1 result for “General Electric”
-
Company document · Union Carbide documents · June 21, 1979
L. R. Noble Memo to D. E. Raines on Safety Inspection of the Insulation Fabrication Shop, Building 2018, with Handwritten Follow-up Notes (1979)
…to D. E. Raines, Safety Inspection - Insulation Fabrication Shop, Building 2018 Attachment (UCC 016791): inspection findings on the tar pot screen, dust at work benches, protective pole, dust collection bin cleaning and respirator, and general observations