No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

12 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents · June 12, 1973

    W. C. Thurber to V. D. Holt on Implementation of Tuck-In Sleeve Packaging for Asbestos Bags (1973)

    Internal memo from W. C. Thurber to V. D. Holt saying the present asbestos bags let small quantities of material dribble from the fill hole, creating dust and clean-up problems in customers' plants. It reports preliminary work on tuck-in sleeves and…

  2. Company document · Union Carbide documents · December 23, 1974

    W. C. Thurber to Distribution on Current Status of Plans for Expanding the King City Asbestos Plant, with Attached Earlier Memos (1974)

    A December 23, 1974 memo updating a June 19, 1974 memo on plans to expand the King City asbestos plant to 60,000 T/yr. It reports cost estimates, two financial cases, land acquisition efforts for tailings disposal, and a decision to defer…

  3. Company document · Union Carbide documents · July 29, 1974

    W. C. Thurber to F. H. Larrison and Others on Housekeeping Test in the King City Bagging Area to Meet OSHA Fiber Limit (1974)

    Memo from W. C. Thurber stating that OSHA regulations require the dust level at the King City operation to be below two fibers per cc after July 1, 1976, and that recent dust counts showed the main circuit bagging area as the principal problem. He…

  4. Company document · Union Carbide documents · January 14, 1974

    W. C. Thurber to F. H. Larrison and Others Confirming RG-244 Packaging Changes (1974)

    Memo from W. C. Thurber confirming discussions of January 11, 1974 on packaging of RG-244. It says cardboard shrouds will be dropped once inventory is used up and that 3-ply bags will give way to slightly larger two-ply bags. It also covers gluing…

  5. Company document · Union Carbide documents · November 27, 1973

    R. E. Byrne, Jr. Informal Report on TiO2 Contamination of RG-244 During the T-135 Plant Run (1973)

    Informal report describing TiO2 contamination found in RG-244 asbestos produced during the August 15-22, 1973 T-135 plant run at King City. It reports TiO2 levels up to almost 3%, no correlation between TiO2 content and thickening efficiency, sales…

  6. Company document · Union Carbide documents · December 6, 1973

    B. L. Ingalls Project Report on Shrink-Wrap Packaging Tests for Calidria Bags and Pallets (1973)

    …tests, with Tables I and II, cost information and conclusions Union Carbide Films-Packaging Division sheet on pallet wrapping for outdoor storage, with outdoor exposure test charts Sample cost calculations for bag and pallet shrink-film

  7. Company document · Union Carbide documents · September 19, 1973

    G. L. Dickson to J. L. Myers on Evaluation of the King City RG-244 Production Facility, with Attached Report (1973)

    Internal memo from G. L. Dickson to J. L. Myers, with an attached report, summarizing a three-week visit to the King City plant in August 1973. It concluded that only a 5-10% increase in RG-244 production was possible from present facilities and…

  8. Company document · Union Carbide documents · November 21, 1973

    G. L. Dickson to R. O. Marsten on Sodium Silicate Usage in King City RG-244 Production (1973)

    Internal memo from G. L. Dickson to R. O. Marsten at King City comparing the amount of sodium silicate used in producing RG-244 with the theoretical requirement. The attached Table I lists monthly RG-244 production, sodium silicate usage and…

  9. Company document · Union Carbide documents · January 21, 1974

    D. G. Millenbruch to F. H. Larrison and Others on the King City Value Engineering Team (1974)

    Internal Union Carbide letter announcing a "Value Engineering Team" formed to examine increasing production from the King City plant. It set a team meeting in King City on February 12, 1974, asked for motel reservations for…

  10. Company document · Union Carbide documents · October 23, 1974

    H. B. Rhodes Transmittal and Report 'Supervisbestos – A Review of Product Quality Trends and Competitive Market Position' (1974)

    Internal cover memo from H. B. Rhodes transmitting his report on Supervisbestos, the Calidria asbestos drilling-mud additive sold through distributor Montello. The report compares Supervisbestos, Visbestos, Flosal and Atlas 1092 in mixing tests and…

  11. Company document · Union Carbide documents · June 12, 1973

    W. C. Thurber to V. D. Holt on Implementation of Tuck-In Sleeve Packaging for Asbestos Bags (1973)

    Internal memo of June 12, 1973 in which W. C. Thurber asked V. D. Holt to investigate with the plant a tuck-in sleeve design for asbestos bags. It says material dribbled from the fill hole of the present bags, creating dust and clean-up problems in…

  12. Company document · Union Carbide documents · June 27, 1973

    Technology Department to W. C. Thurber on King City Project List and Priorities (1973)

    Internal memo from the Technology Department at Niagara Falls to W. C. Thurber, following a June 25, 1973 telephone call, listing new and existing engineering projects for the King City plant with status, cost and schedule notes. It covers items…