19 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · July 9, 1976
John L. Myers to W. C. Thurber on Packaging and Transportation Problems with Asbestos Dust (1976)
Internal memo from John L. Myers of the Calidria Asbestos department to W. C. Thurber, with copies to several others, about customer complaints on dusty asbestos packaging and shipping. Myers recommended shrink-wrapping all bagged products, bag…
-
Company document · Union Carbide documents · November 27, 1973
R. E. Byrne, Jr. Informal Report on TiO2 Contamination of RG-244 During the T-135 Plant Run (1973)
Informal report describing TiO2 contamination found in RG-244 asbestos produced during the August 15-22, 1973 T-135 plant run at King City. It reports TiO2 levels up to almost 3%, no correlation between TiO2 content and thickening efficiency, sales…
-
Company document · Union Carbide documents · December 6, 1973
B. L. Ingalls Project Report on Shrink-Wrap Packaging Tests for Calidria Bags and Pallets (1973)
…tests, with Tables I and II, cost information and conclusions Union Carbide Films-Packaging Division sheet on pallet wrapping for outdoor storage, with outdoor exposure test charts Sample cost calculations for bag and pallet shrink-film
-
Company document · Union Carbide documents · May 23, 1975
J. L. Myers to F. H. Larrison on June Calidria Sales Estimates, with G. L. Dickson to R. E. Byrne on SG-210 and HPO Projected June Sales (1975)
Two internal Union Carbide memos, both dated May 23, 1975, on expected June 1975 Calidria asbestos orders. Myers' memo to Larrison lists customer orders by grade (SG-101 to SG-104, SX-24, CSV) and the…
-
Company document · Union Carbide documents · November 26, 1975
R. E. Byrne, Jr. to F. H. Larrison on December Production and Shipping Schedules for Calidria Asbestos (1975)
Internal Metals Division memo transmitting weekly production and shipping schedules for Calidria asbestos for December 1975, noting five weeks for production, ten bulk cars of SG-104 scheduled, and sixty tons of T-135-0 to be postponed to January if…
-
Company document · Union Carbide documents · March 23, 1972
H. B. Rhodes to R. E. Byrne, Jr. and Others Transmitting Product Information Questionnaire for Chrysotile Asbestos (1972)
…transmitting a Product Information Questionnaire prepared for a specific customer and said to be cleared by legal and medical staff in New York. The attached questionnaire gives Union Carbide's answers on chrysotile asbestos (Imcobest, Visbestos…
-
Company document · Union Carbide documents · September 19, 1973
G. L. Dickson to J. L. Myers on Evaluation of the King City RG-244 Production Facility, with Attached Report (1973)
Internal memo from G. L. Dickson to J. L. Myers, with an attached report, summarizing a three-week visit to the King City plant in August 1973. It concluded that only a 5-10% increase in RG-244 production was possible from present facilities and…
-
Company document · Union Carbide documents · March 23, 1976
B. L. Ingalls to G. L. Dickson on Corrosion Attributed to HPO Calidria Asbestos in Metal Substrate Applications at Parr Inc. and Rapid Systems Co. (1976)
Memo updating the status of Union Carbide's investigation of corrosion problems that Parr Inc. and Rapid Systems Co. in Ohio attributed to HPO (Calidria) chrysotile used in metal substrate applications. It reports that Rapid Systems…
-
Company document · Union Carbide documents · August 8, 1973
H. B. Rhodes to J. L. Myers on Inspection of RG-244 Calidria Bags with Tuck-In Sleeves at the Atlanta Warehouse (1973)
Internal correspondence reporting J. E. Walsh's inspection of four pallets of RG-244 Calidria asbestos in new bags with tuck-in sleeves at the Atlanta warehouse. It reports no loose material on any pallet, small amounts of pressed asbestos on 5 of…
-
Company document · Union Carbide documents · June 1, 1976
John L. Myers to W. C. Thurber Transmitting the Calidria Asbestos 5-Year Sales Forecast (1976)
