  1. Company document · Union Carbide documents · September 12, 1986

    C. P. Maxwell to Browning, Collins, Graham, Keller, Mills, Noble and Rucker Transmitting M. A. Patel's OSHA Amended Asbestos Standard Training Slides (1986)

    A handwritten cover note dated September 12, 1986 from C. P. Maxwell forwards copies of overhead slides that Manhar Patel prepared and used in a training session for Services and Construction Department supervisors on the OSHA amended asbestos…

  2. Company document · Union Carbide documents · November 3, 1983

    Routing Note on Blame in an Incident Report, with Handwritten Approval Comments (1983)

    A small note dated 11-3-83 is pasted on a mostly blacked-out page. Parts of the typed text are crossed out and partly illegible. It says a report is subject to Terry's approval and refers to a conversation about who was to blame for an incident,…

  3. Company document · Union Carbide documents

    Insulation Asbestest Results Forms Logging Asbestos Spot Tests on Insulation and Other Samples (1986-1987)

    A 34-page series of handwritten entries on a preprinted 'Insulation Asbestest Results Form'. Each entry gives a sample date, who submitted the sample, the sample source, magnesium and iron test results, the analyst's initials, and remarks. The six…

  4. Company document · Union Carbide documents · June 25, 1987

    Manhar A. Patel to A. F. Terry on Asbestos Bulk Sample Analysis of Pipe Insulation in Building 701 (1987)

    Internal Union Carbide memo reporting results of asbestos analysis on two bulk samples submitted by A. F. Terry. The sample labeled Pipe Insulation contained asbestos and the one labeled Paper Pipe Insulation did not; both came…

  5. Company document · Union Carbide documents · July 24, 1986

    V. E. Stover and M. A. Patel to A. F. Terry on Asbestos Exposure Monitoring in Building 770 (1986)

    Internal Union Carbide memo reporting asbestos air monitoring on June 23, 1986 in Building 770 while two employees removed about 15 feet of asbestos insulation from a steam line in an air handler. It states the…

  6. Company document · Union Carbide documents · September 15, 1987

    H. E. Rucker, Asbestos Exposure Monitoring at the Institute Plant Pipe Insulation Removal (1987)

    Internal Union Carbide memo transmitting results of personal air monitoring during removal of asbestos insulation from about 180 feet of 6-inch product line in a trench at the Institute Plant. It reports that four of…

  7. Company document · Union Carbide documents · April 23, 1986

    Vance E. Stover to J. D. McCue on Asbestos Testing of Insulation Samples from Building 701 (1986)

    Internal memo reporting test results for asbestos on samples taken from three lines with disturbed outer coating in the basement of building 701. It states all samples contain asbestos and lists handling precautions. A second page is an Insulation…

  8. Company document · Union Carbide documents · August 28, 1987

    Vance E. Stover and Manhar A. Patel to A. F. Terry on Asbestos Exposure Monitoring of Insulators and Carpenters in Building 701 (1987)

    Internal Union Carbide memo reporting asbestos exposure monitoring of two insulators and two carpenters during asbestos stripping and enclosure moving in Building 701 on August 17-21, 1987. It states that insulator results were above the…

  9. Company document · Union Carbide documents · September 28, 1987

    H. E. Rucker on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1987)

    Internal Union Carbide memo reporting the results of asbestos exposure monitoring on insulators who removed asbestos from steam and product lines in a pit and trench at building 25 near the #2 dock at the Institute…

  10. Company document · Union Carbide documents · September 18, 1987

    Industrial Hygiene (EM&TS - HS&EA) to H. E. Rucker on Asbestos Exposure Monitoring During Pumphouse Pipe Stripping (1987)

    Internal Union Carbide memo transmitting results of asbestos air monitoring done during removal of asbestos insulation from about 310 feet of pipe at the #1 Pumphouse and about 50 square feet from a reactor at Building…

  11. Company document · Union Carbide documents · July 23, 1987

    Industrial Hygiene to H. E. Rucker on Asbestos Exposure Monitoring During Pipe Insulation Removal at the Institute Plant (1987)

    Internal Union Carbide memo reporting asbestos air monitoring on insulators who stripped about 195 feet of 3-inch steam line at the Institute Plant tank farm. It states that all personal samples were below the 0…

  12. Company document · Union Carbide documents · April 29, 1987

    V. E. Stover and H. J. Kimble to H. E. Rucker on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1987)

    Internal memo reporting personal air sampling results for two insulators who loaded bagged asbestos for disposal and patched a line at Building 2009 at the Institute Plant. The memo states both samples were below the 0.1 f/cc OSHA action level,…

  13. Company document · Union Carbide documents · May 27, 1987

    Industrial Hygiene (V. E. Stover and M. A. Patel) to A. F. Terry on Asbestos Exposure Monitoring During Insulation Removal in Building 705 (1987)

    Internal correspondence reporting asbestos air monitoring done on May 7, 1987 on two workers who dry-removed about 50 feet of pipe insulation in the Building 705 electrical room. The memo says results were more than five times the OSHA 0.2 fiber/cc…

  14. Company document · Union Carbide documents · March 20, 1987

    C. A. Eddy to E. C. Buford and Others on March 19, 1987 Meeting Minutes, Methyls Columns Asbestos Insulation Removal at Sistersville (1987)

    Minutes, dated March 20, 1987, of a March 19, 1987 meeting at the Sistersville Plant to plan removal of asbestos insulation from six methyls columns. They list 19 items on the handling of each column, use of a negative pressure enclosure, area…

  15. Company document · Union Carbide documents · March 26, 1987

    Manhar A. Patel to J. W. Barna and Others on Asbestos Competent Person Training at the Technical Center (1987)

    Internal Union Carbide memo announcing a three-day asbestos competent person training course to be given by the National Asbestos Training Center (University of Kansas) at the Technical Center on April 8-10, 1987. It cites…

  16. Company document · Union Carbide documents · April 3, 1987

    V. E. Stover and M. A. Patel to A. F. Terry on Asbestos Exposure Monitoring of J. W. Greenlee (1987)

    Internal correspondence transmitting the results of personal asbestos exposure monitoring of J. W. Greenlee on March 20, 1987, while he stripped asbestos insulation and tape from lines in Building 740 basement and salvage piles near Buildings 771…