast Shed and methyl ethyl ketone (MEK) sampling in the Paint Preparation Shed at the 511 Construction Institute Plant, May-June 1982. It says…
-
Company document · Union Carbide documents · October 20, 1981
M. A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Gasket Shop, Institute Plant (1981)
Internal memo reporting area and personal asbestos exposure monitoring in the Gasket Shop (laundry, Building 3 of the Construction Department) at the Institute Plant, done by the plant's industrial hygiene group on October 2 and 9, 1981. It states…
-
Company document · Union Carbide documents · April 26, 1982
Mark E. Bell to R. F. Painter: Industrial Hygiene Monitoring for Asbestos, D. C. Shamblin, Building 706 (1982)
Union Carbide 'Industrial Hygiene Monitoring for Asbestos' form, Computer Ref. W-1315, reporting air sampling of D. C. Shamblin in Building 706 on 4/21/82. It lists a personal sample of 1.2 fibers >5…
-
Company document · Union Carbide documents · November 13, 1987
M. A. Patel to P. L. Graham et al. on Respiratory Protection for Asbestos, with 1984 R. G. Hanlon Memo and DuPont Respirator Study Figures (1987)
A November 13, 1987 internal memo from Manhar A. Patel forwarded a DuPont study of respirator performance against asbestos fibers and continued to recommend 3M respirators. Attached were a November 6, 1984 Richard G. Hanlon memo on the same subject,…
-
Company document · Union Carbide documents · February 1, 1982
M. E. Bell and G. W. Bott to W. T. Shelton: Asbestos Monitoring of Insulators Wheeler and Agosti at 704 Powerhouse (1982)
Two Union Carbide 'Industrial Hygiene Monitoring for Asbestos' forms dated Feb. 1, 1982 (Computer Ref. W-1274), reporting personal air samples taken 1/26/82 at the 704 Powerhouse while two insulators stripped insulation. The results…
-
Company document · Union Carbide documents · November 22, 1983
Manhar A. Patel to D. R. Paugh Transmitting the 1984 Industrial Hygiene Program for the 511 Construction Department (1983)
Internal Union Carbide correspondence from Manhar A. Patel transmitting a 1984 industrial hygiene program for the 511 Construction Department. The attached program lists planned exposure monitoring by shop and frequency, including dust in the insulation shop…
-
Company document · Union Carbide documents · October 23, 1981
M. A. Patel to W. L. Browning, J. W. Perry Jr. and Others on Asbestos Monitoring in the Gasket Shop, 512 Construction, Institute Plant, with Replacement Letter and Data Sheet (1981)
Internal Union Carbide correspondence from Manhar A. Patel. A cover note says an October 20, 1981 letter on asbestos monitoring in the Institute Plant gasket shop contained an error and should be replaced. The replacement letter…
-
Company document · Union Carbide documents · January 19, 1984
M. A. Patel to M. L. Mills on Identification of an Unknown Material at the Institute Plant, with L. D'Esposito's IR Spectrum Memo (1984)
Internal Union Carbide correspondence from January 1984 about a white powdery material found oozing from the floor of the field toilet in the construction shop area at the Institute plant. An R/D memo reported an…
-
Company document · Union Carbide documents · June 21, 1983
Manhar A. Patel to R. C. Proffitt on Asbestos Monitoring in the Storeroom, 511 Construction Department (1983)
Internal Union Carbide correspondence reporting a May 9, 1983 industrial hygiene monitoring survey of asbestos dust exposure while an employee handled asbestos spiral-wound gaskets in the 512 Construction Department storeroom. It reports that exposure above…
-
Company document · Union Carbide documents · April 26, 1982
Mark E. Bell to R. F. Painter on Industrial Hygiene Asbestos Monitoring of Insulation Stripping in Building 706, D. C. Shamblin and R. E. Templeton (1982)
Two Union Carbide industrial hygiene monitoring forms dated April 26, 1982, reporting asbestos air samples taken April 21, 1982 in Building 706 while insulators stripped insulation from a steam line and condensate line. Page 1 reports…