5 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · October 7, 1986
R. W. Gilbert to B. H. Avashia, W. L. Browning and Others on Asbestos Exposure Monitoring in the Institute Construction Storeroom (1986)
Internal Union Carbide memo reporting asbestos air monitoring done on August 19 and 26, 1986 in the Construction Storeroom, Building 2002, at Institute, while two employees dispensed asbestos gaskets. It describes the results, recommends HEPA vacuum…
-
Company document · Union Carbide documents · April 16, 1986
V. E. Stover to C. K. Campbell on Asbestos Testing of Pipe Insulation Near the Sandblasting Shop, Institute Plant (1986)
Internal correspondence reporting that, at C. K. Campbell's request, insulation samples were collected from three pipelines near the Construction sandblasting shop at the Institute plant, where the insulation was reported to be crumbling. Two of the…
-
Company document · Union Carbide documents · June 19, 1986
V. E. Stover and M. A. Patel to F. R. Sunderland on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1986)
Internal memo transmitting results of personal air monitoring for asbestos on insulators at the Institute Plant, Building 20, on June 4, 1986, during removal of 60 linear feet of asbestos from a 6 inch line and replacement with Kaylo. Two of four…
-
Company document · Union Carbide documents · April 29, 1987
V. E. Stover and H. J. Kimble to H. E. Rucker on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1987)
Internal memo reporting personal air sampling results for two insulators who loaded bagged asbestos for disposal and patched a line at Building 2009 at the Institute Plant. The memo states both samples were below the 0.1 f/cc OSHA action level,…
-
Company document · Union Carbide documents · June 19, 1986
V. E. Stover and M. A. Patel to F. R. Sunderland on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1986)
Internal Union Carbide memo transmitting results of asbestos exposure monitoring of insulators at the Institute Plant, Building 20, on June 4, 1986, while they removed 60 linear feet of asbestos from a 6 inch line and…