Internal Metals Division memo from John L. Myers to W. C. Thurber enclosing a 5-year forecast for Calidria asbestos, with back-up sheets for higher-volume products and export sales. The memo lists RG-600 sales estimates for 1977-1981 separately and…
-
Company document · Union Carbide documents · June 1, 1972
R. E. Byrne, Jr. to F. H. Larrison on New Interim Plant Control Limits for RG-244, RG-244X and SX-24 (1972)
Internal correspondence from the Research and Development Department to the King City plant listing new interim plant control limits for RG-244, RG-244X and SX-24 (moisture, wet screen, pH, polyester viscosity, TiO2). The memo says the changes were…
-
Company document · Union Carbide documents · May 6, 1976
John L. Myers to W. C. Thurber on April 1976 Calidria Sales Compared with Forecast II (1976)
Internal memo from John L. Myers to W. C. Thurber comparing unofficial April 1976 Calidria sales with first-quarter actuals and 2Q Forecast II monthly averages. It reports export sales above forecast and domestic sales below, discusses shortfalls at…
-
Company document · Union Carbide documents · October 23, 1974
H. B. Rhodes Transmittal and Report 'Supervisbestos: A Review of Product Quality Trends and Competitive Market Position' (1974)
A one-page internal memo from H. B. Rhodes transmitting a 1974 report on Supervisbestos, the Calidria asbestos mud additive sold for oil well drilling through Montello. The report reviews product quality trends from 1971 to 1974 and the competitive…
-
Company document · Union Carbide documents · February 4, 1975
R. E. Byrne, Jr. to F. H. Larrison Forwarding National Gypsum (Matteson, IL) Complaint on Damaged Pallets of SG-210 (1975)
Internal Union Carbide memo from R. E. Byrne, Jr. to F. H. Larrison attaching a January 27, 1975 letter and photographs from National Gypsum's Gold Bond plant in Matteson, IL about car SSW 47542 of…
-
Company document · Union Carbide documents · January 28, 1976
R. E. Byrne, Jr. to F. H. Larrison and Others Transmitting February 1976 Production and Shipping Schedules for Calidria Asbestos (1976)
A January 28, 1976 cover memo from R. E. Byrne, Jr. to F. H. Larrison and others attached the February 1976 production and shipping schedules for Calidria asbestos. The memo asked that seven bulk cars of SG-104 be scheduled to maximize plant output…
-
Company document · Union Carbide documents · October 23, 1974
H. B. Rhodes Transmittal and Report 'Supervisbestos – A Review of Product Quality Trends and Competitive Market Position' (1974)
Internal cover memo from H. B. Rhodes transmitting his report on Supervisbestos, the Calidria asbestos drilling-mud additive sold through distributor Montello. The report compares Supervisbestos, Visbestos, Flosal and Atlas 1092 in mixing tests and…
-
Company document · Union Carbide documents · February 4, 1975
R. E. Byrne, Jr. to F. H. Larrison Forwarding National Gypsum (Matteson) Complaint About Damaged Pallets of SG-210 (1975)
Internal Union Carbide memo from R. E. Byrne, Jr. to F. H. Larrison forwarding a January 27, 1975 letter and photographs from Gold Bond Building Products (National Gypsum), Matteson, IL, about car SSW 47542 of SG…
-
Company document · Union Carbide documents · December 19, 1975
R. E. Byrne, Jr. to F. H. Larrison on January 1976 Calidria Production and Shipping Schedules (1975)
Internal Union Carbide Metals Division memo from R. E. Byrne, Jr. to F. H. Larrison at King City sending January production and shipping schedules for Calidria asbestos. It says the order backlog had dropped but every…
-
Company document · Union Carbide documents · May 3, 1976
H. B. Rhodes to F. H. Larrison on Preparing 1800 lb. of COF-25 Asbestos for the FDA Animal Feeding Test (1976)
Internal Union Carbide memo confirming an April 30, 1976 phone call in which the company agreed to supply the National Institute for Environmental Health Sciences, at FDA's request, with 1800 lbs. of COF-25 asbestos…